Built Logic

See what AI can do

Plan and record factory acceptance tests for major plant before it ships

We take off your hands: booking witnesses for each factory test on plant with a long lead time. Sending out the test procedures. Chasing failed items.

You get: a factory test calendar. Signed test records for each asset tag. A list of open items. A register of plant cleared to ship, for your commissioning manager.

Get a price for this

Or check first: Are we ready for AI?

The problem

Plant turns up on site with faults we should have caught at the factory.

How it works

  1. What comes in

    • Procurement schedule, specification test clauses, supplier test procedures, witness list and availability, factory test reports
  2. What AI does

    Creates a test event per item, schedules it against the delivery date, sends procedures and invitations, captures results and punch items, and flags any item due to ship with open faults.

  3. What you get

    • Factory test calendar, signed test records per asset tag, open item list and a cleared-to-ship register
  4. Who signs it off

    Your commissioning manager accepts or rejects each test. So does the client's witness. The supplier's engineer runs it.

What it needs to work

  • Asset tag list, supplier cooperation in sharing reports, a test procedure for each plant type

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors
  • Manufacturers and suppliers

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Data centre plant order to integrated systems test and turnover

Before, by hand

Plan the testing

Test the systems

Report and turn over

This step01Plan and record factory acceptance tests for major plant before it ships

  • Book a test for each item
  • Send procedures and invites
  • Log results and open items
  • Accept or reject each test
  • Flag kit due to ship with faults

02Coordinate the commissioning programme and witness tests across packages

  • Link tests to what comes first
  • Flag what's ready
  • Book the witnesses
  • Track each result
  • Run the tests
  • Certify the results

03Track system completion and turnover packages by system, with punch items, before commissioning starts

  • Tag each record to a system
  • Track punch items by system
  • Flag blocked systems
  • Build the turnover packs
  • Sign test records
  • Sign off each system

04Generate integrated systems test scripts and cause-and-effect test lists from the design

  • Read the fire strategy and matrices
  • List every interface
  • Draft each test step and result
  • List trades and what must be ready
  • Approve the scripts
  • Witness the tests

05Draft methods of procedure for work on live critical systems and route them through the client's change approval

  • Draft it from past approved MOPs
  • Check for missing back-out steps
  • Submit it for change approval
  • Track comments and approval
  • Check every step
  • Carry out the switching

06Capture witness test results and sign-offs live, and keep the issues list current

  • Log results against the script
  • Type up engineer comments
  • Raise issues as they come up
  • Build the witness record
  • Sign each test
  • Close the issues

07Draft commissioning reports from BMS trend data and test sheets

  • Read the BMS trend data
  • Check against setpoints and sequences
  • Build the charts and pass tables
  • Draft the narrative
  • List open issues
  • Check and sign the report

08Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the testing

Test the systems

Report and turn over

This step01Plan and record factory acceptance tests for major plant before it ships

  • Automated: Book a test for each item
  • Automated: Send procedures and invites
  • Automated: Log results and open items
  • Your team decides: Accept or reject each test
  • Automated: Flag kit due to ship with faults

Passes on: the FATs witnessed and logged, with open items by asset tag

02Coordinate the commissioning programme and witness tests across packages

  • Automated: Link tests to what comes first
  • Automated: Flag what's ready
  • Automated: Book the witnesses
  • Automated: Track each result
  • Your team decides: Run the tests
  • Your team decides: Certify the results

Passes on: a test plan by level, with each level closed until the last is clear

03Track system completion and turnover packages by system, with punch items, before commissioning starts

  • AI reads and drafts: Tag each record to a system
  • Automated: Track punch items by system
  • Automated: Flag blocked systems
  • Automated: Build the turnover packs
  • Your team decides: Sign test records
  • Your team decides: Sign off each system

Passes on: the punch items, tests and certs for each system, and which are ready

04Generate integrated systems test scripts and cause-and-effect test lists from the design

