Built Logic

See what AI can do

Warn sites before high winds hit sheeted scaffolds and temporary roofs

We take off your hands: checking the forecast against every sheeted scaffold and temporary roof, and arranging the inspections after a storm.

You get: a ranked list of structures at risk before a storm, alerts to sites and clients, and the inspection status of each one afterwards, for your contracts manager.

Get a price for this

Or check first: Are we ready for AI?

The problem

Every storm we are ringing round trying to work out which scaffolds are sheeted and who has checked them.

How it works

  1. What comes in

    • The scaffold register with sheeting, temporary roof and design wind data, site locations, the local forecast, the inspection register
  2. What AI does

    Compares forecast gusts with each structure's design limit and exposure, ranks structures at risk, sends alerts and actions, and books and tracks after-event inspections.

  3. What you get

    • A ranked at-risk list before the storm, alerts to sites and clients, and an inspection status for every structure afterwards
  4. Who signs it off

    Your contracts manager decides on furling, extra ties or closing a structure. A competent scaffold inspector inspects and releases it.

What it needs to work

  • Design wind speeds recorded for sheeted scaffolds and temporary roofs
  • A current scaffold register

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?