Built Logic

See what AI can do

Data centre plant order to integrated systems test and turnover

We take off your hands: recording factory and witness tests, tracking each system to turnover, writing test scripts and drafting commissioning reports.

You get: every asset tracked level by level, witness results captured live, draft reports for your commissioning engineer and complete records at turnover.

Get a price for this

Or check first: Are we ready for AI?

The problem

Data centre commissioning runs to five levels and hundreds of witness tests, and keeping the evidence straight takes a team.

How the steps join up

It starts when: long-lead power and cooling plant is ordered for a data centre with levelled commissioning in the specification.

  1. Plan and record factory acceptance tests for major plant before it ships

    Your team checks and decides at this step.

  2. Coordinate the commissioning programme and witness tests across packages

  3. Track system completion and turnover packages by system, with punch items, before commissioning starts

    Your team checks and decides at this step.

  4. Generate integrated systems test scripts and cause-and-effect test lists from the design

    Your team checks and decides at this step.

  5. Draft methods of procedure for work on live critical systems and route them through the client's change approval

    Your team checks and decides at this step.

  6. Capture witness test results and sign-offs live, and keep the issues list current

    Your team checks and decides at this step.

  7. Draft commissioning reports from BMS trend data and test sheets

    Your team checks and decides at this step.

  8. Find missing commissioning and test certificates before handover

What you end up with: Every asset has passed each commissioning level in order, integrated systems tests are witnessed and recorded, and systems are turned over to the client with complete records.

Who signs it off: The client accepts tests, approves live-work methods and signs completion with your completions manager. Your commissioning engineer issues reports.

What it needs to work

  • An agreed system breakdown, consistent asset tags, the client's commissioning specification and witness availability

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?