Frame erection, pour and access records

We take off your hands: keeping pour, erection and inspection records for each floor or plot. Planning access for each machine job.

You get: a signed record for each pour, lift and plot as it happens. A MEWP plan and rescue plan for each machine job. Your supervisor approves them before it starts.

Get a price for this

Or check first: Are we ready for AI?

The problem

Each floor or plot needs the same records signed before we move on. They're never in one place.

What it needs to work

  • Drawings and schedules
  • Temporary works records
  • Plant and machine records

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Timber frame or CLT plot from delivery to recorded and paid frame

Before, by hand

Plan the gang and loads

Build and check

Pay the gang

01Plan next week's gangs, scaffold and access across live jobs

  • Match crews by skill, card and area
  • Draft the weekly plan
  • Flag clashes and gaps
  • Forecast labour demand
  • Decide the plan and cover
  • Message operatives once approved

02Plan deliveries and loads to match the site installation order

  • Group units by install order
  • Fit loads to vehicle limits
  • Check each unit is ready
  • Make the delivery notes
  • Confirm the load plan
  • Check load security

03Check the site against the insurer's fire prevention code and keep the evidence

  • Build the fire checklist
  • Schedule the inspections
  • Link permits and photos
  • Report the gaps
  • Inspect and sign
  • Confirm the fire plan

04Record timber frame and CLT erection checks plot by plot

  • Issue the check list per plot
  • Collect ticks, readings and photos
  • Compare readings with the limits
  • Flag areas not ready to release
  • Sign each location
  • Decide on any non-conformance

05Monitor timber panel moisture during construction and warn before wet panels are closed in

  • Map readings to panels
  • Compare with the limits
  • Send alerts with next steps
  • Log readings and actions
  • Set the moisture limits
  • Decide when to close in

06Record cavity barrier and fixing checks with photos before they are covered

  • Check each photo shows the detail
  • Track which bays are done
  • Alert on missing bays
  • Inspect and sign each bay
  • Build the inspection log

07Calculate price-work payments for drylining, plastering, tiling, bricklaying, groundworks, frame and glazing gangs from approved measured work

  • Price each gang claim
  • Check totals against each area
  • Flag claims over the total
  • Apply the deductions
  • Build the pay statements
  • Approve the pay

08Prepare payment applications using project records

  • Pull values from the registers
  • Carry forward the totals
  • Attach evidence to each line
  • List items with no support
  • Check measure and value
  • Submit the application

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the gang and loads

Build and check

Pay the gang

01Plan next week's gangs, scaffold and access across live jobs

  • Automated: Match crews by skill, card and area
  • Automated: Draft the weekly plan
  • Automated: Flag clashes and gaps
  • Automated: Forecast labour demand
  • Your team decides: Decide the plan and cover
  • Automated: Message operatives once approved

Passes on: the gang and crane crew for the plot, with cards and skills checked

02Plan deliveries and loads to match the site installation order

  • Automated: Group units by install order
  • Automated: Fit loads to vehicle limits
  • Automated: Check each unit is ready
  • Automated: Make the delivery notes
  • Your team decides: Confirm the load plan
  • Your team decides: Check load security

Passes on: panel loads in the order they go up, to match the crane slots

03Check the site against the insurer's fire prevention code and keep the evidence

  • Automated: Build the fire checklist
  • Automated: Schedule the inspections
  • Automated: Link permits and photos
  • Automated: Report the gaps
  • Your team decides: Inspect and sign
  • Your team decides: Confirm the fire plan

Passes on: fire checks for the frame stage, to the STA 16 Steps and the insurer's code

04Record timber frame and CLT erection checks plot by plot

  • Automated: Issue the check list per plot
  • Automated: Collect ticks, readings and photos
  • Automated: Compare readings with the limits
  • Automated: Flag areas not ready to release
  • Your team decides: Sign each location
  • Your team decides: Decide on any non-conformance

Passes on: checks by plot or floor: fixings, plumb, hold down and photos

05Monitor timber panel moisture during construction and warn before wet panels are closed in

  • Automated: Map readings to panels
  • Automated: Compare with the limits
  • Automated: Send alerts with next steps
  • Automated: Log readings and actions
  • Your team decides: Set the moisture limits
  • Your team decides: Decide when to close in

Passes on: how damp each panel is, set against the limits in the plan

06Record cavity barrier and fixing checks with photos before they are covered

  • AI reads and drafts: Check each photo shows the detail
  • Automated: Track which bays are done
  • Automated: Alert on missing bays
  • Your team decides: Inspect and sign each bay
  • Automated: Build the inspection log

