Built Logic

See what AI can do

Inspection and certification office

We take off your hands: writing up each inspection report. Checking each certificate before it goes out. Booking in the renewals. Pricing any remedial work you find.

You get: draft reports with coding and consistency errors flagged. A full renewal diary. Draft quotes for the remedial work. All for your office team to check.

Get a price for this

Or check first: Are we ready for AI?

The problem

Our inspectors spend hours on reports. They have to type them all up.

What is in this package

24 more parts, which a call confirms.

See how each process runs, before and after

We price a whole package as one build (our rule). A call confirms it.

What it needs to work

  • Instrument data export
  • Certification software

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Landlord gas safety checks to issued records with no unsafe appliance left open

Before, by hand

Book the visit

Check and issue

Follow up

01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • List what falls due
  • Approve the reminder wording
  • Send reminders with booking slots
  • Log each reply
  • Book the job in
  • Handle tricky replies

02Book access appointments with residents and homeowners for works in occupied homes, and cut no-access visits

  • Offer and confirm a slot
  • Send the reminders
  • Log how each visit went
  • Send no-access letters
  • Update each day's work list
  • Speak to vulnerable residents

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Filter engineers who are in date
  • Rank by travel and van stock
  • Show the reasons
  • Warn when nobody fits
  • Decide who goes

04Turn engineer notes into customer-ready service reports

  • Write up the voice note
  • Pull out readings, parts and defects
  • Link the photos
  • Draft the report in your format
  • List defects to quote
  • Confirm the report and readings

05Check every gas safety record before it goes to the client

  • Check each record against the list
  • Raise jobs for defects
  • Track due dates and access
  • Review the exceptions
  • Report by client

06Prepare the evidence bundle when a tenant keeps refusing a gas check

  • Collect every attempt in order
  • Check it against the landlord's rules
  • Draft the timeline
  • Flag what is missing
  • Confirm your own visit notes

07Explain inspection results in plain English for landlords and managing agents

  • Sum up the outcome plainly
  • Order actions by urgency
  • Link the remedial quote
  • Approve the summary

08Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

43tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Book the visit

Check and issue

Follow up

01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • Automated: List what falls due
  • Your team decides: Approve the reminder wording
  • Automated: Send reminders with booking slots
  • Automated: Log each reply
  • Automated: Book the job in
  • Your team decides: Handle tricky replies

Passes on: a list of homes coming due, and rebooking under way

02Book access appointments with residents and homeowners for works in occupied homes, and cut no-access visits

  • Automated: Offer and confirm a slot
  • Automated: Send the reminders
  • Automated: Log how each visit went
  • Automated: Send no-access letters
  • Automated: Update each day's work list
  • Your team decides: Speak to vulnerable residents

Passes on: a slot booked with each tenant, and any no-show booked again

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Automated: Filter engineers who are in date
  • AI reads and drafts: Rank by travel and van stock
  • AI reads and drafts: Show the reasons
  • Automated: Warn when nobody fits
  • Your team decides: Decide who goes

Passes on: a Gas Safe engineer picked by category, place and stock

04Turn engineer notes into customer-ready service reports

  • AI reads and drafts: Write up the voice note
  • AI reads and drafts: Pull out readings, parts and defects
  • Automated: Link the photos
  • AI reads and drafts: Draft the report in your format
  • AI reads and drafts: List defects to quote
  • Your team decides: Confirm the report and readings

Passes on: a job report from the engineer's notes and photos

05Check every gas safety record before it goes to the client

  • AI reads and drafts: Check each record against the list
  • Automated: Raise jobs for defects
  • Automated: Track due dates and access
  • Your team decides: Review the exceptions
  • Automated: Report by client

Passes on: the record checked, and a follow-up for each unsafe item or home not seen

06Prepare the evidence bundle when a tenant keeps refusing a gas check

  • Automated: Collect every attempt in order
  • AI reads and drafts: Check it against the landlord's rules
  • AI reads and drafts: Draft the timeline
  • AI reads and drafts: Flag what is missing
  • Your team decides: Confirm your own visit notes

Passes on: a dated bundle of proof for each home that keeps refusing access

07Explain inspection results in plain English for landlords and managing agents

  • AI reads and drafts: Sum up the outcome plainly
  • AI reads and drafts: Order actions by urgency
  • Automated: Link the remedial quote
  • Your team decides: Approve the summary

