Compile the health and safety file for handover to the client
We take off your hands: pulling residual risks, as-builts, materials and services details from the job records into the health and safety file.
You get: a draft health and safety file in the client's structure, with a list of what is missing, for the principal designer to complete and hand over.
Get a price for thisOr check first: Are we ready for AI?
The problem
The health and safety file is always the last thing done, and done badly.
How it works
What comes in
- Designer risk registers, as-builts, material records, O&M information, site records
What AI does
Extracts relevant content, organises into the required structure, flags gaps.
What you get
- Draft health and safety file and gap list
Who signs it off
The principal designer prepares and owns the file. The principal contractor adds to it and reviews it.
What it needs to work
- Design and construction records accessible
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
- Developers and housebuilders
- Surveyors and cost consultants
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?