  • AI reads and drafts: Read the fire strategy and matrices
  • AI reads and drafts: List every interface
  • AI reads and drafts: Draft each test step and result
  • AI reads and drafts: List trades and what must be ready
  • Your team decides: Approve the scripts
  • Your team decides: Witness the tests

Passes on: a test script for each failure, like loss of mains, and what should happen

05Draft methods of procedure for work on live critical systems and route them through the client's change approval

  • AI reads and drafts: Draft it from past approved MOPs
  • AI reads and drafts: Check for missing back-out steps
  • Automated: Submit it for change approval
  • Automated: Track comments and approval
  • Your team decides: Check every step
  • Your team decides: Carry out the switching

Passes on: a MOP for each switching step on live plant, sent for the client's OK

06Capture witness test results and sign-offs live, and keep the issues list current

  • Automated: Log results against the script
  • AI reads and drafts: Type up engineer comments
  • Automated: Raise issues as they come up
  • Automated: Build the witness record
  • Your team decides: Sign each test
  • Your team decides: Close the issues

Passes on: each test step taken live, and any failed step logged with an owner

07Draft commissioning reports from BMS trend data and test sheets

  • AI reads and drafts: Read the BMS trend data
  • AI reads and drafts: Check against setpoints and sequences
  • Automated: Build the charts and pass tables
  • AI reads and drafts: Draft the narrative
  • AI reads and drafts: List open issues
  • Your team decides: Check and sign the report

Passes on: a draft report from the BMS trends and the test sheets

08Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Ends with: a check that each asset has its certs, with any gaps listed

18automated14by AI15decided by your team

Before, by hand

Plan the testing

1Plan factory testsThis step
2Plan the commissioning
3Track system completion

Test the systems

4Draft the test scripts
5Draft the MOP
6Record the witness tests

Report and turn over

7Draft the test report
8Check the certificates

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the testing

1Plan factory testsThis step

Automated: Book a test for each item

Automated: Send procedures and invites

Automated: Log results and open items

Your team decides: Accept or reject each test

Automated: Flag kit due to ship with faults

Passes on: the FATs witnessed and logged, with open items by asset tag

2Plan the commissioning

Automated: Link tests to what comes first

Automated: Flag what's ready

Automated: Book the witnesses

Automated: Track each result

Your team decides: Run the tests

Your team decides: Certify the results

Passes on: a test plan by level, with each level closed until the last is clear

3Track system completion

AI reads and drafts: Tag each record to a system

Automated: Track punch items by system

Automated: Flag blocked systems

Automated: Build the turnover packs

Your team decides: Sign test records

Your team decides: Sign off each system

Passes on: the punch items, tests and certs for each system, and which are ready

Test the systems

4Draft the test scripts

AI reads and drafts: Read the fire strategy and matrices

AI reads and drafts: List every interface

AI reads and drafts: Draft each test step and result

AI reads and drafts: List trades and what must be ready

Your team decides: Approve the scripts

Your team decides: Witness the tests

Passes on: a test script for each failure, like loss of mains, and what should happen

5Draft the MOP

AI reads and drafts: Draft it from past approved MOPs

AI reads and drafts: Check for missing back-out steps

Automated: Submit it for change approval

Automated: Track comments and approval

Your team decides: Check every step

Your team decides: Carry out the switching

Passes on: a MOP for each switching step on live plant, sent for the client's OK

6Record the witness tests

Automated: Log results against the script

AI reads and drafts: Type up engineer comments

Automated: Raise issues as they come up

Automated: Build the witness record

Your team decides: Sign each test

Your team decides: Close the issues

Passes on: each test step taken live, and any failed step logged with an owner

Report and turn over

7Draft the test report

AI reads and drafts: Read the BMS trend data

AI reads and drafts: Check against setpoints and sequences

Automated: Build the charts and pass tables

AI reads and drafts: Draft the narrative

AI reads and drafts: List open issues

Your team decides: Check and sign the report

Passes on: a draft report from the BMS trends and the test sheets

8Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Ends with: a check that each asset has its certs, with any gaps listed

18automated

14by AI

15decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.