Built Logic

See what AI can do

Tender intake and bid decisions

We take off your hands: logging invites from every portal and scoring each one for a bid decision. Working out why you win and lose.

You get: one list of every tender invite. A scored bid or no-bid note for your director to decide on. Your hit rate by client and sector.

Get a price for this

Or check first: Are we ready for AI?

The problem

Tenders come in from every portal. We bid for the wrong ones and never learn why we lose.

What is in this package

15 more parts, which a call confirms.

See how each process runs, before and after

We price a whole package as one build (our rule). A call confirms it.

What it needs to work

  • Access to procurement portals
  • A written description of target work
  • A tender register

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors
  • Surveyors and cost consultants

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Tender result to sharper bidding

Before, by hand

Get the feedback

Study the results

01Ask clients for structured feedback after a tender decision and summarise the reasons

  • Approve the feedback request
  • Send it when the result is in
  • Make the feedback call
  • Tag the reasons given
  • Update the tender record

02Find the weak points that keep losing you marks in tender feedback

  • Pull scores and comments
  • Compare with the winner's scores
  • Tag the themes
  • Total themes across bids
  • Decide library and training changes

03Compare the company's tender prices with published contract award values

  • Pull award notices
  • Match each notice to your bid
  • Read the award value
  • Work out the price gap
  • Show trends by sector and client
  • Set your pricing policy

04Find out why you win and lose tenders across all your bids

  • Tidy the results data
  • Read the feedback letters
  • Group results by rival and type
  • Sum up the patterns
  • Draft the quarterly report
  • Decide what to change

05Analyse tender hit rate by client, sector, value and competitor

  • Join tender records and results
  • Work out hit rate by type
  • Flag costly bids that rarely win
  • Draft the quarterly notes
  • Change the bid rules

27tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Get the feedback

Study the results

01Ask clients for structured feedback after a tender decision and summarise the reasons

  • Your team decides: Approve the feedback request
  • Automated: Send it when the result is in
  • Your team decides: Make the feedback call
  • AI reads and drafts: Tag the reasons given
  • Automated: Update the tender record

Passes on: the client's feedback and a short note of their reasons

02Find the weak points that keep losing you marks in tender feedback

  • AI reads and drafts: Pull scores and comments
  • AI reads and drafts: Compare with the winner's scores
  • AI reads and drafts: Tag the themes
  • Automated: Total themes across bids
  • Your team decides: Decide library and training changes

Passes on: the weak points that keep coming up in lost bids

03Compare the company's tender prices with published contract award values

  • Automated: Pull award notices
  • AI reads and drafts: Match each notice to your bid
  • AI reads and drafts: Read the award value
  • Automated: Work out the price gap
  • Automated: Show trends by sector and client
  • Your team decides: Set your pricing policy

Passes on: your price next to the published award value

04Find out why you win and lose tenders across all your bids

  • Automated: Tidy the results data
  • AI reads and drafts: Read the feedback letters
  • AI reads and drafts: Group results by rival and type
  • AI reads and drafts: Sum up the patterns
  • AI reads and drafts: Draft the quarterly report
  • Your team decides: Decide what to change

Passes on: why you win and lose, across all your bids

05Analyse tender hit rate by client, sector, value and competitor

  • Automated: Join tender records and results
  • Automated: Work out hit rate by type
  • AI reads and drafts: Flag costly bids that rarely win
  • AI reads and drafts: Draft the quarterly notes
  • Your team decides: Change the bid rules

Ends with: hit rate by client, sector, value and rival, to sharpen your bid rules

