Built Logic

See what AI can do

Capture a 360 photo record of services before ceilings, walls and trenches close

We take off your hands: keeping a photo record of services, fire-stopping and fixings. Doing it before each area is closed up. Finding them again later.

You get: a photo record you can search by room and date, pinned to the drawings. A report on what the photos cover. Your quality manager checks it before close-up.

Get a price for this

Or check first: Are we ready for AI?

The problem

When something goes wrong behind a ceiling we have to rip it out to see what is there.

How it works

  1. What comes in

    • Close-up schedule, drawings, 360 or phone photos, fire-stopping and inspection records
  2. What AI does

    Prompts capture, maps images to plans, tags visible elements, checks coverage against the schedule and indexes for search.

  3. What you get

    • Searchable visual record by room and date, coverage report, links into the handover and golden thread files
  4. Who signs it off

    Your site team takes the photos. Your quality manager looks at any gaps before close-up is approved.

What it needs to work

  • 360 camera or disciplined phone capture
  • Drawing set

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors
  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Inspection and test plan to signed-off work before close-up

Before, by hand

Plan the checks

Test and record

Fix and record

01Draft inspection and test plans from the specification and package scope

  • Pull testable items from the spec
  • Note the acceptance criteria
  • Set out lines and hold points
  • Confirm unclear criteria
  • Agree and approve each plan

02Warn the site team before work is covered up without its hold-point inspection signed off

  • Map cover-up tasks to work below
  • Check sign-off and photos
  • Alert the site team
  • Sign the hold point
  • Decide whether to proceed

03Track material test results such as concrete cubes against the specification and flag failures

  • Read each lab report
  • Link results to the element
  • Compare with the spec
  • Alert on failures
  • Update the register
  • Decide on retests or repairs

This step04Capture a 360 photo record of services before ceilings, walls and trenches close

  • Remind the team to take photos
  • Take the photos
  • Pin photos to the plans
  • Tag what can be seen
  • Check coverage against the schedule
  • Review gaps before close-up

05Raise NCRs from site, find the root causes and track them to close

  • Draft the NCR from photos and notes
  • Route it and track it
  • Sort each one by cause
  • Spot trends each quarter
  • Agree the fix and root cause
  • Confirm it is closed

06Find the defects that keep recurring across projects and feed them back to design and buying

  • Tidy the defect wording
  • Group defects by cause
  • Estimate what each costs to fix
  • Draft the changes to make
  • Send them to design and buying
  • Decide changes to standards

07Check as-built drawings against the drawing register, RFIs and site changes

  • List changes made on site
  • Check each shows on the drawings
  • Report the gaps
  • Confirm what needs fixing

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the checks

Test and record

Fix and record

01Draft inspection and test plans from the specification and package scope

  • AI reads and drafts: Pull testable items from the spec
  • AI reads and drafts: Note the acceptance criteria
  • AI reads and drafts: Set out lines and hold points
  • Your team decides: Confirm unclear criteria
  • Your team decides: Agree and approve each plan

Passes on: ITPs drafted from the spec and the package scope

02Warn the site team before work is covered up without its hold-point inspection signed off

  • AI reads and drafts: Map cover-up tasks to work below
  • Automated: Check sign-off and photos
  • Automated: Alert the site team
  • Your team decides: Sign the hold point
  • Your team decides: Decide whether to proceed

Passes on: a warning if work is about to be covered before its hold point is signed

03Track material test results such as concrete cubes against the specification and flag failures

  • AI reads and drafts: Read each lab report
  • AI reads and drafts: Link results to the element
  • Automated: Compare with the spec
  • Automated: Alert on failures
  • Automated: Update the register
  • Your team decides: Decide on retests or repairs

Passes on: test results, such as cubes, set against the spec

This step04Capture a 360 photo record of services before ceilings, walls and trenches close

  • Automated: Remind the team to take photos
  • Your team decides: Take the photos
  • AI reads and drafts: Pin photos to the plans
  • AI reads and drafts: Tag what can be seen
  • Automated: Check coverage against the schedule
  • Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

05Raise NCRs from site, find the root causes and track them to close

  • AI reads and drafts: Draft the NCR from photos and notes
  • Automated: Route it and track it
  • AI reads and drafts: Sort each one by cause
  • AI reads and drafts: Spot trends each quarter
  • Your team decides: Agree the fix and root cause
  • Your team decides: Confirm it is closed

Passes on: an NCR with its root cause, tracked to close

06Find the defects that keep recurring across projects and feed them back to design and buying

  • AI reads and drafts: Tidy the defect wording
  • AI reads and drafts: Group defects by cause
  • AI reads and drafts: Estimate what each costs to fix
  • AI reads and drafts: Draft the changes to make
  • Automated: Send them to design and buying
  • Your team decides: Decide changes to standards

Passes on: defects that keep coming back, fed back to design and buying

07Check as-built drawings against the drawing register, RFIs and site changes

  • AI reads and drafts: List changes made on site
  • AI reads and drafts: Check each shows on the drawings
  • Automated: Report the gaps
  • Your team decides: Confirm what needs fixing

Ends with: as-builts that match what was built, the RFIs and site changes

10automated17by AI11decided by your team

Before, by hand

Plan the checks

1Draft the ITPs
2Check before close-up

Test and record

3Track test results
4Record before close-upThis step

Fix and record

5Raise and close NCRs
6Find repeat defects
7Check the as-builts

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the checks

1Draft the ITPs

AI reads and drafts: Pull testable items from the spec

AI reads and drafts: Note the acceptance criteria

AI reads and drafts: Set out lines and hold points

Your team decides: Confirm unclear criteria

Your team decides: Agree and approve each plan

Passes on: ITPs drafted from the spec and the package scope

2Check before close-up

AI reads and drafts: Map cover-up tasks to work below

Automated: Check sign-off and photos

Automated: Alert the site team

Your team decides: Sign the hold point

Your team decides: Decide whether to proceed

Passes on: a warning if work is about to be covered before its hold point is signed

Test and record

3Track test results

AI reads and drafts: Read each lab report

AI reads and drafts: Link results to the element

Automated: Compare with the spec

Automated: Alert on failures

Automated: Update the register

Your team decides: Decide on retests or repairs

Passes on: test results, such as cubes, set against the spec

4Record before close-upThis step

Automated: Remind the team to take photos

Your team decides: Take the photos

AI reads and drafts: Pin photos to the plans

AI reads and drafts: Tag what can be seen

Automated: Check coverage against the schedule

Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

Fix and record

5Raise and close NCRs

AI reads and drafts: Draft the NCR from photos and notes

Automated: Route it and track it

AI reads and drafts: Sort each one by cause

AI reads and drafts: Spot trends each quarter

Your team decides: Agree the fix and root cause

Your team decides: Confirm it is closed

Passes on: an NCR with its root cause, tracked to close

6Find repeat defects

AI reads and drafts: Tidy the defect wording

AI reads and drafts: Group defects by cause

AI reads and drafts: Estimate what each costs to fix

AI reads and drafts: Draft the changes to make

Automated: Send them to design and buying

Your team decides: Decide changes to standards

Passes on: defects that keep coming back, fed back to design and buying

7Check the as-builts

AI reads and drafts: List changes made on site

AI reads and drafts: Check each shows on the drawings

Automated: Report the gaps

Your team decides: Confirm what needs fixing

Ends with: as-builts that match what was built, the RFIs and site changes

10automated

17by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.