Commissioning and building performance
We take off your hands: drafting commissioning reports from test sheets and BMS data, chasing missing certificates and watching the BMS after handover.
You get: draft commissioning and test reports, a list of items still missing a certificate and BMS faults flagged, for your commissioning engineers to check.
Get a price for thisOr check first: Are we ready for AI?
The problem
Commissioning paperwork always holds up handover.
What is in this package
- Turn defects found on service visits into priced remedial quotes
- Find missing commissioning and test certificates before handover
- Read reactive job requests from emails and client portals and log them ready for dispatch
- Turn engineer notes into customer-ready service reports
- Draft commissioning reports from BMS trend data and test sheets
- Audit inherited certificates and records when you take over a contract
- Check fire alarm handover packs against the design before issue
- Draft inspection and test plans from the specification and package scope
- Offer BMS maintenance clients monthly fault-finding on their system data
- Capture a 360 photo record of services before ceilings, walls and trenches close
- Data centre plant order to integrated systems test and turnoverWhole process
- Fire alarm commissioning to client handoverWhole process
- Plan and record factory acceptance tests for major plant before it ships
- Remote BMS monitoring to fixed fault and monthly performance reportWhole process
- Pipework pressure test to commissioned and seasonally proven systemWhole process
- Give each engineer a short brief on the site and asset before the visit
- Give clients a guarantee register with the maintenance each one needs
- Record pressure, air and water tests section by section against the drawing
26 more parts, which a call confirms.
We price a whole package as one build (our rule). A call confirms it.
What it needs to work
- Points schedule
- BMS data access
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?