Passes on: a plain English summary for the landlord or agent

08Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Ends with: a priced quote to repair or replace, for the landlord to approve

20automated13by AI10decided by your team

Before, by hand

Book the visit

1Book the renewals
2Book visits with residents
3Pick the right engineer

Check and issue

4Draft the job report
5Check gas safety records

Follow up

6Build the no-access bundle
7Explain the results
8Quote the remedials

43tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Book the visit

1Book the renewals

Automated: List what falls due

Your team decides: Approve the reminder wording

Automated: Send reminders with booking slots

Automated: Log each reply

Automated: Book the job in

Your team decides: Handle tricky replies

Passes on: a list of homes coming due, and rebooking under way

2Book visits with residents

Automated: Offer and confirm a slot

Automated: Send the reminders

Automated: Log how each visit went

Automated: Send no-access letters

Automated: Update each day's work list

Your team decides: Speak to vulnerable residents

Passes on: a slot booked with each tenant, and any no-show booked again

3Pick the right engineer

Automated: Filter engineers who are in date

AI reads and drafts: Rank by travel and van stock

AI reads and drafts: Show the reasons

Automated: Warn when nobody fits

Your team decides: Decide who goes

Passes on: a Gas Safe engineer picked by category, place and stock

Check and issue

4Draft the job report

AI reads and drafts: Write up the voice note

AI reads and drafts: Pull out readings, parts and defects

Automated: Link the photos

AI reads and drafts: Draft the report in your format

AI reads and drafts: List defects to quote

Your team decides: Confirm the report and readings

Passes on: a job report from the engineer's notes and photos

5Check gas safety records

AI reads and drafts: Check each record against the list

Automated: Raise jobs for defects

Automated: Track due dates and access

Your team decides: Review the exceptions

Automated: Report by client

Passes on: the record checked, and a follow-up for each unsafe item or home not seen

Follow up

6Build the no-access bundle

Automated: Collect every attempt in order

AI reads and drafts: Check it against the landlord's rules

AI reads and drafts: Draft the timeline

AI reads and drafts: Flag what is missing

Your team decides: Confirm your own visit notes

Passes on: a dated bundle of proof for each home that keeps refusing access

7Explain the results

AI reads and drafts: Sum up the outcome plainly

AI reads and drafts: Order actions by urgency

Automated: Link the remedial quote

Your team decides: Approve the summary

Passes on: a plain English summary for the landlord or agent

8Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Ends with: a priced quote to repair or replace, for the landlord to approve

20automated

13by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Landlord EICRs from due date to remedials closed within 28 days

Before, by hand

Book the visits

Check and explain

Fix in 28 days

01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • List what falls due
  • Approve the reminder wording
  • Send reminders with booking slots
  • Log each reply
  • Book the job in
  • Handle tricky replies

02Book access appointments with residents and homeowners for works in occupied homes, and cut no-access visits

  • Offer and confirm a slot
  • Send the reminders
  • Log how each visit went
  • Send no-access letters
  • Update each day's work list
  • Speak to vulnerable residents

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Filter engineers who are in date
  • Rank by travel and van stock
  • Show the reasons
  • Warn when nobody fits
  • Decide who goes

04Check each electrical installation condition report before issue and track coded defects to the landlord's 28-day deadline

  • Check the report is complete
  • Code and sign the report
  • Flag reports for the supervisor
  • Review flagged reports
  • Start the 28 day clock
  • Draft the completion note

05Explain inspection results in plain English for landlords and managing agents

  • Sum up the outcome plainly
  • Order actions by urgency
  • Link the remedial quote
  • Approve the summary

06Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

07Chase unanswered remedial quotes and track which ones are won

  • Set a follow-up for each quote
  • Draft the chase emails
  • Approve each message
  • Match replies to quotes
  • Track which quotes are won
  • Sign any formal safety letter

39tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Book the visits

Check and explain

Fix in 28 days

01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • Automated: List what falls due
  • Your team decides: Approve the reminder wording
  • Automated: Send reminders with booking slots
  • Automated: Log each reply
  • Automated: Book the job in
  • Your team decides: Handle tricky replies