9automated12by AI6decided by your team

Before, by hand

Get the feedback

1Ask for feedback
2Find the weak points

Study the results

3Compare prices with awards
4Review wins and losses
5Study your hit rate

27tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Get the feedback

1Ask for feedback

Your team decides: Approve the feedback request

Automated: Send it when the result is in

Your team decides: Make the feedback call

AI reads and drafts: Tag the reasons given

Automated: Update the tender record

Passes on: the client's feedback and a short note of their reasons

2Find the weak points

AI reads and drafts: Pull scores and comments

AI reads and drafts: Compare with the winner's scores

AI reads and drafts: Tag the themes

Automated: Total themes across bids

Your team decides: Decide library and training changes

Passes on: the weak points that keep coming up in lost bids

Study the results

3Compare prices with awards

Automated: Pull award notices

AI reads and drafts: Match each notice to your bid

AI reads and drafts: Read the award value

Automated: Work out the price gap

Automated: Show trends by sector and client

Your team decides: Set your pricing policy

Passes on: your price next to the published award value

4Review wins and losses

Automated: Tidy the results data

AI reads and drafts: Read the feedback letters

AI reads and drafts: Group results by rival and type

AI reads and drafts: Sum up the patterns

AI reads and drafts: Draft the quarterly report

Your team decides: Decide what to change

Passes on: why you win and lose, across all your bids

5Study your hit rate

Automated: Join tender records and results

Automated: Work out hit rate by type

AI reads and drafts: Flag costly bids that rarely win

AI reads and drafts: Draft the quarterly notes

Your team decides: Change the bid rules

Ends with: hit rate by client, sector, value and rival, to sharpen your bid rules

9automated

12by AI

6decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Tender invitation to bid decision

Before, by hand

Find the tenders

Check the job and client

Decide and start the bid

01Bring tender invitations from every portal into one register

  • Check every portal and inbox
  • Copy deadlines into the register
  • Log addenda as they land
  • Alert the bid owner
  • Confirm each entry
  • Download files the portal blocks

02Screen each day's public tender notices against the work you want

  • Pull new notices each morning
  • Filter on codes, value and place
  • Score fit against past wins
  • Write the ranked shortlist
  • Pick which go to bid or no-bid

03Check you meet a tender's eligibility rules before you commit

  • List each rule you must meet
  • Check each against your records
  • Check expiry dates
  • List the gaps
  • Confirm how each rule reads
  • Decide if gaps can close

04Check a client's finances and payment record before you bid

  • Pull filings and payment reports
  • Pull out key ratios and pay days
  • Compare with your own ledger
  • Write a short credit summary
  • Judge the risk
  • Decide terms or walk away

05Score each tender invitation for a bid or no-bid decision

  • Pull key facts from the documents
  • Score it against your criteria
  • Check workload and capacity
  • Draft the decision note
  • Decide bid or no-bid

06Run the bid programme with tasks, owners and reminders from the tender brief

  • Build tasks from the bid template
  • Assign an owner to each
  • Send task reminders
  • Compile the daily status
  • Set the priorities
  • Sort out any slippage

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Find the tenders

Check the job and client

Decide and start the bid

01Bring tender invitations from every portal into one register

  • Automated: Check every portal and inbox
  • Automated: Copy deadlines into the register
  • Automated: Log addenda as they land
  • Automated: Alert the bid owner
  • Your team decides: Confirm each entry
  • Your team decides: Download files the portal blocks

Passes on: each new ITT, its papers, dates and portal links, in one list

02Screen each day's public tender notices against the work you want

  • Automated: Pull new notices each morning
  • Automated: Filter on codes, value and place
  • AI reads and drafts: Score fit against past wins
  • AI reads and drafts: Write the ranked shortlist
  • Your team decides: Pick which go to bid or no-bid

Passes on: the work type, value, place, client and a fit score

03Check you meet a tender's eligibility rules before you commit

  • AI reads and drafts: List each rule you must meet
  • AI reads and drafts: Check each against your records
  • Automated: Check expiry dates
  • AI reads and drafts: List the gaps
  • Your team decides: Confirm how each rule reads
  • Your team decides: Decide if gaps can close

Passes on: a pass or fail on each entry rule, from turnover and insurance to past jobs

04Check a client's finances and payment record before you bid

  • Automated: Pull filings and payment reports
  • AI reads and drafts: Pull out key ratios and pay days
  • Automated: Compare with your own ledger
  • AI reads and drafts: Write a short credit summary
  • Your team decides: Judge the risk
  • Your team decides: Decide terms or walk away

Passes on: a risk note on the client's finances and how well they pay

05Score each tender invitation for a bid or no-bid decision

  • AI reads and drafts: Pull key facts from the documents
  • AI reads and drafts: Score it against your criteria
  • Automated: Check workload and capacity
  • AI reads and drafts: Draft the decision note
  • Your team decides: Decide bid or no-bid

