Built Logic

See what AI can do

Commissioning and building performance

We take off your hands: drafting the commissioning reports from the test sheets and BMS data. Chasing any certificate that is still to come. Keeping an eye on the BMS after handover.

You get: draft commissioning and test reports. A list of each item that still has no certificate. Faults on the BMS flagged up. All for your commissioning engineers to check.

Get a price for this

Or check first: Are we ready for AI?

The problem

At handover, we are always held up by the paperwork for commissioning.

What is in this package

26 more parts, which a call confirms.

See how each process runs, before and after

We price a whole package as one build (our rule). A call confirms it.

What it needs to work

  • Points schedule
  • BMS data access

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Data centre plant order to integrated systems test and turnover

Before, by hand

Plan the testing

Test the systems

Report and turn over

01Plan and record factory acceptance tests for major plant before it ships

  • Book a test for each item
  • Send procedures and invites
  • Log results and open items
  • Accept or reject each test
  • Flag kit due to ship with faults

02Coordinate the commissioning programme and witness tests across packages

  • Link tests to what comes first
  • Flag what's ready
  • Book the witnesses
  • Track each result
  • Run the tests
  • Certify the results

03Track system completion and turnover packages by system, with punch items, before commissioning starts

  • Tag each record to a system
  • Track punch items by system
  • Flag blocked systems
  • Build the turnover packs
  • Sign test records
  • Sign off each system

04Generate integrated systems test scripts and cause-and-effect test lists from the design

  • Read the fire strategy and matrices
  • List every interface
  • Draft each test step and result
  • List trades and what must be ready
  • Approve the scripts
  • Witness the tests

05Draft methods of procedure for work on live critical systems and route them through the client's change approval

  • Draft it from past approved MOPs
  • Check for missing back-out steps
  • Submit it for change approval
  • Track comments and approval
  • Check every step
  • Carry out the switching

06Capture witness test results and sign-offs live, and keep the issues list current

  • Log results against the script
  • Type up engineer comments
  • Raise issues as they come up
  • Build the witness record
  • Sign each test
  • Close the issues

07Draft commissioning reports from BMS trend data and test sheets

  • Read the BMS trend data
  • Check against setpoints and sequences
  • Build the charts and pass tables
  • Draft the narrative
  • List open issues
  • Check and sign the report

08Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the testing

Test the systems

Report and turn over

01Plan and record factory acceptance tests for major plant before it ships

  • Automated: Book a test for each item
  • Automated: Send procedures and invites
  • Automated: Log results and open items
  • Your team decides: Accept or reject each test
  • Automated: Flag kit due to ship with faults

Passes on: the FATs witnessed and logged, with open items by asset tag

02Coordinate the commissioning programme and witness tests across packages

  • Automated: Link tests to what comes first
  • Automated: Flag what's ready
  • Automated: Book the witnesses
  • Automated: Track each result
  • Your team decides: Run the tests
  • Your team decides: Certify the results

Passes on: a test plan by level, with each level closed until the last is clear

03Track system completion and turnover packages by system, with punch items, before commissioning starts

  • AI reads and drafts: Tag each record to a system
  • Automated: Track punch items by system
  • Automated: Flag blocked systems
  • Automated: Build the turnover packs
  • Your team decides: Sign test records
  • Your team decides: Sign off each system

Passes on: the punch items, tests and certs for each system, and which are ready

04Generate integrated systems test scripts and cause-and-effect test lists from the design

  • AI reads and drafts: Read the fire strategy and matrices
  • AI reads and drafts: List every interface
  • AI reads and drafts: Draft each test step and result
  • AI reads and drafts: List trades and what must be ready
  • Your team decides: Approve the scripts
  • Your team decides: Witness the tests

Passes on: a test script for each failure, like loss of mains, and what should happen

05Draft methods of procedure for work on live critical systems and route them through the client's change approval

  • AI reads and drafts: Draft it from past approved MOPs
  • AI reads and drafts: Check for missing back-out steps
  • Automated: Submit it for change approval
  • Automated: Track comments and approval
  • Your team decides: Check every step
  • Your team decides: Carry out the switching

Passes on: a MOP for each switching step on live plant, sent for the client's OK

06Capture witness test results and sign-offs live, and keep the issues list current

  • Automated: Log results against the script
  • AI reads and drafts: Type up engineer comments
  • Automated: Raise issues as they come up
  • Automated: Build the witness record
  • Your team decides: Sign each test
  • Your team decides: Close the issues