Passes on: a photo of each cavity barrier and fire break before it is closed in

07Calculate price-work payments for drylining, plastering, tiling, bricklaying, groundworks, frame and glazing gangs from approved measured work

  • Automated: Price each gang claim
  • Automated: Check totals against each area
  • Automated: Flag claims over the total
  • Automated: Apply the deductions
  • Automated: Build the pay statements
  • Your team decides: Approve the pay

Passes on: price-work pay for the gangs, from plots signed off

08Prepare payment applications using project records

  • Automated: Pull values from the registers
  • Automated: Carry forward the totals
  • AI reads and drafts: Attach evidence to each line
  • AI reads and drafts: List items with no support
  • Your team decides: Check measure and value
  • Your team decides: Submit the application

Ends with: the plot stage claim, from the same records as the gang pay

31automated3by AI13decided by your team

Before, by hand

Plan the gang and loads

1Plan next week's gangs
2Plan the loads

Build and check

3Check the fire code
4Record frame checks
5Watch panel moisture
6Record barrier checks

Pay the gang

7Work out gang pay
8Build the application

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the gang and loads

1Plan next week's gangs

Automated: Match crews by skill, card and area

Automated: Draft the weekly plan

Automated: Flag clashes and gaps

Automated: Forecast labour demand

Your team decides: Decide the plan and cover

Automated: Message operatives once approved

Passes on: the gang and crane crew for the plot, with cards and skills checked

2Plan the loads

Automated: Group units by install order

Automated: Fit loads to vehicle limits

Automated: Check each unit is ready

Automated: Make the delivery notes

Your team decides: Confirm the load plan

Your team decides: Check load security

Passes on: panel loads in the order they go up, to match the crane slots

Build and check

3Check the fire code

Automated: Build the fire checklist

Automated: Schedule the inspections

Automated: Link permits and photos

Automated: Report the gaps

Your team decides: Inspect and sign

Your team decides: Confirm the fire plan

Passes on: fire checks for the frame stage, to the STA 16 Steps and the insurer's code

4Record frame checks

Automated: Issue the check list per plot

Automated: Collect ticks, readings and photos

Automated: Compare readings with the limits

Automated: Flag areas not ready to release

Your team decides: Sign each location

Your team decides: Decide on any non-conformance

Passes on: checks by plot or floor: fixings, plumb, hold down and photos

5Watch panel moisture

Automated: Map readings to panels

Automated: Compare with the limits

Automated: Send alerts with next steps

Automated: Log readings and actions

Your team decides: Set the moisture limits

Your team decides: Decide when to close in

Passes on: how damp each panel is, set against the limits in the plan

6Record barrier checks

AI reads and drafts: Check each photo shows the detail

Automated: Track which bays are done

Automated: Alert on missing bays

Your team decides: Inspect and sign each bay

Automated: Build the inspection log

Passes on: a photo of each cavity barrier and fire break before it is closed in

Pay the gang

7Work out gang pay

Automated: Price each gang claim

Automated: Check totals against each area

Automated: Flag claims over the total

Automated: Apply the deductions

Automated: Build the pay statements

Your team decides: Approve the pay

Passes on: price-work pay for the gangs, from plots signed off

8Build the application

Automated: Pull values from the registers

Automated: Carry forward the totals

AI reads and drafts: Attach evidence to each line

AI reads and drafts: List items with no support

Your team decides: Check measure and value

Your team decides: Submit the application

Ends with: the plot stage claim, from the same records as the gang pay

31automated

3by AI

13decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

MEWP job booking to planned, checked and safely completed access work

Before, by hand

Plan the job

Check and go

01Plan next week's gangs, scaffold and access across live jobs

  • Match crews by skill, card and area
  • Draft the weekly plan
  • Flag clashes and gaps
  • Forecast labour demand
  • Decide the plan and cover
  • Message operatives once approved

02Check operator cards and site paperwork before operated plant goes out

  • Check card type and dates
  • Match the card to the machine
  • List site rules to meet
  • Draft missing documents
  • Confirm the allocation
  • Approve RAMS and lift plans

03Draft the MEWP plan and rescue plan for each job

  • Match the task to a machine
  • Work out pad sizes
  • Note the wind limit
  • Draft the rescue plan
  • Approve the plan
  • Check ground and wind on the day

04Prepare task-specific RAMS for review

  • Pick the right templates
  • Fit them to the site and task
  • List permits and checks
  • Put it in the client's format
  • Review and sign the RAMS
  • Brief the crew

05Track LOLER, PUWER and pre-use checks for plant and lifting kit

  • Read IDs and dates from reports
  • Update the plant register
  • Send reminders before due
  • Flag missing records
  • Do each thorough exam
  • Remove failed plant

