Record timber frame and CLT erection checks plot by plot
We take off your hands: proving every plot, floor and panel set was checked, from sole plates and fixings to moisture readings and cavity barriers.
You get: an erection record with photos for your supervisor to sign at each location, a release list for following trades and a QA file ready for audit.
Get a price for thisOr check first: Are we ready for AI?
The problem
When the main contractor asks for proof the frame was checked, we are digging through phones.
How it works
What comes in
- Panel layouts and erection drawings, fixing schedules, the company's QA check list, moisture readings, photos
What AI does
Issues the check list for each location, collects ticks, readings and photos, compares fixings and moisture readings with the design and limits, and flags locations that cannot yet be released.
What you get
- A plot or floor erection record with photos, a release list for following trades, and an audit-ready QA file
Who signs it off
Your erection supervisor signs each location. The structural engineer decides on any non-conformance.
What it needs to work
- A defined QA check list per system
- Erection drawings by plot
- Tablets on site
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?