Built Logic

See what AI can do

Build manufacturer warranty packs as the work goes on, area by area

We take off your hands: chasing the photos and inspection records. Chasing the batch details too. Getting all that each maker needs before it will issue a warranty.

You get: a live list of warranty gaps by elevation, roof area or floor. At completion, the warranty application pack. Your contracts manager confirms it.

Get a price for this

Or check first: Are we ready for AI?

The problem

We can't get our retention back. We're still chasing the warranty papers.

How it works

  1. What comes in

    • Manufacturer warranty requirements, site photos, inspection reports, delivery and batch records
  2. What AI does

    Builds a requirement list per warranty, files evidence as it arrives, and tracks gaps by area.

  3. What you get

    • Live warranty gap list, warranty application pack, handover documents
  4. Who signs it off

    Your contracts manager checks each pack is all there. Then the maker issues the warranty.

What it needs to work

  • Manufacturer requirement lists
  • Photo capture by site teams

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Cladding installation to inspected bays and warranty pack

Before, by hand

Plan and inspect

Test and fix

Warranty and upkeep

01Prepare task-specific RAMS for review

  • Pick the right templates
  • Fit them to the site and task
  • List permits and checks
  • Put it in the client's format
  • Review and sign the RAMS
  • Brief the crew

02Record cavity barrier and fixing checks with photos before they are covered

  • Check each photo shows the detail
  • Track which bays are done
  • Alert on missing bays
  • Inspect and sign each bay
  • Build the inspection log

03Warn the site team before work is covered up without its hold-point inspection signed off

  • Map cover-up tasks to work below
  • Check sign-off and photos
  • Alert the site team
  • Sign the hold point
  • Decide whether to proceed

04Link curtain walling, roof, podium, basement and wet room water test results to each tested location and track retests

  • Read each test report
  • Pin results to each location
  • Track fails to retest
  • Check the plan is done before finishes
  • Agree the remedials

05Raise NCRs from site, find the root causes and track them to close

  • Draft the NCR from photos and notes
  • Route it and track it
  • Sort each one by cause
  • Spot trends each quarter
  • Agree the fix and root cause
  • Confirm it is closed

This step06Build manufacturer warranty packs as the work goes on, area by area

  • List what each warranty needs
  • File evidence as it comes in
  • Track gaps by area
  • Build the application pack
  • Confirm it is complete

07Plan facade maintenance inspections and record gasket, sealant and fixing condition for building owners

  • Book each inspection
  • Sort findings by elevation
  • Compare with past visits
  • Confirm the findings
  • Draft the quote and forecast
  • Decide on the works

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan and inspect

Test and fix

Warranty and upkeep

01Prepare task-specific RAMS for review

  • AI reads and drafts: Pick the right templates
  • AI reads and drafts: Fit them to the site and task
  • AI reads and drafts: List permits and checks
  • Automated: Put it in the client's format
  • Your team decides: Review and sign the RAMS
  • Your team decides: Brief the crew

Passes on: task RAMS for the install and the access kit

02Record cavity barrier and fixing checks with photos before they are covered

  • AI reads and drafts: Check each photo shows the detail
  • Automated: Track which bays are done
  • Automated: Alert on missing bays
  • Your team decides: Inspect and sign each bay
  • Automated: Build the inspection log

Passes on: each cavity barrier and fixing check, with a photo and where it is

03Warn the site team before work is covered up without its hold-point inspection signed off

  • AI reads and drafts: Map cover-up tasks to work below
  • Automated: Check sign-off and photos
  • Automated: Alert the site team
  • Your team decides: Sign the hold point
  • Your team decides: Decide whether to proceed

Passes on: a warning before a bay is closed without its hold point signed

04Link curtain walling, roof, podium, basement and wet room water test results to each tested location and track retests

  • AI reads and drafts: Read each test report
  • AI reads and drafts: Pin results to each location
  • Automated: Track fails to retest
  • Automated: Check the plan is done before finishes
  • Your team decides: Agree the remedials

Passes on: each water test tied to where it was done, and any retest tracked

05Raise NCRs from site, find the root causes and track them to close

  • AI reads and drafts: Draft the NCR from photos and notes
  • Automated: Route it and track it
  • AI reads and drafts: Sort each one by cause
  • AI reads and drafts: Spot trends each quarter
  • Your team decides: Agree the fix and root cause
  • Your team decides: Confirm it is closed

Passes on: an NCR raised, its root cause found and tracked to close

This step06Build manufacturer warranty packs as the work goes on, area by area

  • AI reads and drafts: List what each warranty needs
  • Automated: File evidence as it comes in
  • Automated: Track gaps by area
  • Automated: Build the application pack
  • Your team decides: Confirm it is complete

Passes on: the warranty pack, built up one face at a time

07Plan facade maintenance inspections and record gasket, sealant and fixing condition for building owners

  • Automated: Book each inspection
  • AI reads and drafts: Sort findings by elevation
  • AI reads and drafts: Compare with past visits
  • Your team decides: Confirm the findings
  • AI reads and drafts: Draft the quote and forecast
  • Your team decides: Decide on the works

Ends with: a plan of facade checks for the building owner

13automated14by AI11decided by your team

Before, by hand

Plan and inspect

1Draft the RAMS
2Record barrier checks
3Check before close-up

Test and fix

4Map the water tests
5Raise and close NCRs

Warranty and upkeep

6Build the warranty packThis step
7Inspect the facade

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan and inspect

1Draft the RAMS

AI reads and drafts: Pick the right templates

AI reads and drafts: Fit them to the site and task

AI reads and drafts: List permits and checks

Automated: Put it in the client's format

Your team decides: Review and sign the RAMS

Your team decides: Brief the crew

Passes on: task RAMS for the install and the access kit

2Record barrier checks

AI reads and drafts: Check each photo shows the detail

Automated: Track which bays are done

Automated: Alert on missing bays

Your team decides: Inspect and sign each bay

Automated: Build the inspection log

Passes on: each cavity barrier and fixing check, with a photo and where it is

3Check before close-up

AI reads and drafts: Map cover-up tasks to work below

Automated: Check sign-off and photos

Automated: Alert the site team

Your team decides: Sign the hold point

Your team decides: Decide whether to proceed

Passes on: a warning before a bay is closed without its hold point signed

Test and fix

4Map the water tests

AI reads and drafts: Read each test report

AI reads and drafts: Pin results to each location

Automated: Track fails to retest

Automated: Check the plan is done before finishes

Your team decides: Agree the remedials

Passes on: each water test tied to where it was done, and any retest tracked

5Raise and close NCRs

AI reads and drafts: Draft the NCR from photos and notes

Automated: Route it and track it

AI reads and drafts: Sort each one by cause

AI reads and drafts: Spot trends each quarter

Your team decides: Agree the fix and root cause

Your team decides: Confirm it is closed

Passes on: an NCR raised, its root cause found and tracked to close

Warranty and upkeep

6Build the warranty packThis step

AI reads and drafts: List what each warranty needs

Automated: File evidence as it comes in

Automated: Track gaps by area

Automated: Build the application pack

Your team decides: Confirm it is complete

Passes on: the warranty pack, built up one face at a time

7Inspect the facade

Automated: Book each inspection

AI reads and drafts: Sort findings by elevation

AI reads and drafts: Compare with past visits

Your team decides: Confirm the findings

AI reads and drafts: Draft the quote and forecast

Your team decides: Decide on the works

Ends with: a plan of facade checks for the building owner

13automated

14by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.