Built Logic

See what AI can do

Put together the building control pack as test results come in

We take off your hands: tracking each test result and certificate that building control will ask for. Checking each one. Doing it all before the final inspection.

You get: a compliance pack tracker, set out by each part of the regulations. Failed or missing items are flagged for your project manager.

Get a price for this

Or check first: Are we ready for AI?

The problem

One certificate for building control is missing. So the end of the job slips.

How it works

  1. What comes in

    • Building control conditions, test reports, certificates, design calculations
  2. What AI does

    Builds the required evidence list per regulation, extracts results, compares with targets, reports gaps.

  3. What you get

    • Compliance pack tracker and failure alerts
  4. Who signs it off

    Building control decides if the work meets the rules. Testers sign off their own results.

What it needs to work

  • Building control conditions known early

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors
  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Handover documents from day one to practical completion and aftercare

Before, by hand

Track from day one

Build the handover files

Hand over

Aftercare

01Track handover documents from the start of the job so nothing is chased at the end

  • List what each package must hand over
  • Read each submission
  • Check it's complete and right
  • Chase the gaps
  • Accept the documents
  • Get the final pack accepted

02Chase and check sub-trade and safety certificates for handover, including empty homes returned to landlords

  • Ask for each certificate
  • Read and check each one
  • Chase the gaps
  • File the set
  • Accept the set

03Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

04Draft O&M manual sections and check them against the O&M specification

  • Sort the data sheets
  • Pull asset and maintenance data
  • Draft each section
  • Check it against the O&M spec
  • Check the technical content

05Build the asset register and COBie data from handover documents

  • Read O&Ms and data sheets
  • Pull out each asset's details
  • Map them to the COBie format
  • Check nothing is missing
  • Check serials and locations on site
  • Sign off the register

06Give clients a guarantee register with the maintenance each one needs

  • Read the terms of each guarantee
  • List the upkeep each one needs
  • Build the dates calendar
  • Check terms against each certificate
  • Send the client reminders
  • Log the proof that comes back

07Compile the health and safety file for handover to the client

  • Pick out what the file needs
  • Sort it into the set format
  • Flag the gaps
  • Review the file
  • Approve the file

This step08Put together the building control pack as test results come in

  • List the evidence each rule needs
  • Read results off each test
  • Compare results with targets
  • Alert on failures and gaps
  • Certify the test results

09Report how ready the project is for practical completion

  • Pull status from each tracker
  • Check it against the PC terms
  • Forecast when each item clears
  • Draft the report
  • Certify practical completion

10Plan and record the client's training and demonstration sessions at handover

  • Pull training needs from the spec
  • Book each session
  • Deliver the training
  • Record who attended
  • Store recordings by asset
  • Confirm it is done

11Draft the building user guide for occupants and facilities staff

  • Pick out what users need
  • Rewrite it in plain English
  • Lay it out by topic
  • Check it is accurate
  • Accept the guide

12Run aftercare visits, seasonal checks and occupant surveys after handover

  • Book visits and seasonal checks
  • Pull meter and BMS data
  • Send occupant surveys
  • Carry out the checks
  • Draft the aftercare report
  • Agree actions with the client

13Compare a building's measured energy and comfort with its design targets during Soft Landings aftercare

  • Pull meter and BMS data
  • Compare use with design targets
  • Find the likely causes
  • Draft the review report
  • Agree fixes with the FM team
  • Review before it goes out

72tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Track from day one

Build the handover files

Hand over

Aftercare

01Track handover documents from the start of the job so nothing is chased at the end

  • AI reads and drafts: List what each package must hand over
  • AI reads and drafts: Read each submission
  • AI reads and drafts: Check it's complete and right
  • Automated: Chase the gaps
  • Your team decides: Accept the documents
  • Your team decides: Get the final pack accepted

Passes on: a handover tracker set up from what the contract asks for

02Chase and check sub-trade and safety certificates for handover, including empty homes returned to landlords

  • Automated: Ask for each certificate
  • AI reads and drafts: Read and check each one
  • Automated: Chase the gaps
  • Automated: File the set
  • Your team decides: Accept the set

Passes on: the certs and warranty from each trade, got in and checked

03Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

04Draft O&M manual sections and check them against the O&M specification

  • AI reads and drafts: Sort the data sheets
  • AI reads and drafts: Pull asset and maintenance data
  • AI reads and drafts: Draft each section
  • AI reads and drafts: Check it against the O&M spec
  • Your team decides: Check the technical content

Passes on: the O&M manual drafted and checked to the spec

05Build the asset register and COBie data from handover documents

  • AI reads and drafts: Read O&Ms and data sheets
  • AI reads and drafts: Pull out each asset's details
  • Automated: Map them to the COBie format
  • Automated: Check nothing is missing
  • Your team decides: Check serials and locations on site
  • Your team decides: Sign off the register

Passes on: the asset register and COBie data, from the files you hand over

06Give clients a guarantee register with the maintenance each one needs

  • AI reads and drafts: Read the terms of each guarantee
  • AI reads and drafts: List the upkeep each one needs
  • Automated: Build the dates calendar
  • Your team decides: Check terms against each certificate
  • Automated: Send the client reminders
  • Automated: Log the proof that comes back

Passes on: a list of product guarantees and the upkeep each needs to stay valid

07Compile the health and safety file for handover to the client

  • AI reads and drafts: Pick out what the file needs
  • Automated: Sort it into the set format
  • AI reads and drafts: Flag the gaps
  • Your team decides: Review the file
  • Your team decides: Approve the file

Passes on: the health and safety file, put together

This step08Put together the building control pack as test results come in

  • AI reads and drafts: List the evidence each rule needs
  • AI reads and drafts: Read results off each test
  • Automated: Compare results with targets
  • Automated: Alert on failures and gaps
  • Your team decides: Certify the test results