Passes on: the homes due soon, by landlord, with times booked in

02Book access appointments with residents and homeowners for works in occupied homes, and cut no-access visits

  • Automated: Offer and confirm a slot
  • Automated: Send the reminders
  • Automated: Log how each visit went
  • Automated: Send no-access letters
  • Automated: Update each day's work list
  • Your team decides: Speak to vulnerable residents

Passes on: a slot booked with each tenant, a reminder, and each no-show logged

03Suggest the right engineer for each job using skills, accreditations, location and van stock

  • Automated: Filter engineers who are in date
  • AI reads and drafts: Rank by travel and van stock
  • AI reads and drafts: Show the reasons
  • Automated: Warn when nobody fits
  • Your team decides: Decide who goes

Passes on: an inspector for each visit, picked by place, skill and diary

04Check each electrical installation condition report before issue and track coded defects to the landlord's 28-day deadline

  • Automated: Check the report is complete
  • Your team decides: Code and sign the report
  • Automated: Flag reports for the supervisor
  • Your team decides: Review flagged reports
  • Automated: Start the 28 day clock
  • AI reads and drafts: Draft the completion note

Passes on: each EICR checked, and the 28-day clock started on each C1, C2 or FI

05Explain inspection results in plain English for landlords and managing agents

  • AI reads and drafts: Sum up the outcome plainly
  • AI reads and drafts: Order actions by urgency
  • Automated: Link the remedial quote
  • Your team decides: Approve the summary

Passes on: a plain summary for the landlord: what failed, why, and by when

06Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Passes on: a quote for the coded items, with the 28-day deadline shown

07Chase unanswered remedial quotes and track which ones are won

  • Automated: Set a follow-up for each quote
  • AI reads and drafts: Draft the chase emails
  • Your team decides: Approve each message
  • AI reads and drafts: Match replies to quotes
  • Automated: Track which quotes are won
  • Your team decides: Sign any formal safety letter

Ends with: each quote chased by the days left on its 28-day clock

20automated8by AI11decided by your team

Before, by hand

Book the visits

1Book the renewals
2Book visits with residents
3Pick the right engineer

Check and explain

4Check the EICR
5Explain the results

Fix in 28 days

6Quote the remedials
7Chase the quotes

39tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Book the visits

1Book the renewals

Automated: List what falls due

Your team decides: Approve the reminder wording

Automated: Send reminders with booking slots

Automated: Log each reply

Automated: Book the job in

Your team decides: Handle tricky replies

Passes on: the homes due soon, by landlord, with times booked in

2Book visits with residents

Automated: Offer and confirm a slot

Automated: Send the reminders

Automated: Log how each visit went

Automated: Send no-access letters

Automated: Update each day's work list

Your team decides: Speak to vulnerable residents

Passes on: a slot booked with each tenant, a reminder, and each no-show logged

3Pick the right engineer

Automated: Filter engineers who are in date

AI reads and drafts: Rank by travel and van stock

AI reads and drafts: Show the reasons

Automated: Warn when nobody fits

Your team decides: Decide who goes

Passes on: an inspector for each visit, picked by place, skill and diary

Check and explain

4Check the EICR

Automated: Check the report is complete

Your team decides: Code and sign the report

Automated: Flag reports for the supervisor

Your team decides: Review flagged reports

Automated: Start the 28 day clock

AI reads and drafts: Draft the completion note

Passes on: each EICR checked, and the 28-day clock started on each C1, C2 or FI

5Explain the results

AI reads and drafts: Sum up the outcome plainly

AI reads and drafts: Order actions by urgency

Automated: Link the remedial quote

Your team decides: Approve the summary

Passes on: a plain summary for the landlord: what failed, why, and by when

Fix in 28 days

6Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Passes on: a quote for the coded items, with the 28-day deadline shown

7Chase the quotes

Automated: Set a follow-up for each quote

AI reads and drafts: Draft the chase emails

Your team decides: Approve each message

AI reads and drafts: Match replies to quotes

Automated: Track which quotes are won

Your team decides: Sign any formal safety letter

Ends with: each quote chased by the days left on its 28-day clock

20automated

8by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Multi-site electrical testing programme to a client compliance report