Passes on: each test step taken live, and any failed step logged with an owner

07Draft commissioning reports from BMS trend data and test sheets

  • AI reads and drafts: Read the BMS trend data
  • AI reads and drafts: Check against setpoints and sequences
  • Automated: Build the charts and pass tables
  • AI reads and drafts: Draft the narrative
  • AI reads and drafts: List open issues
  • Your team decides: Check and sign the report

Passes on: a draft report from the BMS trends and the test sheets

08Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Ends with: a check that each asset has its certs, with any gaps listed

18automated14by AI15decided by your team

Before, by hand

Plan the testing

1Plan factory tests
2Plan the commissioning
3Track system completion

Test the systems

4Draft the test scripts
5Draft the MOP
6Record the witness tests

Report and turn over

7Draft the test report
8Check the certificates

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the testing

1Plan factory tests

Automated: Book a test for each item

Automated: Send procedures and invites

Automated: Log results and open items

Your team decides: Accept or reject each test

Automated: Flag kit due to ship with faults

Passes on: the FATs witnessed and logged, with open items by asset tag

2Plan the commissioning

Automated: Link tests to what comes first

Automated: Flag what's ready

Automated: Book the witnesses

Automated: Track each result

Your team decides: Run the tests

Your team decides: Certify the results

Passes on: a test plan by level, with each level closed until the last is clear

3Track system completion

AI reads and drafts: Tag each record to a system

Automated: Track punch items by system

Automated: Flag blocked systems

Automated: Build the turnover packs

Your team decides: Sign test records

Your team decides: Sign off each system

Passes on: the punch items, tests and certs for each system, and which are ready

Test the systems

4Draft the test scripts

AI reads and drafts: Read the fire strategy and matrices

AI reads and drafts: List every interface

AI reads and drafts: Draft each test step and result

AI reads and drafts: List trades and what must be ready

Your team decides: Approve the scripts

Your team decides: Witness the tests

Passes on: a test script for each failure, like loss of mains, and what should happen

5Draft the MOP

AI reads and drafts: Draft it from past approved MOPs

AI reads and drafts: Check for missing back-out steps

Automated: Submit it for change approval

Automated: Track comments and approval

Your team decides: Check every step

Your team decides: Carry out the switching

Passes on: a MOP for each switching step on live plant, sent for the client's OK

6Record the witness tests

Automated: Log results against the script

AI reads and drafts: Type up engineer comments

Automated: Raise issues as they come up

Automated: Build the witness record

Your team decides: Sign each test

Your team decides: Close the issues

Passes on: each test step taken live, and any failed step logged with an owner

Report and turn over

7Draft the test report

AI reads and drafts: Read the BMS trend data

AI reads and drafts: Check against setpoints and sequences

Automated: Build the charts and pass tables

AI reads and drafts: Draft the narrative

AI reads and drafts: List open issues

Your team decides: Check and sign the report

Passes on: a draft report from the BMS trends and the test sheets

8Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Ends with: a check that each asset has its certs, with any gaps listed

18automated

14by AI

15decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Fire alarm commissioning to client handover

Before, by hand

Test and witness

Check the handover

Train and register

01Generate integrated systems test scripts and cause-and-effect test lists from the design

  • Read the fire strategy and matrices
  • List every interface
  • Draft each test step and result
  • List trades and what must be ready
  • Approve the scripts
  • Witness the tests

02Capture witness test results and sign-offs live, and keep the issues list current

  • Log results against the script
  • Type up engineer comments
  • Raise issues as they come up
  • Build the witness record
  • Sign each test
  • Close the issues

03Check fire alarm handover packs against the design before issue

  • Check each document is there
  • Check it matches the design
  • List the gaps
  • Draft the cover sheet
  • Resolve the gaps
  • Sign the certificates

04Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

05Plan and record the client's training and demonstration sessions at handover

  • Pull training needs from the spec
  • Book each session
  • Deliver the training
  • Record who attended
  • Store recordings by asset
  • Confirm it is done

06Give clients a guarantee register with the maintenance each one needs

  • Read the terms of each guarantee
  • List the upkeep each one needs
  • Build the dates calendar
  • Check terms against each certificate
  • Send the client reminders
  • Log the proof that comes back

36tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Test and witness

Check the handover

Train and register

01Generate integrated systems test scripts and cause-and-effect test lists from the design

