Built Logic

See what AI can do

Scaffold enquiry to inspected, adapted and billed scaffold

We take off your hands: pricing scaffolds from elevations, keeping inspections in date and billing every adaptation, alteration and hire extension.

You get: a draft scaffold price from the elevations, handover certificates and inspections checked before issue, and draft invoices for every adaptation and extra hire.

Get a price for this

Or check first: Are we ready for AI?

The problem

We do adaptations on a phone call and never bill half of them.

How the steps join up

It starts when: a main contractor or client asks for a scaffold.

  1. Price scaffold packages from elevations using the company's scaffold rates, durations and adaptations

    Your team checks and decides at this step.

  2. Check temporary works designs against the design brief and the category of check required

    Your team checks and decides at this step.

  3. Prepare task-specific RAMS for review

  4. Capture scaffold handover certificates and inspections on site and check them before they are issued

    Your team checks and decides at this step.

  5. Keep the statutory inspection register for scaffolds, excavations, quarry faces and tips, and access equipment in date

    Your team checks and decides at this step.

  6. Bill scaffold adaptations, extensions, unauthorised alterations and extra hire from site requests and inspection records

    Your team checks and decides at this step.

  7. Track scaffold hire periods and bill extensions as soon as they start

One more step, which a call confirms.

What you end up with: The scaffold is priced from the elevations, designed where needed, erected under RAMS, inspected on time and every adaptation and hire extension is billed.

Who signs it off: Your scaffold designer and temporary works coordinator approve designs, and your inspectors sign every inspection.

What it needs to work

  • Elevation drawings
  • Site requests for adaptations recorded

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?