Before, by hand

Plan and brief

Test and check

Explain, quote and report

01Plan large multi-site testing programmes around shutdowns, access windows and engineer capacity

  • Group sites by area
  • Schedule around access and shutdowns
  • Match work to engineer skills
  • Draft the shutdown notices
  • Re-plan when dates change
  • Approve the plan and notices

02Give each engineer a short brief on the site and asset before the visit

  • Pull the site and asset history
  • Sum up history and site rules
  • Send the brief to the phone
  • Do the site safety checks

03Check emergency lighting test records and turn failures into remedial work

  • Match results to each light
  • Flag lights not tested or failed
  • Spot repeat fails
  • Draft the summary and quote
  • Sign the certificate
  • Approve the quote

04Check each electrical installation condition report before issue and track coded defects to the landlord's 28-day deadline

  • Check the report is complete
  • Code and sign the report
  • Flag reports for the supervisor
  • Review flagged reports
  • Start the 28 day clock
  • Draft the completion note

05Check completed job sheets for gaps before they reach the customer

  • Check every field is filled
  • Check readings are in range
  • Match assets to the register
  • Flag defects with no next step
  • Release or return each sheet
  • Set the rules

06Explain inspection results in plain English for landlords and managing agents

  • Sum up the outcome plainly
  • Order actions by urgency
  • Link the remedial quote
  • Approve the summary

07Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

08Chase unanswered remedial quotes and track which ones are won

  • Set a follow-up for each quote
  • Draft the chase emails
  • Approve each message
  • Match replies to quotes
  • Track which quotes are won
  • Sign any formal safety letter

09Produce each client's monthly service report

  • Pull jobs, certificates and quotes
  • Work out the contract KPIs
  • Build charts in the client's format
  • Draft notes on exceptions
  • Check the figures and notes
  • Approve before it is sent

50tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan and brief

Test and check

Explain, quote and report

01Plan large multi-site testing programmes around shutdowns, access windows and engineer capacity

  • Automated: Group sites by area
  • Automated: Schedule around access and shutdowns
  • Automated: Match work to engineer skills
  • AI reads and drafts: Draft the shutdown notices
  • Automated: Re-plan when dates change
  • Your team decides: Approve the plan and notices

Passes on: a plan by area, around opening hours, so no part is left without lights

02Give each engineer a short brief on the site and asset before the visit

  • Automated: Pull the site and asset history
  • AI reads and drafts: Sum up history and site rules
  • Automated: Send the brief to the phone
  • Your team decides: Do the site safety checks

Passes on: a brief for each site: light list, last year's fails, kit list and access

03Check emergency lighting test records and turn failures into remedial work

  • AI reads and drafts: Match results to each light
  • Automated: Flag lights not tested or failed
  • Automated: Spot repeat fails
  • AI reads and drafts: Draft the summary and quote
  • Your team decides: Sign the certificate
  • Your team decides: Approve the quote

Passes on: each light checked to the list, and any that was missed or ran short

04Check each electrical installation condition report before issue and track coded defects to the landlord's 28-day deadline

  • Automated: Check the report is complete
  • Your team decides: Code and sign the report
  • Automated: Flag reports for the supervisor
  • Your team decides: Review flagged reports
  • Automated: Start the 28 day clock
  • AI reads and drafts: Draft the completion note

Passes on: the EICR checked before issue, and each coded item tracked to a fix

05Check completed job sheets for gaps before they reach the customer

  • Automated: Check every field is filled
  • Automated: Check readings are in range
  • Automated: Match assets to the register
  • AI reads and drafts: Flag defects with no next step
  • Your team decides: Release or return each sheet
  • Your team decides: Set the rules

Passes on: the job sheet checked so no reading, photo or sign-off is missing

06Explain inspection results in plain English for landlords and managing agents

  • AI reads and drafts: Sum up the outcome plainly
  • AI reads and drafts: Order actions by urgency
  • Automated: Link the remedial quote
  • Your team decides: Approve the summary

Passes on: a plain summary for the site: what failed, what is urgent, what is advised

07Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Passes on: a quote for each fault found, grouped by site

08Chase unanswered remedial quotes and track which ones are won

  • Automated: Set a follow-up for each quote
  • AI reads and drafts: Draft the chase emails
  • Your team decides: Approve each message
  • AI reads and drafts: Match replies to quotes
  • Automated: Track which quotes are won
  • Your team decides: Sign any formal safety letter