  • AI reads and drafts: Read the fire strategy and matrices
  • AI reads and drafts: List every interface
  • AI reads and drafts: Draft each test step and result
  • AI reads and drafts: List trades and what must be ready
  • Your team decides: Approve the scripts
  • Your team decides: Witness the tests

Passes on: cause and effect tests from the design, with each link to lifts and doors

02Capture witness test results and sign-offs live, and keep the issues list current

  • Automated: Log results against the script
  • AI reads and drafts: Type up engineer comments
  • Automated: Raise issues as they come up
  • Automated: Build the witness record
  • Your team decides: Sign each test
  • Your team decides: Close the issues

Passes on: each result and sign-off taken live, and the issues list kept up to date

03Check fire alarm handover packs against the design before issue

  • Automated: Check each document is there
  • AI reads and drafts: Check it matches the design
  • AI reads and drafts: List the gaps
  • AI reads and drafts: Draft the cover sheet
  • Your team decides: Resolve the gaps
  • Your team decides: Sign the certificates

Passes on: the handover set checked to the design

04Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Passes on: a check that each device has all its certs

05Plan and record the client's training and demonstration sessions at handover

  • AI reads and drafts: Pull training needs from the spec
  • Automated: Book each session
  • Your team decides: Deliver the training
  • Automated: Record who attended
  • Automated: Store recordings by asset
  • Your team decides: Confirm it is done

Passes on: the training for the person in charge, planned and on record

06Give clients a guarantee register with the maintenance each one needs

  • AI reads and drafts: Read the terms of each guarantee
  • AI reads and drafts: List the upkeep each one needs
  • Automated: Build the dates calendar
  • Your team decides: Check terms against each certificate
  • Automated: Send the client reminders
  • Automated: Log the proof that comes back

Ends with: a register of guarantees, and the upkeep each one needs

11automated13by AI12decided by your team

Before, by hand

Test and witness

1Draft the test scripts
2Record the witness tests

Check the handover

3Check the handover pack
4Check the certificates

Train and register

5Plan the client training
6Build the guarantee register

36tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Test and witness

1Draft the test scripts

AI reads and drafts: Read the fire strategy and matrices

AI reads and drafts: List every interface

AI reads and drafts: Draft each test step and result

AI reads and drafts: List trades and what must be ready

Your team decides: Approve the scripts

Your team decides: Witness the tests

Passes on: cause and effect tests from the design, with each link to lifts and doors

2Record the witness tests

Automated: Log results against the script

AI reads and drafts: Type up engineer comments

Automated: Raise issues as they come up

Automated: Build the witness record

Your team decides: Sign each test

Your team decides: Close the issues

Passes on: each result and sign-off taken live, and the issues list kept up to date

Check the handover

3Check the handover pack

Automated: Check each document is there

AI reads and drafts: Check it matches the design

AI reads and drafts: List the gaps

AI reads and drafts: Draft the cover sheet

Your team decides: Resolve the gaps

Your team decides: Sign the certificates

Passes on: the handover set checked to the design

4Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Passes on: a check that each device has all its certs

Train and register

5Plan the client training

AI reads and drafts: Pull training needs from the spec

Automated: Book each session

Your team decides: Deliver the training

Automated: Record who attended

Automated: Store recordings by asset

Your team decides: Confirm it is done

Passes on: the training for the person in charge, planned and on record

6Build the guarantee register

AI reads and drafts: Read the terms of each guarantee

AI reads and drafts: List the upkeep each one needs

Automated: Build the dates calendar

Your team decides: Check terms against each certificate

Automated: Send the client reminders

Automated: Log the proof that comes back

Ends with: a register of guarantees, and the upkeep each one needs

11automated

13by AI

12decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Remote BMS monitoring to fixed fault and monthly performance report

Before, by hand

Watch the system

Fix the fault

Report

01Back up building controls configurations on a schedule and prove they restore

  • Collect backups by site and device
  • Check files are complete and recent
  • Alert on stale backups
  • Schedule test restores
  • Do the restores
  • Set how often to test

02Offer BMS maintenance clients monthly fault-finding on their system data

  • Run the fault rules
  • Score each fault's impact
  • Group related issues
  • Draft the report and work orders
  • Check each finding
  • Fix it on site

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Filter engineers who are in date
  • Rank by travel and van stock
  • Show the reasons
  • Warn when nobody fits
  • Decide who goes

