Built Logic

See what AI can do

Draft commissioning reports from BMS trend data and test sheets

We take off your hands: writing up each commissioning report. Pulling it from the BMS trend logs and test sheets. Adding the balancing results and witness records.

You get: a draft commissioning report in your format. It has charts, pass or fail tables and a list of what's still open. Your commissioning engineer checks it.

Get a price for this

Or check first: Are we ready for AI?

The problem

Our commissioning engineers spend more time on reports. Less of it goes on the commissioning.

How it works

  1. What comes in

    • BMS trend exports, test sheets, specification and sequences of operation, witness records
  2. What AI does

    Parses trends, checks against setpoints and expected sequences, generates charts and pass or fail tables, and drafts narrative.

  3. What you get

    • Draft commissioning report, outstanding issues list
  4. Who signs it off

    Your commissioning engineer checks the results. Then they sign the report off.

What it needs to work

  • Trend data exports from the BMS (for example Trend, Tridium, Schneider)
  • Report template

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Pipework pressure test to commissioned and seasonally proven system

Before, by hand

Test and record

Commission

Prove it in use

01Record pressure, air and water tests section by section against the drawing

  • Log each test by section
  • Read the gauge photos
  • Check results against the spec
  • Show what is tested on the drawing
  • Witness and sign each test

02Capture a 360 photo record of services before ceilings, walls and trenches close

  • Remind the team to take photos
  • Take the photos
  • Pin photos to the plans
  • Tag what can be seen
  • Check coverage against the schedule
  • Review gaps before close-up

03Coordinate the commissioning programme and witness tests across packages

  • Link tests to what comes first
  • Flag what's ready
  • Book the witnesses
  • Track each result
  • Run the tests
  • Certify the results

This step04Draft commissioning reports from BMS trend data and test sheets

  • Read the BMS trend data
  • Check against setpoints and sequences
  • Build the charts and pass tables
  • Draft the narrative
  • List open issues
  • Check and sign the report

05Find missing commissioning and test certificates before handover

  • Read each certificate
  • Match it to its item by tag
  • List gaps by system and floor
  • Chase the missing ones
  • Accept each one
  • Sign off commissioning

06Compare summer and winter plant performance for seasonal commissioning

  • Pull trend data for the season
  • Split it by weather and load
  • Compare with design and first results
  • Flag where it falls short
  • Confirm findings and adjust

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Test and record

Commission

Prove it in use

01Record pressure, air and water tests section by section against the drawing

  • Automated: Log each test by section
  • AI reads and drafts: Read the gauge photos
  • Automated: Check results against the spec
  • Automated: Show what is tested on the drawing
  • Your team decides: Witness and sign each test

Passes on: the test for each section, with its cert linked to the drawing

02Capture a 360 photo record of services before ceilings, walls and trenches close

  • Automated: Remind the team to take photos
  • Your team decides: Take the photos
  • AI reads and drafts: Pin photos to the plans
  • AI reads and drafts: Tag what can be seen
  • Automated: Check coverage against the schedule
  • Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

03Coordinate the commissioning programme and witness tests across packages

  • Automated: Link tests to what comes first
  • Automated: Flag what's ready
  • Automated: Book the witnesses
  • Automated: Track each result
  • Your team decides: Run the tests
  • Your team decides: Certify the results

Passes on: a plan to commission it all, and the dates for witness tests

This step04Draft commissioning reports from BMS trend data and test sheets

  • AI reads and drafts: Read the BMS trend data
  • AI reads and drafts: Check against setpoints and sequences
  • Automated: Build the charts and pass tables
  • AI reads and drafts: Draft the narrative
  • AI reads and drafts: List open issues
  • Your team decides: Check and sign the report

Passes on: draft reports from the test sheets and the BMS trend data

05Find missing commissioning and test certificates before handover

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to its item by tag
  • Automated: List gaps by system and floor
  • Your team decides: Chase the missing ones
  • Your team decides: Accept each one
  • Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

06Compare summer and winter plant performance for seasonal commissioning

  • Automated: Pull trend data for the season
  • Automated: Split it by weather and load
  • AI reads and drafts: Compare with design and first results
  • AI reads and drafts: Flag where it falls short
  • Your team decides: Confirm findings and adjust

Ends with: how the plant runs in summer and in winter, set side by side

13automated11by AI10decided by your team

Before, by hand

Test and record

1Record the pressure tests
2Record before close-up

Commission

3Plan the commissioning
4Draft the test reportThis step
5Check the certificates

Prove it in use

6Compare the seasons

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Test and record

1Record the pressure tests

Automated: Log each test by section

AI reads and drafts: Read the gauge photos

Automated: Check results against the spec

Automated: Show what is tested on the drawing

Your team decides: Witness and sign each test

Passes on: the test for each section, with its cert linked to the drawing

2Record before close-up

Automated: Remind the team to take photos

Your team decides: Take the photos

AI reads and drafts: Pin photos to the plans

AI reads and drafts: Tag what can be seen

Automated: Check coverage against the schedule

Your team decides: Review gaps before close-up

Passes on: 360 photos of all services before they are covered up

Commission

3Plan the commissioning

Automated: Link tests to what comes first

Automated: Flag what's ready

Automated: Book the witnesses

Automated: Track each result

Your team decides: Run the tests

Your team decides: Certify the results

Passes on: a plan to commission it all, and the dates for witness tests

4Draft the test reportThis step

AI reads and drafts: Read the BMS trend data

AI reads and drafts: Check against setpoints and sequences

Automated: Build the charts and pass tables

AI reads and drafts: Draft the narrative

AI reads and drafts: List open issues

Your team decides: Check and sign the report

Passes on: draft reports from the test sheets and the BMS trend data

5Check the certificates

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to its item by tag

Automated: List gaps by system and floor

Your team decides: Chase the missing ones

Your team decides: Accept each one

Your team decides: Sign off commissioning

Passes on: a test and commissioning cert, checked for each item put in

Prove it in use

6Compare the seasons

Automated: Pull trend data for the season

Automated: Split it by weather and load

AI reads and drafts: Compare with design and first results

AI reads and drafts: Flag where it falls short

Your team decides: Confirm findings and adjust

Ends with: how the plant runs in summer and in winter, set side by side

13automated

11by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.