Passes on: quotes with no reply chased, and how many are won by site and engineer

09Produce each client's monthly service report

  • Automated: Pull jobs, certificates and quotes
  • Automated: Work out the contract KPIs
  • Automated: Build charts in the client's format
  • AI reads and drafts: Draft notes on exceptions
  • Your team decides: Check the figures and notes
  • Your team decides: Approve before it is sent

Ends with: one report a month: sites done, fails open, fixes made and what is next

23automated12by AI15decided by your team

Before, by hand

Plan and brief

1Plan the test programme
2Brief the engineer

Test and check

3Check emergency lights
4Check the EICR
5Check the job sheets

Explain, quote and report

6Explain the results
7Quote the remedials
8Chase the quotes
9Build the service report

50tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan and brief

1Plan the test programme

Automated: Group sites by area

Automated: Schedule around access and shutdowns

Automated: Match work to engineer skills

AI reads and drafts: Draft the shutdown notices

Automated: Re-plan when dates change

Your team decides: Approve the plan and notices

Passes on: a plan by area, around opening hours, so no part is left without lights

2Brief the engineer

Automated: Pull the site and asset history

AI reads and drafts: Sum up history and site rules

Automated: Send the brief to the phone

Your team decides: Do the site safety checks

Passes on: a brief for each site: light list, last year's fails, kit list and access

Test and check

3Check emergency lights

AI reads and drafts: Match results to each light

Automated: Flag lights not tested or failed

Automated: Spot repeat fails

AI reads and drafts: Draft the summary and quote

Your team decides: Sign the certificate

Your team decides: Approve the quote

Passes on: each light checked to the list, and any that was missed or ran short

4Check the EICR

Automated: Check the report is complete

Your team decides: Code and sign the report

Automated: Flag reports for the supervisor

Your team decides: Review flagged reports

Automated: Start the 28 day clock

AI reads and drafts: Draft the completion note

Passes on: the EICR checked before issue, and each coded item tracked to a fix

5Check the job sheets

Automated: Check every field is filled

Automated: Check readings are in range

Automated: Match assets to the register

AI reads and drafts: Flag defects with no next step

Your team decides: Release or return each sheet

Your team decides: Set the rules

Passes on: the job sheet checked so no reading, photo or sign-off is missing

Explain, quote and report

6Explain the results

AI reads and drafts: Sum up the outcome plainly

AI reads and drafts: Order actions by urgency

Automated: Link the remedial quote

Your team decides: Approve the summary

Passes on: a plain summary for the site: what failed, what is urgent, what is advised

7Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Passes on: a quote for each fault found, grouped by site

8Chase the quotes

Automated: Set a follow-up for each quote

AI reads and drafts: Draft the chase emails

Your team decides: Approve each message

AI reads and drafts: Match replies to quotes

Automated: Track which quotes are won

Your team decides: Sign any formal safety letter

Passes on: quotes with no reply chased, and how many are won by site and engineer

9Build the service report

Automated: Pull jobs, certificates and quotes

Automated: Work out the contract KPIs

Automated: Build charts in the client's format

AI reads and drafts: Draft notes on exceptions

Your team decides: Check the figures and notes

Your team decides: Approve before it is sent

Ends with: one report a month: sites done, fails open, fixes made and what is next

23automated

12by AI

15decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Legionella risk assessment to monthly monitoring and remedials

Before, by hand

Assess and quote

Monitor and chase

Report to the client

01Draft legionella risk assessments and written schemes from the assessor's notes

  • Sort notes by asset
  • Draft findings and controls
  • Draft the written scheme
  • List the remedials to quote
  • Set up the monitoring tasks
  • Confirm ratings and sign

02Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

03Give each engineer a short brief on the site and asset before the visit

  • Pull the site and asset history
  • Sum up history and site rules
  • Send the brief to the phone
  • Do the site safety checks

04Track closed-system water sampling results and flag bacteria or corrosion trends before they damage plant

  • Read each lab report
  • Plot results against history
  • Flag results over the limit
  • Draft the action note
  • Decide on dosing changes