Passes on: a bid or no-bid sheet with fit, risk, workload and win chance

06Run the bid programme with tasks, owners and reminders from the tender brief

  • Automated: Build tasks from the bid template
  • Automated: Assign an owner to each
  • Automated: Send task reminders
  • Automated: Compile the daily status
  • Your team decides: Set the priorities
  • Your team decides: Sort out any slippage

Ends with: a bid plan with tasks, owners and reminders, ready to start

14automated10by AI10decided by your team

Before, by hand

Find the tenders

1Log the invitations
2Screen the notices

Check the job and client

3Check you can bid
4Check the client

Decide and start the bid

5Bid or no-bid
6Set up the bid

34tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Find the tenders

1Log the invitations

Automated: Check every portal and inbox

Automated: Copy deadlines into the register

Automated: Log addenda as they land

Automated: Alert the bid owner

Your team decides: Confirm each entry

Your team decides: Download files the portal blocks

Passes on: each new ITT, its papers, dates and portal links, in one list

2Screen the notices

Automated: Pull new notices each morning

Automated: Filter on codes, value and place

AI reads and drafts: Score fit against past wins

AI reads and drafts: Write the ranked shortlist

Your team decides: Pick which go to bid or no-bid

Passes on: the work type, value, place, client and a fit score

Check the job and client

3Check you can bid

AI reads and drafts: List each rule you must meet

AI reads and drafts: Check each against your records

Automated: Check expiry dates

AI reads and drafts: List the gaps

Your team decides: Confirm how each rule reads

Your team decides: Decide if gaps can close

Passes on: a pass or fail on each entry rule, from turnover and insurance to past jobs

4Check the client

Automated: Pull filings and payment reports

AI reads and drafts: Pull out key ratios and pay days

Automated: Compare with your own ledger

AI reads and drafts: Write a short credit summary

Your team decides: Judge the risk

Your team decides: Decide terms or walk away

Passes on: a risk note on the client's finances and how well they pay

Decide and start the bid

5Bid or no-bid

AI reads and drafts: Pull key facts from the documents

AI reads and drafts: Score it against your criteria

Automated: Check workload and capacity

AI reads and drafts: Draft the decision note

Your team decides: Decide bid or no-bid

Passes on: a bid or no-bid sheet with fit, risk, workload and win chance

6Set up the bid

Automated: Build tasks from the bid template

Automated: Assign an owner to each

Automated: Send task reminders

Automated: Compile the daily status

Your team decides: Set the priorities

Your team decides: Sort out any slippage

Ends with: a bid plan with tasks, owners and reminders, ready to start

14automated

10by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Tender documents to priced risk register and term sheet

Before, by hand

Read and query

Check the terms

Find the site risks

Price the risk

01Summarise a tender pack before pricing starts

  • Read the whole tender pack
  • Pull out dates and weightings
  • Note the page for each fact
  • Fill the brief template
  • List gaps and clashes
  • Check the brief against the pack

02Find gaps and conflicts in tender information and draft tender queries

  • Compare the drawings, spec and BoQ
  • List conflicts and missing data
  • Draft numbered queries
  • Decide which queries to send
  • Word the sensitive ones

03Manage tender queries and track the answers against the deadline

  • Log each query
  • Approve each query before it goes
  • Track answers against the deadline
  • Read answers and link them to packages
  • Tell each owner
  • Check what each answer changes

04Review contract amendments at tender against the company's standard positions

  • Map each change to the standard clause
  • Rate the risk shift
  • Draft the response
  • Draft the qualifications
  • Decide qualify, price or accept
  • Get legal advice on risky terms

05Check a contract's insurance and bond demands against the company's policies and bonding facility at tender and before signing

  • Read the insurance and bond terms
  • Compare them with your policies
  • List the gaps
  • Draft questions for the broker
  • Decide on cover
  • Decide whether to qualify

06Read the pre-construction information for hazards that affect price

  • Pull hazards and limits
  • Link each to packages and prelims
  • Show the price effect
  • Draft the queries
  • Draft outline plan text
  • Review the hazard list

07Pull ground risks from site investigation reports for tender pricing

  • Pull findings from each borehole
  • Sum up ground conditions by zone
  • Link them to pricing risks
  • Suggest the qualifications
  • Judge what the findings mean

