We take off your hands: building cost plans. Going through the tenders that come back. Getting the contract, warranties and bonds in place on each job.

You get: draft cost plans and tender reports. A summary of each contract. All from one cost record. Missing warranties and bonds chased. Your cost consultants check it all.

Get a price for this

Or check first: Are we ready for AI?

The problem

Cost plans and tender reports take our best people days each.

What is in this package

16 more parts, which a call confirms.

See how each process runs, before and after

We price a whole package as one build (our rule). A call confirms it.

What it needs to work

  • Cost databases
  • Tender returns

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders
  • Surveyors and cost consultants

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Early cost plan to tender report

Before, by hand

Plan the cost

Run the tender

Report and learn

01Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • Map the scheme to NRM1 elements
  • Pick like rates from past jobs
  • Adjust for date and place
  • Draft the plan and assumptions
  • Check quantities and rates
  • Sign the cost plan

02Estimate embodied and whole life carbon from the cost plan or bill

  • Map cost items to materials
  • Apply carbon factors
  • Total it by life cycle stage
  • Draft the report
  • Check the mappings
  • Sign the assessment

03Explain cost plan movements between design stages

  • Compare each cost plan version
  • Link each change to a cause
  • Check the totals balance
  • Draft the commentary
  • Check the reasons
  • Sign off the report

04Assemble the employer's tender documents for a main contract

  • Fill templates from job data
  • Check the documents agree
  • List what is missing
  • Check the pack
  • Approve the contract choices

05Log bidders' tender queries and draft answers to issue equally to all bidders

  • Log each query with no names
  • Group the same questions
  • Draft answers from the documents
  • Approve every answer
  • Send each answer to all bidders
  • Approve any extra time

06Analyse returned main contractor tenders and draft the tender report

  • Read prices from each tender
  • Check the sums
  • Compare line by line
  • Price the qualifications
  • Draft the report
  • Sign the recommendation

07Turn returned tender prices into a benchmark cost database

  • Read each priced tender
  • Map prices to elements
  • Adjust for date and place
  • Store them with job details
  • Check each entry
  • Pick which data to use

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the cost

Run the tender

Report and learn

01Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • AI reads and drafts: Map the scheme to NRM1 elements
  • AI reads and drafts: Pick like rates from past jobs
  • Automated: Adjust for date and place
  • AI reads and drafts: Draft the plan and assumptions
  • Your team decides: Check quantities and rates
  • Your team decides: Sign the cost plan

Passes on: an NRM1 cost plan from the drawings, brief and past costs

02Estimate embodied and whole life carbon from the cost plan or bill

  • AI reads and drafts: Map cost items to materials
  • Automated: Apply carbon factors
  • Automated: Total it by life cycle stage
  • AI reads and drafts: Draft the report
  • Your team decides: Check the mappings
  • Your team decides: Sign the assessment

Passes on: a carbon estimate from the same cost plan

03Explain cost plan movements between design stages

  • Automated: Compare each cost plan version
  • AI reads and drafts: Link each change to a cause
  • Automated: Check the totals balance
  • AI reads and drafts: Draft the commentary
  • Your team decides: Check the reasons
  • Your team decides: Sign off the report

Passes on: why the cost plan moved between stages

04Assemble the employer's tender documents for a main contract

  • Automated: Fill templates from job data
  • AI reads and drafts: Check the documents agree
  • AI reads and drafts: List what is missing
  • Your team decides: Check the pack
  • Your team decides: Approve the contract choices

Passes on: the client's tender pack for the main contract, ready to go out

05Log bidders' tender queries and draft answers to issue equally to all bidders

  • Automated: Log each query with no names
  • AI reads and drafts: Group the same questions
  • AI reads and drafts: Draft answers from the documents
  • Your team decides: Approve every answer
  • Automated: Send each answer to all bidders
  • Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

