Record pressure, air and water tests section by section against the drawing
We take off your hands: keeping test records and gauge photos for every section of pipework, ductwork and drainage before it is covered.
You get: a test register showing your supervisor what is still untested before anything is covered, and certificates by system for the O&M manual.
Get a price for thisOr check first: Are we ready for AI?
The problem
At handover we can't always prove every section was tested before it was boxed in.
How it works
What comes in
- Installation drawings with section references, test records and gauge photos, witness sign-off, specification test requirements
What AI does
Captures each test against its section, checks pressures and duration against the specification, and shows a live tested and untested map.
What you get
- Test register, closing-up readiness list, certificates by system for the O&M manual
Who signs it off
Your supervisor witnesses each test. The main contractor or client's representative signs where required.
What it needs to work
- Section referencing on drawings
- Specification test parameters
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.