04Turn engineer notes into customer-ready service reports

  • Write up the voice note
  • Pull out readings, parts and defects
  • Link the photos
  • Draft the report in your format
  • List defects to quote
  • Confirm the report and readings

05Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

06Send building owners a monthly energy and plant performance report from BMS and meter data

  • Pull meter and BMS data
  • Adjust for weather and use
  • Spot out-of-hours running
  • Draft the monthly report
  • Check the changes advised
  • Approve the report

35tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Watch the system

Fix the fault

Report

01Back up building controls configurations on a schedule and prove they restore

  • Automated: Collect backups by site and device
  • Automated: Check files are complete and recent
  • Automated: Alert on stale backups
  • Automated: Schedule test restores
  • Your team decides: Do the restores
  • Your team decides: Set how often to test

Passes on: a backup of each controller, with a test that it restores

02Offer BMS maintenance clients monthly fault-finding on their system data

  • Automated: Run the fault rules
  • AI reads and drafts: Score each fault's impact
  • AI reads and drafts: Group related issues
  • AI reads and drafts: Draft the report and work orders
  • Your team decides: Check each finding
  • Your team decides: Fix it on site

Passes on: a ranked list of faults from the BMS data, with draft work orders

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Automated: Filter engineers who are in date
  • AI reads and drafts: Rank by travel and van stock
  • AI reads and drafts: Show the reasons
  • Automated: Warn when nobody fits
  • Your team decides: Decide who goes

Passes on: the right engineer for the site visit

04Turn engineer notes into customer-ready service reports

  • AI reads and drafts: Write up the voice note
  • AI reads and drafts: Pull out readings, parts and defects
  • Automated: Link the photos
  • AI reads and drafts: Draft the report in your format
  • AI reads and drafts: List defects to quote
  • Your team decides: Confirm the report and readings

Passes on: a job report from the engineer's notes and photos

05Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Passes on: a priced quote for work outside the contract

06Send building owners a monthly energy and plant performance report from BMS and meter data

  • Automated: Pull meter and BMS data
  • Automated: Adjust for weather and use
  • AI reads and drafts: Spot out-of-hours running
  • AI reads and drafts: Draft the monthly report
  • Your team decides: Check the changes advised
  • Your team decides: Approve the report

Ends with: a monthly energy and plant report, with a list of actions

13automated12by AI10decided by your team

Before, by hand

Watch the system

1Back up the controls
2Find BMS faults

Fix the fault

3Pick the right engineer
4Draft the job report
5Quote the remedials

Report

6Report energy and plant

35tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Watch the system

1Back up the controls

Automated: Collect backups by site and device

Automated: Check files are complete and recent

Automated: Alert on stale backups

Automated: Schedule test restores

Your team decides: Do the restores

Your team decides: Set how often to test

Passes on: a backup of each controller, with a test that it restores

2Find BMS faults

Automated: Run the fault rules

AI reads and drafts: Score each fault's impact

AI reads and drafts: Group related issues

AI reads and drafts: Draft the report and work orders

Your team decides: Check each finding

Your team decides: Fix it on site

Passes on: a ranked list of faults from the BMS data, with draft work orders

Fix the fault

3Pick the right engineer

Automated: Filter engineers who are in date

AI reads and drafts: Rank by travel and van stock

AI reads and drafts: Show the reasons

Automated: Warn when nobody fits

Your team decides: Decide who goes

Passes on: the right engineer for the site visit

4Draft the job report

AI reads and drafts: Write up the voice note

AI reads and drafts: Pull out readings, parts and defects

Automated: Link the photos

AI reads and drafts: Draft the report in your format

AI reads and drafts: List defects to quote

Your team decides: Confirm the report and readings

Passes on: a job report from the engineer's notes and photos

5Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Passes on: a priced quote for work outside the contract

Report

6Report energy and plant

Automated: Pull meter and BMS data

Automated: Adjust for weather and use

AI reads and drafts: Spot out-of-hours running

AI reads and drafts: Draft the monthly report

Your team decides: Check the changes advised

Your team decides: Approve the report

Ends with: a monthly energy and plant report, with a list of actions

13automated

12by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Pipework pressure test to commissioned and seasonally proven system

Before, by hand

Test and record

Commission

Prove it in use

01Record pressure, air and water tests section by section against the drawing

  • Log each test by section
  • Read the gauge photos
  • Check results against the spec
  • Show what is tested on the drawing
  • Witness and sign each test

