Built Logic

See what AI can do

Specialist trade site records

We take off your hands: keeping each trade's permits and test records up to date. Logging each inspection. Keeping the warranty and adoption packs up to date too.

You get: test and inspection records for each area, with photos. Warranty and adoption packs built as the work goes. Your quality leads check it all.

Get a price for this

Or check first: Are we ready for AI?

The problem

Our trade paperwork is still on paper. That runs from hot works permits to scaffold inspections.

What it needs to work

  • Inspection apps
  • Trade body rules

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Cladding installation to inspected bays and warranty pack

Before, by hand

Plan and inspect

Test and fix

Warranty and upkeep

01Prepare task-specific RAMS for review

  • Pick the right templates
  • Fit them to the site and task
  • List permits and checks
  • Put it in the client's format
  • Review and sign the RAMS
  • Brief the crew

02Record cavity barrier and fixing checks with photos before they are covered

  • Check each photo shows the detail
  • Track which bays are done
  • Alert on missing bays
  • Inspect and sign each bay
  • Build the inspection log

03Warn the site team before work is covered up without its hold-point inspection signed off

  • Map cover-up tasks to work below
  • Check sign-off and photos
  • Alert the site team
  • Sign the hold point
  • Decide whether to proceed

04Link curtain walling, roof, podium, basement and wet room water test results to each tested location and track retests

  • Read each test report
  • Pin results to each location
  • Track fails to retest
  • Check the plan is done before finishes
  • Agree the remedials

05Raise NCRs from site, find the root causes and track them to close

  • Draft the NCR from photos and notes
  • Route it and track it
  • Sort each one by cause
  • Spot trends each quarter
  • Agree the fix and root cause
  • Confirm it is closed

06Build manufacturer warranty packs as the work goes on, area by area

  • List what each warranty needs
  • File evidence as it comes in
  • Track gaps by area
  • Build the application pack
  • Confirm it is complete

07Plan facade maintenance inspections and record gasket, sealant and fixing condition for building owners

  • Book each inspection
  • Sort findings by elevation
  • Compare with past visits
  • Confirm the findings
  • Draft the quote and forecast
  • Decide on the works

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan and inspect

Test and fix

Warranty and upkeep

01Prepare task-specific RAMS for review

  • AI reads and drafts: Pick the right templates
  • AI reads and drafts: Fit them to the site and task
  • AI reads and drafts: List permits and checks
  • Automated: Put it in the client's format
  • Your team decides: Review and sign the RAMS
  • Your team decides: Brief the crew

Passes on: task RAMS for the install and the access kit

02Record cavity barrier and fixing checks with photos before they are covered

  • AI reads and drafts: Check each photo shows the detail
  • Automated: Track which bays are done
  • Automated: Alert on missing bays
  • Your team decides: Inspect and sign each bay
  • Automated: Build the inspection log

Passes on: each cavity barrier and fixing check, with a photo and where it is

03Warn the site team before work is covered up without its hold-point inspection signed off

  • AI reads and drafts: Map cover-up tasks to work below
  • Automated: Check sign-off and photos
  • Automated: Alert the site team
  • Your team decides: Sign the hold point
  • Your team decides: Decide whether to proceed

Passes on: a warning before a bay is closed without its hold point signed

04Link curtain walling, roof, podium, basement and wet room water test results to each tested location and track retests

  • AI reads and drafts: Read each test report
  • AI reads and drafts: Pin results to each location
  • Automated: Track fails to retest
  • Automated: Check the plan is done before finishes
  • Your team decides: Agree the remedials

Passes on: each water test tied to where it was done, and any retest tracked

05Raise NCRs from site, find the root causes and track them to close

  • AI reads and drafts: Draft the NCR from photos and notes
  • Automated: Route it and track it
  • AI reads and drafts: Sort each one by cause
  • AI reads and drafts: Spot trends each quarter
  • Your team decides: Agree the fix and root cause
  • Your team decides: Confirm it is closed

Passes on: an NCR raised, its root cause found and tracked to close

06Build manufacturer warranty packs as the work goes on, area by area

  • AI reads and drafts: List what each warranty needs
  • Automated: File evidence as it comes in
  • Automated: Track gaps by area
  • Automated: Build the application pack
  • Your team decides: Confirm it is complete

Passes on: the warranty pack, built up one face at a time

07Plan facade maintenance inspections and record gasket, sealant and fixing condition for building owners

  • Automated: Book each inspection
  • AI reads and drafts: Sort findings by elevation
  • AI reads and drafts: Compare with past visits
  • Your team decides: Confirm the findings
  • AI reads and drafts: Draft the quote and forecast
  • Your team decides: Decide on the works