06Analyse returned main contractor tenders and draft the tender report

  • AI reads and drafts: Read prices from each tender
  • Automated: Check the sums
  • AI reads and drafts: Compare line by line
  • AI reads and drafts: Price the qualifications
  • AI reads and drafts: Draft the report
  • Your team decides: Sign the recommendation

Passes on: the tenders compared, and a draft report

07Turn returned tender prices into a benchmark cost database

  • AI reads and drafts: Read each priced tender
  • AI reads and drafts: Map prices to elements
  • Automated: Adjust for date and place
  • Automated: Store them with job details
  • Your team decides: Check each entry
  • Your team decides: Pick which data to use

Ends with: the tender prices added to your benchmark data for next time

11automated17by AI13decided by your team

Before, by hand

Plan the cost

1Draft the cost plan
2Estimate whole life carbon
3Explain cost plan moves

Run the tender

4Build the tender pack
5Answer bidder queries

Report and learn

6Draft the tender report
7Build the cost database

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the cost

1Draft the cost plan

AI reads and drafts: Map the scheme to NRM1 elements

AI reads and drafts: Pick like rates from past jobs

Automated: Adjust for date and place

AI reads and drafts: Draft the plan and assumptions

Your team decides: Check quantities and rates

Your team decides: Sign the cost plan

Passes on: an NRM1 cost plan from the drawings, brief and past costs

2Estimate whole life carbon

AI reads and drafts: Map cost items to materials

Automated: Apply carbon factors

Automated: Total it by life cycle stage

AI reads and drafts: Draft the report

Your team decides: Check the mappings

Your team decides: Sign the assessment

Passes on: a carbon estimate from the same cost plan

3Explain cost plan moves

Automated: Compare each cost plan version

AI reads and drafts: Link each change to a cause

Automated: Check the totals balance

AI reads and drafts: Draft the commentary

Your team decides: Check the reasons

Your team decides: Sign off the report

Passes on: why the cost plan moved between stages

Run the tender

4Build the tender pack

Automated: Fill templates from job data

AI reads and drafts: Check the documents agree

AI reads and drafts: List what is missing

Your team decides: Check the pack

Your team decides: Approve the contract choices

Passes on: the client's tender pack for the main contract, ready to go out

5Answer bidder queries

Automated: Log each query with no names

AI reads and drafts: Group the same questions

AI reads and drafts: Draft answers from the documents

Your team decides: Approve every answer

Automated: Send each answer to all bidders

Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

Report and learn

6Draft the tender report

AI reads and drafts: Read prices from each tender

Automated: Check the sums

AI reads and drafts: Compare line by line

AI reads and drafts: Price the qualifications

AI reads and drafts: Draft the report

Your team decides: Sign the recommendation

Passes on: the tenders compared, and a draft report

7Build the cost database

AI reads and drafts: Read each priced tender

AI reads and drafts: Map prices to elements

Automated: Adjust for date and place

Automated: Store them with job details

Your team decides: Check each entry

Your team decides: Pick which data to use

Ends with: the tender prices added to your benchmark data for next time

11automated

17by AI

13decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Two-stage tender: first-stage appointment to agreed contract sum

Before, by hand

Track and check

Test and explain

01Run second-stage package tenders and track them against the first-stage target on two-stage work

  • Update the cost for each package
  • Compare with the target
  • Give reasons for each variance
  • Draft the monthly report
  • Agree package values
  • Agree the contract sum

02Check a contractor's second-stage price against the cost plan

  • Map each package to the cost plan
  • Check quotes and qualifications
  • Explain each variance
  • Draft the reply to the contractor
  • Pick points to challenge
  • Decide whether to proceed

03Benchmark a tender price against past jobs and elemental rates

  • Map the price to elements
  • Adjust past rates for date and area
  • Compare with past jobs
  • Flag the outliers
  • Look into each outlier
  • Decide the adjustments

04Find value engineering options and track the savings agreed

  • Find the high-cost items
  • Suggest options from past jobs
  • Work out cost and time impact
  • Agree which options go in
  • Approve design changes
  • Track the agreed savings