02Capture a 360 photo record of services before ceilings, walls and trenches close

  • Remind the team to take photos
  • Take the photos
  • Pin photos to the plans
  • Tag what can be seen
  • Check coverage against the schedule
  • Review gaps before close-up

03Coordinate the commissioning programme and witness tests across packages

  • Link tests to what comes first
  • Flag what's ready
  • Book the witnesses
  • Track each result
  • Run the tests
  • Certify the results

04Draft commissioning reports from BMS trend data and test sheets

  • Read the BMS trend data
  • Check against setpoints and sequences
  • Build the charts and pass tables
  • Draft the narrative
  • List open issues
  • Check and sign the report

05Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

06Compare summer and winter plant performance for seasonal commissioning

  • Pull trend data for the season
  • Split it by weather and load
  • Compare with design and first results
  • Flag where it falls short
  • Confirm findings and adjust

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Test and record

Commission

Prove it in use

01Record pressure, air and water tests section by section against the drawing

  • Automated: Log each test by section
  • AI reads and drafts: Read the gauge photos
  • Automated: Check results against the spec
  • Automated: Show what is tested on the drawing
  • Your team decides: Witness and sign each test

Passes on: the test for each section, with its cert linked to the drawing

02Capture a 360 photo record of services before ceilings, walls and trenches close

  • Automated: Remind the team to take photos
  • Your team decides: Take the photos
  • AI reads and drafts: Pin photos to the plans
  • AI reads and drafts: Tag what can be seen
  • Automated: Check coverage against the schedule
  • Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

03Coordinate the commissioning programme and witness tests across packages

  • Automated: Link tests to what comes first
  • Automated: Flag what's ready
  • Automated: Book the witnesses
  • Automated: Track each result
  • Your team decides: Run the tests
  • Your team decides: Certify the results

Passes on: a plan to commission it all, and the dates for witness tests

04Draft commissioning reports from BMS trend data and test sheets

  • AI reads and drafts: Read the BMS trend data
  • AI reads and drafts: Check against setpoints and sequences
  • Automated: Build the charts and pass tables
  • AI reads and drafts: Draft the narrative
  • AI reads and drafts: List open issues
  • Your team decides: Check and sign the report

Passes on: draft reports from the test sheets and the BMS trend data

05Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

06Compare summer and winter plant performance for seasonal commissioning

  • Automated: Pull trend data for the season
  • Automated: Split it by weather and load
  • AI reads and drafts: Compare with design and first results
  • AI reads and drafts: Flag where it falls short
  • Your team decides: Confirm findings and adjust

Ends with: how the plant runs in summer and in winter, set side by side

13automated11by AI10decided by your team

Before, by hand

Test and record

1Record the pressure tests
2Record before close-up

Commission

3Plan the commissioning
4Draft the test report
5Check the certificates

Prove it in use

6Compare the seasons

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Test and record

1Record the pressure tests

Automated: Log each test by section

AI reads and drafts: Read the gauge photos

Automated: Check results against the spec

Automated: Show what is tested on the drawing

Your team decides: Witness and sign each test

Passes on: the test for each section, with its cert linked to the drawing

2Record before close-up

Automated: Remind the team to take photos

Your team decides: Take the photos

AI reads and drafts: Pin photos to the plans

AI reads and drafts: Tag what can be seen

Automated: Check coverage against the schedule

Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

Commission

3Plan the commissioning

Automated: Link tests to what comes first

Automated: Flag what's ready

Automated: Book the witnesses

Automated: Track each result

Your team decides: Run the tests

Your team decides: Certify the results

Passes on: a plan to commission it all, and the dates for witness tests

4Draft the test report

AI reads and drafts: Read the BMS trend data

AI reads and drafts: Check against setpoints and sequences

Automated: Build the charts and pass tables

AI reads and drafts: Draft the narrative

AI reads and drafts: List open issues

Your team decides: Check and sign the report

Passes on: draft reports from the test sheets and the BMS trend data

5Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

Prove it in use

6Compare the seasons

Automated: Pull trend data for the season

Automated: Split it by weather and load

AI reads and drafts: Compare with design and first results

AI reads and drafts: Flag where it falls short

Your team decides: Confirm findings and adjust

Ends with: how the plant runs in summer and in winter, set side by side

13automated

11by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.