Ends with: a plan of facade checks for the building owner

13automated14by AI11decided by your team

Before, by hand

Plan and inspect

1Draft the RAMS
2Record barrier checks
3Check before close-up

Test and fix

4Map the water tests
5Raise and close NCRs

Warranty and upkeep

6Build the warranty pack
7Inspect the facade

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan and inspect

1Draft the RAMS

AI reads and drafts: Pick the right templates

AI reads and drafts: Fit them to the site and task

AI reads and drafts: List permits and checks

Automated: Put it in the client's format

Your team decides: Review and sign the RAMS

Your team decides: Brief the crew

Passes on: task RAMS for the install and the access kit

2Record barrier checks

AI reads and drafts: Check each photo shows the detail

Automated: Track which bays are done

Automated: Alert on missing bays

Your team decides: Inspect and sign each bay

Automated: Build the inspection log

Passes on: each cavity barrier and fixing check, with a photo and where it is

3Check before close-up

AI reads and drafts: Map cover-up tasks to work below

Automated: Check sign-off and photos

Automated: Alert the site team

Your team decides: Sign the hold point

Your team decides: Decide whether to proceed

Passes on: a warning before a bay is closed without its hold point signed

Test and fix

4Map the water tests

AI reads and drafts: Read each test report

AI reads and drafts: Pin results to each location

Automated: Track fails to retest

Automated: Check the plan is done before finishes

Your team decides: Agree the remedials

Passes on: each water test tied to where it was done, and any retest tracked

5Raise and close NCRs

AI reads and drafts: Draft the NCR from photos and notes

Automated: Route it and track it

AI reads and drafts: Sort each one by cause

AI reads and drafts: Spot trends each quarter

Your team decides: Agree the fix and root cause

Your team decides: Confirm it is closed

Passes on: an NCR raised, its root cause found and tracked to close

Warranty and upkeep

6Build the warranty pack

AI reads and drafts: List what each warranty needs

Automated: File evidence as it comes in

Automated: Track gaps by area

Automated: Build the application pack

Your team decides: Confirm it is complete

Passes on: the warranty pack, built up one face at a time

7Inspect the facade

Automated: Book each inspection

AI reads and drafts: Sort findings by elevation

AI reads and drafts: Compare with past visits

Your team decides: Confirm the findings

AI reads and drafts: Draft the quote and forecast

Your team decides: Decide on the works

Ends with: a plan of facade checks for the building owner

13automated

14by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Scaffold enquiry to inspected, adapted and billed scaffold

Before, by hand

Price and design

Plan and hand over

Inspect and bill

01Price scaffold packages from elevations using the company's scaffold rates, durations and adaptations

  • Measure the elevations
  • Apply your scaffold rules and rates
  • Draft the quote and hire terms
  • Confirm the set-up and design
  • Send non-standard designs to an engineer
  • Check quantities and price

02Check temporary works designs against the design brief and the category of check required

  • Read the drawings and calcs
  • Compare it with the brief
  • Check the certificate and category
  • Flag the gaps
  • Draft queries to the designer
  • Accept or reject the design

03Prepare task-specific RAMS for review

  • Pick the right templates
  • Fit them to the site and task
  • List permits and checks
  • Put it in the client's format
  • Review and sign the RAMS
  • Brief the crew

04Capture scaffold handover certificates and inspections on site and check them before they are issued

  • Pick the right form
  • Inspect and sign the scaffold
  • Check every field and photo
  • Compare it with the design record
  • Send the PDF to the client
  • Update the register and hire date

05Keep the statutory inspection register for scaffolds, excavations, quarry faces and tips, and access equipment in date

  • Log each item to inspect
  • Set each inspection date
  • Read the completed forms
  • Flag overdue or missing checks
  • Inspect and sign
  • Stop use of unchecked kit

06Bill scaffold adaptations, extensions, unauthorised alterations and extra hire from site requests and inspection records

  • Record each alteration
  • Find changes and extra hire to bill
  • Price each one
  • Draft invoices with the proof
  • Approve each charge
  • Handle any dispute

07Track scaffold hire periods and bill extensions as soon as they start

  • Track each hire period
  • Warn before the hire ends
  • Draft the invoice for extra time
  • Find scaffolds up but not billed
  • Confirm the extra time
  • Send the invoices

42tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Price and design

Plan and hand over

Inspect and bill

01Price scaffold packages from elevations using the company's scaffold rates, durations and adaptations

  • AI reads and drafts: Measure the elevations
  • Automated: Apply your scaffold rules and rates
  • AI reads and drafts: Draft the quote and hire terms
  • Your team decides: Confirm the set-up and design
  • Your team decides: Send non-standard designs to an engineer
  • Your team decides: Check quantities and price

Passes on: a price from the elevations, at your own rates and hire times

02Check temporary works designs against the design brief and the category of check required

