Handover, building safety and defects
We take off your hands: chasing handover documents, certificates, fire-stopping evidence and O&M manuals, and tracking snags and defects to close.
You get: handover documents and certificates tracked from day one, draft O&M sections and retention applications on time, for your project managers to check.
Get a price for thisOr check first: Are we ready for AI?
The problem
The O&M manuals are always late and hold up our retention.
What is in this package
- Track handover documents from the start of the job so nothing is chased at the end
- Record fire-stopping evidence for every penetration and check nothing is closed up without it
- Chase and check sub-trade and safety certificates for handover, including empty homes returned to landlords
- Report how ready the project is for practical completion
- Find missing commissioning and test certificates before handover
- Capture snags by voice and photo, or from a client's inspection list, assign them to trades and track them to close
- Draft O&M manual sections and check them against the O&M specification
- Put together the building control pack as test results come in
- Chase building control and warranty certificates in England, Wales and Northern Ireland
- Build manufacturer warranty packs as the work goes on, area by area
- Compile the health and safety file for handover to the client
- Snag capture to end-of-defects certificateWhole process
- Inspection and test plan to signed-off work before close-upWhole process
- Draft inspection and test plans from the specification and package scope
- Capture a 360 photo record of services before ceilings, walls and trenches close
- Check each plot's Part L photos are complete before details are covered
- Handover documents from day one to practical completion and aftercareWhole process
- Raise NCRs from site, find the root causes and track them to close
- Trace a latent defect claim back to the records, subcontractor and warranties
- Run reported defects through to the end-of-defects certificate
- Give clients a guarantee register with the maintenance each one needs
- Run aftercare visits, seasonal checks and occupant surveys after handover
19 more parts, which a call confirms.
We price a whole package as one build (our rule). A call confirms it.
What it needs to work
- Contract handover requirements
- A common data environment
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
- Developers and housebuilders