08Capture tender site visit observations by voice and photo into the risk and prelims notes

  • Write up the voice notes
  • Sort notes by topic
  • Link the photos
  • Add risks and prelims items
  • Check the report
  • Price the risks

09Build a priced risk and opportunity register for each tender

  • Collect flagged issues
  • Draft each risk entry
  • Suggest the allowance from history
  • Link each to its source
  • Confirm each allowance
  • Price, qualify or accept each

10Produce a one-page commercial term sheet for each tender

  • Pull each term with its page
  • Compare terms with your standard
  • Flag where terms differ
  • Fill in the one-page sheet
  • Check the values
  • Decide price and qualifications

58tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Read and query

Check the terms

Find the site risks

Price the risk

01Summarise a tender pack before pricing starts

  • AI reads and drafts: Read the whole tender pack
  • AI reads and drafts: Pull out dates and weightings
  • AI reads and drafts: Note the page for each fact
  • Automated: Fill the brief template
  • AI reads and drafts: List gaps and clashes
  • Your team decides: Check the brief against the pack

Passes on: a short brief with the scope, value, contract, dates and how it is scored

02Find gaps and conflicts in tender information and draft tender queries

  • AI reads and drafts: Compare the drawings, spec and BoQ
  • AI reads and drafts: List conflicts and missing data
  • AI reads and drafts: Draft numbered queries
  • Your team decides: Decide which queries to send
  • Your team decides: Word the sensitive ones

Passes on: the gaps and clashes in the drawings and spec, with a query for each

03Manage tender queries and track the answers against the deadline

  • Automated: Log each query
  • Your team decides: Approve each query before it goes
  • Automated: Track answers against the deadline
  • AI reads and drafts: Read answers and link them to packages
  • Automated: Tell each owner
  • Your team decides: Check what each answer changes

Passes on: each query chased to the due date, with each answer tied to what it changes

04Review contract amendments at tender against the company's standard positions

  • AI reads and drafts: Map each change to the standard clause
  • AI reads and drafts: Rate the risk shift
  • AI reads and drafts: Draft the response
  • AI reads and drafts: Draft the qualifications
  • Your team decides: Decide qualify, price or accept
  • Your team decides: Get legal advice on risky terms

Passes on: each change to the standard form, rated red, amber or green

05Check a contract's insurance and bond demands against the company's policies and bonding facility at tender and before signing

  • AI reads and drafts: Read the insurance and bond terms
  • AI reads and drafts: Compare them with your policies
  • AI reads and drafts: List the gaps
  • AI reads and drafts: Draft questions for the broker
  • Your team decides: Decide on cover
  • Your team decides: Decide whether to qualify

Passes on: the insurance and bonds the job asks for, set against what you have

06Read the pre-construction information for hazards that affect price

  • AI reads and drafts: Pull hazards and limits
  • AI reads and drafts: Link each to packages and prelims
  • AI reads and drafts: Show the price effect
  • AI reads and drafts: Draft the queries
  • AI reads and drafts: Draft outline plan text
  • Your team decides: Review the hazard list

Passes on: the hazards in the PCI that change the method, time or price

07Pull ground risks from site investigation reports for tender pricing

  • AI reads and drafts: Pull findings from each borehole
  • AI reads and drafts: Sum up ground conditions by zone
  • AI reads and drafts: Link them to pricing risks
  • AI reads and drafts: Suggest the qualifications
  • Your team decides: Judge what the findings mean

Passes on: the ground risks from the SI, such as water and bad ground

08Capture tender site visit observations by voice and photo into the risk and prelims notes

  • AI reads and drafts: Write up the voice notes
  • AI reads and drafts: Sort notes by topic
  • Automated: Link the photos
  • Automated: Add risks and prelims items
  • Your team decides: Check the report
  • Your team decides: Price the risks

Passes on: what was seen on the site visit, by voice and photo, from access to services

09Build a priced risk and opportunity register for each tender

  • Automated: Collect flagged issues
  • AI reads and drafts: Draft each risk entry
  • AI reads and drafts: Suggest the allowance from history
  • Automated: Link each to its source
  • Your team decides: Confirm each allowance
  • Your team decides: Price, qualify or accept each