05Explain cost plan movements between design stages

  • Compare each cost plan version
  • Link each change to a cause
  • Check the totals balance
  • Draft the commentary
  • Check the reasons
  • Sign off the report

30tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Track and check

Test and explain

01Run second-stage package tenders and track them against the first-stage target on two-stage work

  • Automated: Update the cost for each package
  • Automated: Compare with the target
  • AI reads and drafts: Give reasons for each variance
  • AI reads and drafts: Draft the monthly report
  • Your team decides: Agree package values
  • Your team decides: Agree the contract sum

Passes on: the price for each package, set against the stage one target

02Check a contractor's second-stage price against the cost plan

  • AI reads and drafts: Map each package to the cost plan
  • AI reads and drafts: Check quotes and qualifications
  • AI reads and drafts: Explain each variance
  • AI reads and drafts: Draft the reply to the contractor
  • Your team decides: Pick points to challenge
  • Your team decides: Decide whether to proceed

Passes on: the price checked to the cost plan, with points to challenge

03Benchmark a tender price against past jobs and elemental rates

  • AI reads and drafts: Map the price to elements
  • Automated: Adjust past rates for date and area
  • AI reads and drafts: Compare with past jobs
  • AI reads and drafts: Flag the outliers
  • Your team decides: Look into each outlier
  • Your team decides: Decide the adjustments

Passes on: the price set against past cost per m2 and by element, with outliers

04Find value engineering options and track the savings agreed

  • AI reads and drafts: Find the high-cost items
  • AI reads and drafts: Suggest options from past jobs
  • AI reads and drafts: Work out cost and time impact
  • Your team decides: Agree which options go in
  • Your team decides: Approve design changes
  • Automated: Track the agreed savings

Passes on: VE options with cost, time and risk notes, and the savings agreed

05Explain cost plan movements between design stages

  • Automated: Compare each cost plan version
  • AI reads and drafts: Link each change to a cause
  • Automated: Check the totals balance
  • AI reads and drafts: Draft the commentary
  • Your team decides: Check the reasons
  • Your team decides: Sign off the report

Ends with: a plain account of each move from the first cost plan to the price

6automated14by AI10decided by your team

Before, by hand

Track and check

1Track second stage costs
2Check second stage price

Test and explain

3Benchmark the tender price
4Find VE savings
5Explain cost plan moves

30tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Track and check

1Track second stage costs

Automated: Update the cost for each package

Automated: Compare with the target

AI reads and drafts: Give reasons for each variance

AI reads and drafts: Draft the monthly report

Your team decides: Agree package values

Your team decides: Agree the contract sum

Passes on: the price for each package, set against the stage one target

2Check second stage price

AI reads and drafts: Map each package to the cost plan

AI reads and drafts: Check quotes and qualifications

AI reads and drafts: Explain each variance

AI reads and drafts: Draft the reply to the contractor

Your team decides: Pick points to challenge

Your team decides: Decide whether to proceed

Passes on: the price checked to the cost plan, with points to challenge

Test and explain

3Benchmark the tender price

AI reads and drafts: Map the price to elements

Automated: Adjust past rates for date and area

AI reads and drafts: Compare with past jobs

AI reads and drafts: Flag the outliers

Your team decides: Look into each outlier

Your team decides: Decide the adjustments

Passes on: the price set against past cost per m2 and by element, with outliers

4Find VE savings

AI reads and drafts: Find the high-cost items

AI reads and drafts: Suggest options from past jobs

AI reads and drafts: Work out cost and time impact

Your team decides: Agree which options go in

Your team decides: Approve design changes

Automated: Track the agreed savings

Passes on: VE options with cost, time and risk notes, and the savings agreed

5Explain cost plan moves

Automated: Compare each cost plan version

AI reads and drafts: Link each change to a cause

Automated: Check the totals balance

AI reads and drafts: Draft the commentary

Your team decides: Check the reasons

Your team decides: Sign off the report

Ends with: a plain account of each move from the first cost plan to the price

6automated

14by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Employer's requirements to appointed design and build contractor