05Chase unanswered remedial quotes and track which ones are won

  • Set a follow-up for each quote
  • Draft the chase emails
  • Approve each message
  • Match replies to quotes
  • Track which quotes are won
  • Sign any formal safety letter

06Produce each client's monthly service report

  • Pull jobs, certificates and quotes
  • Work out the contract KPIs
  • Build charts in the client's format
  • Draft notes on exceptions
  • Check the figures and notes
  • Approve before it is sent

33tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Assess and quote

Monitor and chase

Report to the client

01Draft legionella risk assessments and written schemes from the assessor's notes

  • AI reads and drafts: Sort notes by asset
  • AI reads and drafts: Draft findings and controls
  • AI reads and drafts: Draft the written scheme
  • AI reads and drafts: List the remedials to quote
  • Automated: Set up the monitoring tasks
  • Your team decides: Confirm ratings and sign

Passes on: a draft of the risk assessment and scheme, with the fixes and the checks

02Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Passes on: a priced quote for each fix the assessment found

03Give each engineer a short brief on the site and asset before the visit

  • Automated: Pull the site and asset history
  • AI reads and drafts: Sum up history and site rules
  • Automated: Send the brief to the phone
  • Your team decides: Do the site safety checks

Passes on: a brief for the visit, with the outlets to test and the last readings

04Track closed-system water sampling results and flag bacteria or corrosion trends before they damage plant

  • AI reads and drafts: Read each lab report
  • Automated: Plot results against history
  • Automated: Flag results over the limit
  • AI reads and drafts: Draft the action note
  • Your team decides: Decide on dosing changes

Passes on: the sample results, with any rise in bacteria or rust shown

05Chase unanswered remedial quotes and track which ones are won

  • Automated: Set a follow-up for each quote
  • AI reads and drafts: Draft the chase emails
  • Your team decides: Approve each message
  • AI reads and drafts: Match replies to quotes
  • Automated: Track which quotes are won
  • Your team decides: Sign any formal safety letter

Passes on: quotes with no reply chased, and a formal letter if an item is unsafe

06Produce each client's monthly service report

  • Automated: Pull jobs, certificates and quotes
  • Automated: Work out the contract KPIs
  • Automated: Build charts in the client's format
  • AI reads and drafts: Draft notes on exceptions
  • Your team decides: Check the figures and notes
  • Your team decides: Approve before it is sent

Ends with: a monthly water hygiene report for the client

13automated11by AI9decided by your team

Before, by hand

Assess and quote

1Draft the risk assessment
2Quote the remedials

Monitor and chase

3Brief the engineer
4Track water results
5Chase the quotes

Report to the client

6Build the service report

33tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Assess and quote

1Draft the risk assessment

AI reads and drafts: Sort notes by asset

AI reads and drafts: Draft findings and controls

AI reads and drafts: Draft the written scheme

AI reads and drafts: List the remedials to quote

Automated: Set up the monitoring tasks

Your team decides: Confirm ratings and sign

Passes on: a draft of the risk assessment and scheme, with the fixes and the checks

2Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Passes on: a priced quote for each fix the assessment found

Monitor and chase

3Brief the engineer

Automated: Pull the site and asset history

AI reads and drafts: Sum up history and site rules

Automated: Send the brief to the phone

Your team decides: Do the site safety checks

Passes on: a brief for the visit, with the outlets to test and the last readings

4Track water results

AI reads and drafts: Read each lab report

Automated: Plot results against history

Automated: Flag results over the limit

AI reads and drafts: Draft the action note

Your team decides: Decide on dosing changes

Passes on: the sample results, with any rise in bacteria or rust shown

5Chase the quotes

Automated: Set a follow-up for each quote

AI reads and drafts: Draft the chase emails

Your team decides: Approve each message

AI reads and drafts: Match replies to quotes

Automated: Track which quotes are won

Your team decides: Sign any formal safety letter

Passes on: quotes with no reply chased, and a formal letter if an item is unsafe

Report to the client

6Build the service report

Automated: Pull jobs, certificates and quotes

Automated: Work out the contract KPIs

Automated: Build charts in the client's format

AI reads and drafts: Draft notes on exceptions

Your team decides: Check the figures and notes

Your team decides: Approve before it is sent

Ends with: a monthly water hygiene report for the client

13automated

11by AI

9decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.