06Warn the site team when the forecast threatens weather-sensitive work

  • Tag work that weather can stop
  • Check the forecast against limits
  • Send the daily weather alert
  • Log the actual weather
  • Decide whether to go ahead
  • Check wind on the day

36tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the job

Check and go

01Plan next week's gangs, scaffold and access across live jobs

  • Automated: Match crews by skill, card and area
  • Automated: Draft the weekly plan
  • Automated: Flag clashes and gaps
  • Automated: Forecast labour demand
  • Your team decides: Decide the plan and cover
  • Automated: Message operatives once approved

Passes on: the people for the job, operator and rescue, picked by skill and card

02Check operator cards and site paperwork before operated plant goes out

  • Automated: Check card type and dates
  • Automated: Match the card to the machine
  • AI reads and drafts: List site rules to meet
  • AI reads and drafts: Draft missing documents
  • Your team decides: Confirm the allocation
  • Your team decides: Approve RAMS and lift plans

Passes on: a check of the PAL card, medical and induction for this job

03Draft the MEWP plan and rescue plan for each job

  • AI reads and drafts: Match the task to a machine
  • Automated: Work out pad sizes
  • Automated: Note the wind limit
  • AI reads and drafts: Draft the rescue plan
  • Your team decides: Approve the plan
  • Your team decides: Check ground and wind on the day

Passes on: a MEWP plan and rescue plan: the machine, ground, wind limit and zone

04Prepare task-specific RAMS for review

  • AI reads and drafts: Pick the right templates
  • AI reads and drafts: Fit them to the site and task
  • AI reads and drafts: List permits and checks
  • Automated: Put it in the client's format
  • Your team decides: Review and sign the RAMS
  • Your team decides: Brief the crew

Passes on: task RAMS in your format, with the MEWP plan attached

05Track LOLER, PUWER and pre-use checks for plant and lifting kit

  • AI reads and drafts: Read IDs and dates from reports
  • Automated: Update the plant register
  • Automated: Send reminders before due
  • Automated: Flag missing records
  • Your team decides: Do each thorough exam
  • Your team decides: Remove failed plant

Passes on: the thorough exam cert and hire papers for the machine on site

06Warn the site team when the forecast threatens weather-sensitive work

  • AI reads and drafts: Tag work that weather can stop
  • Automated: Check the forecast against limits
  • Automated: Send the daily weather alert
  • Automated: Log the actual weather
  • Your team decides: Decide whether to go ahead
  • Your team decides: Check wind on the day

Ends with: the wind forecast set next to the machine's limit for each day

16automated9by AI11decided by your team

Before, by hand

Plan the job

1Plan next week's gangs
2Check the operator
3Draft the MEWP plan

Check and go

4Draft the RAMS
5Track plant checks
6Warn of bad weather

36tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the job

1Plan next week's gangs

Automated: Match crews by skill, card and area

Automated: Draft the weekly plan

Automated: Flag clashes and gaps

Automated: Forecast labour demand

Your team decides: Decide the plan and cover

Automated: Message operatives once approved

Passes on: the people for the job, operator and rescue, picked by skill and card

2Check the operator

Automated: Check card type and dates

Automated: Match the card to the machine

AI reads and drafts: List site rules to meet

AI reads and drafts: Draft missing documents

Your team decides: Confirm the allocation

Your team decides: Approve RAMS and lift plans

Passes on: a check of the PAL card, medical and induction for this job

3Draft the MEWP plan

AI reads and drafts: Match the task to a machine

Automated: Work out pad sizes

Automated: Note the wind limit

AI reads and drafts: Draft the rescue plan

Your team decides: Approve the plan

Your team decides: Check ground and wind on the day

Passes on: a MEWP plan and rescue plan: the machine, ground, wind limit and zone

Check and go

4Draft the RAMS

AI reads and drafts: Pick the right templates

AI reads and drafts: Fit them to the site and task

AI reads and drafts: List permits and checks

Automated: Put it in the client's format

Your team decides: Review and sign the RAMS

Your team decides: Brief the crew

Passes on: task RAMS in your format, with the MEWP plan attached

5Track plant checks

AI reads and drafts: Read IDs and dates from reports

Automated: Update the plant register

Automated: Send reminders before due

Automated: Flag missing records

Your team decides: Do each thorough exam

Your team decides: Remove failed plant

Passes on: the thorough exam cert and hire papers for the machine on site

6Warn of bad weather

AI reads and drafts: Tag work that weather can stop

Automated: Check the forecast against limits

Automated: Send the daily weather alert

Automated: Log the actual weather

Your team decides: Decide whether to go ahead

Your team decides: Check wind on the day

Ends with: the wind forecast set next to the machine's limit for each day

16automated

9by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.