  • AI reads and drafts: Read the drawings and calcs
  • AI reads and drafts: Compare it with the brief
  • Automated: Check the certificate and category
  • AI reads and drafts: Flag the gaps
  • AI reads and drafts: Draft queries to the designer
  • Your team decides: Accept or reject the design

Passes on: the design checked to the brief and the category of check

03Prepare task-specific RAMS for review

  • AI reads and drafts: Pick the right templates
  • AI reads and drafts: Fit them to the site and task
  • AI reads and drafts: List permits and checks
  • Automated: Put it in the client's format
  • Your team decides: Review and sign the RAMS
  • Your team decides: Brief the crew

Passes on: task RAMS for putting it up

04Capture scaffold handover certificates and inspections on site and check them before they are issued

  • Automated: Pick the right form
  • Your team decides: Inspect and sign the scaffold
  • Automated: Check every field and photo
  • AI reads and drafts: Compare it with the design record
  • Automated: Send the PDF to the client
  • Automated: Update the register and hire date

Passes on: a handover cert with the load class, ties and photos, sent to the client

05Keep the statutory inspection register for scaffolds, excavations, quarry faces and tips, and access equipment in date

  • Automated: Log each item to inspect
  • Automated: Set each inspection date
  • AI reads and drafts: Read the completed forms
  • Automated: Flag overdue or missing checks
  • Your team decides: Inspect and sign
  • Your team decides: Stop use of unchecked kit

Passes on: a check after each change, after bad weather and every 7 days

06Bill scaffold adaptations, extensions, unauthorised alterations and extra hire from site requests and inspection records

  • Your team decides: Record each alteration
  • AI reads and drafts: Find changes and extra hire to bill
  • Automated: Price each one
  • AI reads and drafts: Draft invoices with the proof
  • Your team decides: Approve each charge
  • Your team decides: Handle any dispute

Passes on: each change and any extra hire, billed from site asks and the checks

07Track scaffold hire periods and bill extensions as soon as they start

  • Automated: Track each hire period
  • Automated: Warn before the hire ends
  • AI reads and drafts: Draft the invoice for extra time
  • Automated: Find scaffolds up but not billed
  • Your team decides: Confirm the extra time
  • Your team decides: Send the invoices

Ends with: each hire tracked, and any extra time billed the day it starts

14automated14by AI14decided by your team

Before, by hand

Price and design

1Price the scaffold
2Check the TW design

Plan and hand over

3Draft the RAMS
4Check scaffold handovers

Inspect and bill

5Keep inspections in date
6Bill scaffold changes
7Bill the extra hire

42tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Price and design

1Price the scaffold

AI reads and drafts: Measure the elevations

Automated: Apply your scaffold rules and rates

AI reads and drafts: Draft the quote and hire terms

Your team decides: Confirm the set-up and design

Your team decides: Send non-standard designs to an engineer

Your team decides: Check quantities and price

Passes on: a price from the elevations, at your own rates and hire times

2Check the TW design

AI reads and drafts: Read the drawings and calcs

AI reads and drafts: Compare it with the brief

Automated: Check the certificate and category

AI reads and drafts: Flag the gaps

AI reads and drafts: Draft queries to the designer

Your team decides: Accept or reject the design

Passes on: the design checked to the brief and the category of check

Plan and hand over

3Draft the RAMS

AI reads and drafts: Pick the right templates

AI reads and drafts: Fit them to the site and task

AI reads and drafts: List permits and checks

Automated: Put it in the client's format

Your team decides: Review and sign the RAMS

Your team decides: Brief the crew

Passes on: task RAMS for putting it up

4Check scaffold handovers

Automated: Pick the right form

Your team decides: Inspect and sign the scaffold

Automated: Check every field and photo

AI reads and drafts: Compare it with the design record

Automated: Send the PDF to the client

Automated: Update the register and hire date

Passes on: a handover cert with the load class, ties and photos, sent to the client

Inspect and bill

5Keep inspections in date

Automated: Log each item to inspect

Automated: Set each inspection date

AI reads and drafts: Read the completed forms

Automated: Flag overdue or missing checks

Your team decides: Inspect and sign

Your team decides: Stop use of unchecked kit

Passes on: a check after each change, after bad weather and every 7 days

6Bill scaffold changes

Your team decides: Record each alteration

AI reads and drafts: Find changes and extra hire to bill

Automated: Price each one

AI reads and drafts: Draft invoices with the proof

Your team decides: Approve each charge

Your team decides: Handle any dispute

Passes on: each change and any extra hire, billed from site asks and the checks

7Bill the extra hire

Automated: Track each hire period

Automated: Warn before the hire ends

AI reads and drafts: Draft the invoice for extra time

Automated: Find scaffolds up but not billed

Your team decides: Confirm the extra time

Your team decides: Send the invoices

Ends with: each hire tracked, and any extra time billed the day it starts

14automated

14by AI

14decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.