Price and design
Plan and hand over
Inspect and bill
01Price scaffold packages from elevations using the company's scaffold rates, durations and adaptations
- AI reads and drafts: Measure the elevations
- Automated: Apply your scaffold rules and rates
- AI reads and drafts: Draft the quote and hire terms
- Your team decides: Confirm the set-up and design
- Your team decides: Send non-standard designs to an engineer
- Your team decides: Check quantities and price
Passes on: a price from the elevations, at your own rates and hire times
02Check temporary works designs against the design brief and the category of check required
- AI reads and drafts: Read the drawings and calcs
- AI reads and drafts: Compare it with the brief
- Automated: Check the certificate and category
- AI reads and drafts: Flag the gaps
- AI reads and drafts: Draft queries to the designer
- Your team decides: Accept or reject the design
Passes on: the design checked to the brief and the category of check
03Prepare task-specific RAMS for review
- AI reads and drafts: Pick the right templates
- AI reads and drafts: Fit them to the site and task
- AI reads and drafts: List permits and checks
- Automated: Put it in the client's format
- Your team decides: Review and sign the RAMS
- Your team decides: Brief the crew
Passes on: task RAMS for putting it up
04Capture scaffold handover certificates and inspections on site and check them before they are issued
- Automated: Pick the right form
- Your team decides: Inspect and sign the scaffold
- Automated: Check every field and photo
- AI reads and drafts: Compare it with the design record
- Automated: Send the PDF to the client
- Automated: Update the register and hire date
Passes on: a handover cert with the load class, ties and photos, sent to the client
05Keep the statutory inspection register for scaffolds, excavations, quarry faces and tips, and access equipment in date
- Automated: Log each item to inspect
- Automated: Set each inspection date
- AI reads and drafts: Read the completed forms
- Automated: Flag overdue or missing checks
- Your team decides: Inspect and sign
- Your team decides: Stop use of unchecked kit
Passes on: a check after each change, after bad weather and every 7 days
06Bill scaffold adaptations, extensions, unauthorised alterations and extra hire from site requests and inspection records
- Your team decides: Record each alteration
- AI reads and drafts: Find changes and extra hire to bill
- Automated: Price each one
- AI reads and drafts: Draft invoices with the proof
- Your team decides: Approve each charge
- Your team decides: Handle any dispute
Passes on: each change and any extra hire, billed from site asks and the checks
This step07Track scaffold hire periods and bill extensions as soon as they start
- Automated: Track each hire period
- Automated: Warn before the hire ends
- AI reads and drafts: Draft the invoice for extra time
- Automated: Find scaffolds up but not billed
- Your team decides: Confirm the extra time
- Your team decides: Send the invoices
Ends with: each hire tracked, and any extra time billed the day it starts