Passes on: the building control pack, built as test results come in

09Report how ready the project is for practical completion

  • Automated: Pull status from each tracker
  • Automated: Check it against the PC terms
  • Automated: Forecast when each item clears
  • AI reads and drafts: Draft the report
  • Your team decides: Certify practical completion

Passes on: how ready the job is for practical completion

10Plan and record the client's training and demonstration sessions at handover

  • AI reads and drafts: Pull training needs from the spec
  • Automated: Book each session
  • Your team decides: Deliver the training
  • Automated: Record who attended
  • Automated: Store recordings by asset
  • Your team decides: Confirm it is done

Passes on: a plan and a record of each client training session

11Draft the building user guide for occupants and facilities staff

  • AI reads and drafts: Pick out what users need
  • AI reads and drafts: Rewrite it in plain English
  • AI reads and drafts: Lay it out by topic
  • Your team decides: Check it is accurate
  • Your team decides: Accept the guide

Passes on: a user guide for the people in the building and the FM team

12Run aftercare visits, seasonal checks and occupant surveys after handover

  • Automated: Book visits and seasonal checks
  • Automated: Pull meter and BMS data
  • Automated: Send occupant surveys
  • Your team decides: Carry out the checks
  • AI reads and drafts: Draft the aftercare report
  • Your team decides: Agree actions with the client

Passes on: visits and checks after handover, and what the users say

13Compare a building's measured energy and comfort with its design targets during Soft Landings aftercare

  • Automated: Pull meter and BMS data
  • Automated: Compare use with design targets
  • AI reads and drafts: Find the likely causes
  • AI reads and drafts: Draft the review report
  • Your team decides: Agree fixes with the FM team
  • Your team decides: Review before it goes out

Ends with: energy use and comfort as built, set against the design

24automated26by AI22decided by your team

Before, by hand

Track from day one

1Track handover documents
2Collect handover certs
3Check the certificates

Build the handover files

4Draft the O&M sections
5Build the asset register
6Build the guarantee register
7Compile the H&S file
8Build the compliance packThis step

Hand over

9Get ready for PC
10Plan the client training
11Draft the user guide

Aftercare

12Run aftercare
13Compare energy with targets

72tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Track from day one

1Track handover documents

AI reads and drafts: List what each package must hand over

AI reads and drafts: Read each submission

AI reads and drafts: Check it's complete and right

Automated: Chase the gaps

Your team decides: Accept the documents

Your team decides: Get the final pack accepted

Passes on: a handover tracker set up from what the contract asks for

2Collect handover certs

Automated: Ask for each certificate

AI reads and drafts: Read and check each one

Automated: Chase the gaps

Automated: File the set

Your team decides: Accept the set

Passes on: the certs and warranty from each trade, got in and checked

3Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

Build the handover files

4Draft the O&M sections

AI reads and drafts: Sort the data sheets

AI reads and drafts: Pull asset and maintenance data

AI reads and drafts: Draft each section

AI reads and drafts: Check it against the O&M spec

Your team decides: Check the technical content

Passes on: the O&M manual drafted and checked to the spec

5Build the asset register

AI reads and drafts: Read O&Ms and data sheets

AI reads and drafts: Pull out each asset's details

Automated: Map them to the COBie format

Automated: Check nothing is missing

Your team decides: Check serials and locations on site

Your team decides: Sign off the register

Passes on: the asset register and COBie data, from the files you hand over

6Build the guarantee register

AI reads and drafts: Read the terms of each guarantee

AI reads and drafts: List the upkeep each one needs

Automated: Build the dates calendar

Your team decides: Check terms against each certificate

Automated: Send the client reminders

Automated: Log the proof that comes back

Passes on: a list of product guarantees and the upkeep each needs to stay valid

7Compile the H&S file

AI reads and drafts: Pick out what the file needs

Automated: Sort it into the set format

AI reads and drafts: Flag the gaps

Your team decides: Review the file

Your team decides: Approve the file

Passes on: the health and safety file, put together

8Build the compliance packThis step

AI reads and drafts: List the evidence each rule needs

AI reads and drafts: Read results off each test

Automated: Compare results with targets

Automated: Alert on failures and gaps

Your team decides: Certify the test results

Passes on: the building control pack, built as test results come in

Hand over

9Get ready for PC

Automated: Pull status from each tracker

Automated: Check it against the PC terms

Automated: Forecast when each item clears

AI reads and drafts: Draft the report

Your team decides: Certify practical completion

Passes on: how ready the job is for practical completion

10Plan the client training

AI reads and drafts: Pull training needs from the spec

Automated: Book each session

Your team decides: Deliver the training

Automated: Record who attended

Automated: Store recordings by asset

Your team decides: Confirm it is done

Passes on: a plan and a record of each client training session

11Draft the user guide

AI reads and drafts: Pick out what users need

AI reads and drafts: Rewrite it in plain English

AI reads and drafts: Lay it out by topic

Your team decides: Check it is accurate

Your team decides: Accept the guide

Passes on: a user guide for the people in the building and the FM team

Aftercare

12Run aftercare

Automated: Book visits and seasonal checks

Automated: Pull meter and BMS data

Automated: Send occupant surveys

Your team decides: Carry out the checks

AI reads and drafts: Draft the aftercare report

Your team decides: Agree actions with the client

Passes on: visits and checks after handover, and what the users say

13Compare energy with targets

Automated: Pull meter and BMS data

Automated: Compare use with design targets

AI reads and drafts: Find the likely causes

AI reads and drafts: Draft the review report

Your team decides: Agree fixes with the FM team

Your team decides: Review before it goes out

Ends with: energy use and comfort as built, set against the design

24automated

26by AI

22decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.