Passes on: one priced risk register, with an owner, a likelihood and a sum for each

10Produce a one-page commercial term sheet for each tender

  • AI reads and drafts: Pull each term with its page
  • AI reads and drafts: Compare terms with your standard
  • AI reads and drafts: Flag where terms differ
  • Automated: Fill in the one-page sheet
  • Your team decides: Check the values
  • Your team decides: Decide price and qualifications

Ends with: one page of key terms, and the risks that drive the price

9automated32by AI17decided by your team

Before, by hand

Read and query

1Sum up the tender
2Find gaps and conflicts
3Manage tender queries

Check the terms

4Review the amendments
5Check insurance and bonds

Find the site risks

6Read the PCI
7Read the ground reports
8Capture the site visit

Price the risk

9Price the risks
10Build the term sheet

58tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Read and query

1Sum up the tender

AI reads and drafts: Read the whole tender pack

AI reads and drafts: Pull out dates and weightings

AI reads and drafts: Note the page for each fact

Automated: Fill the brief template

AI reads and drafts: List gaps and clashes

Your team decides: Check the brief against the pack

Passes on: a short brief with the scope, value, contract, dates and how it is scored

2Find gaps and conflicts

AI reads and drafts: Compare the drawings, spec and BoQ

AI reads and drafts: List conflicts and missing data

AI reads and drafts: Draft numbered queries

Your team decides: Decide which queries to send

Your team decides: Word the sensitive ones

Passes on: the gaps and clashes in the drawings and spec, with a query for each

3Manage tender queries

Automated: Log each query

Your team decides: Approve each query before it goes

Automated: Track answers against the deadline

AI reads and drafts: Read answers and link them to packages

Automated: Tell each owner

Your team decides: Check what each answer changes

Passes on: each query chased to the due date, with each answer tied to what it changes

Check the terms

4Review the amendments

AI reads and drafts: Map each change to the standard clause

AI reads and drafts: Rate the risk shift

AI reads and drafts: Draft the response

AI reads and drafts: Draft the qualifications

Your team decides: Decide qualify, price or accept

Your team decides: Get legal advice on risky terms

Passes on: each change to the standard form, rated red, amber or green

5Check insurance and bonds

AI reads and drafts: Read the insurance and bond terms

AI reads and drafts: Compare them with your policies

AI reads and drafts: List the gaps

AI reads and drafts: Draft questions for the broker

Your team decides: Decide on cover

Your team decides: Decide whether to qualify

Passes on: the insurance and bonds the job asks for, set against what you have

Find the site risks

6Read the PCI

AI reads and drafts: Pull hazards and limits

AI reads and drafts: Link each to packages and prelims

AI reads and drafts: Show the price effect

AI reads and drafts: Draft the queries

AI reads and drafts: Draft outline plan text

Your team decides: Review the hazard list

Passes on: the hazards in the PCI that change the method, time or price

7Read the ground reports

AI reads and drafts: Pull findings from each borehole

AI reads and drafts: Sum up ground conditions by zone

AI reads and drafts: Link them to pricing risks

AI reads and drafts: Suggest the qualifications

Your team decides: Judge what the findings mean

Passes on: the ground risks from the SI, such as water and bad ground

8Capture the site visit

AI reads and drafts: Write up the voice notes

AI reads and drafts: Sort notes by topic

Automated: Link the photos

Automated: Add risks and prelims items

Your team decides: Check the report

Your team decides: Price the risks

Passes on: what was seen on the site visit, by voice and photo, from access to services

Price the risk

9Price the risks

Automated: Collect flagged issues

AI reads and drafts: Draft each risk entry

AI reads and drafts: Suggest the allowance from history

Automated: Link each to its source

Your team decides: Confirm each allowance

Your team decides: Price, qualify or accept each

Passes on: one priced risk register, with an owner, a likelihood and a sum for each

10Build the term sheet

AI reads and drafts: Pull each term with its page

AI reads and drafts: Compare terms with your standard

AI reads and drafts: Flag where terms differ

Automated: Fill in the one-page sheet

Your team decides: Check the values

Your team decides: Decide price and qualifications

Ends with: one page of key terms, and the risks that drive the price

9automated

32by AI

17decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.