Before, by hand

Write and invite

Compare the bids

Second stage and contract

01Draft employer's requirements from the company's standard specification and the scheme details

  • Start from your standard spec
  • Add the scheme details
  • Flag conflicts and gaps
  • Finalise the draft
  • Have advisers check legal terms
  • Approve the ERs

02Check shortlisted contractors before inviting them to tender

  • Pull Companies House and award data
  • Sum up each contractor
  • Flag warning signs
  • Compare them side by side
  • Approve the tender list

03Compare design and build proposals against the employer's requirements

  • Pull spec items from each one
  • Line them up side by side
  • List each gap and how serious
  • Draft clarification questions
  • Judge what you can accept
  • Agree the questions

04Compare main contractor tenders against the appraisal budget and employer's requirements

  • Read each tender return
  • Pull out price and qualifications
  • Level the bids
  • Run each through the appraisal
  • List the risks
  • Choose the contractor

05Check a contractor's second-stage price against the cost plan

  • Map each package to the cost plan
  • Check quotes and qualifications
  • Explain each variance
  • Draft the reply to the contractor
  • Pick points to challenge
  • Decide whether to proceed

06Run second-stage package tenders and track them against the first-stage target on two-stage work

  • Update the cost for each package
  • Compare with the target
  • Give reasons for each variance
  • Draft the monthly report
  • Agree package values
  • Agree the contract sum

07Review contracts and terms against your standard positions and flag risks

  • Read each clause
  • Compare with your standard terms
  • Rate the risk
  • Draft the changes to ask for
  • Decide what to accept

40tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Write and invite

Compare the bids

Second stage and contract

01Draft employer's requirements from the company's standard specification and the scheme details

  • Automated: Start from your standard spec
  • AI reads and drafts: Add the scheme details
  • AI reads and drafts: Flag conflicts and gaps
  • Your team decides: Finalise the draft
  • Your team decides: Have advisers check legal terms
  • Your team decides: Approve the ERs

Passes on: ERs drafted from your standard spec and the scheme, with a list of gaps

02Check shortlisted contractors before inviting them to tender

  • Automated: Pull Companies House and award data
  • AI reads and drafts: Sum up each contractor
  • AI reads and drafts: Flag warning signs
  • AI reads and drafts: Compare them side by side
  • Your team decides: Approve the tender list

Passes on: each company on the list checked: sound finances, room to take it on, and past jobs

03Compare design and build proposals against the employer's requirements

  • AI reads and drafts: Pull spec items from each one
  • AI reads and drafts: Line them up side by side
  • AI reads and drafts: List each gap and how serious
  • AI reads and drafts: Draft clarification questions
  • Your team decides: Judge what you can accept
  • Your team decides: Agree the questions

Passes on: each proposal next to your ERs, with questions to ask

04Compare main contractor tenders against the appraisal budget and employer's requirements

  • AI reads and drafts: Read each tender return
  • AI reads and drafts: Pull out price and qualifications
  • AI reads and drafts: Level the bids
  • Automated: Run each through the appraisal
  • AI reads and drafts: List the risks
  • Your team decides: Choose the contractor

Passes on: tenders set next to the budget, with the margin effect and a risk list

05Check a contractor's second-stage price against the cost plan

  • AI reads and drafts: Map each package to the cost plan
  • AI reads and drafts: Check quotes and qualifications
  • AI reads and drafts: Explain each variance
  • AI reads and drafts: Draft the reply to the contractor
  • Your team decides: Pick points to challenge
  • Your team decides: Decide whether to proceed

Passes on: the second stage price set next to the cost plan and the open book

06Run second-stage package tenders and track them against the first-stage target on two-stage work

  • Automated: Update the cost for each package
  • Automated: Compare with the target
  • AI reads and drafts: Give reasons for each variance
  • AI reads and drafts: Draft the monthly report
  • Your team decides: Agree package values
  • Your team decides: Agree the contract sum

Passes on: stage two package tenders, set next to the stage one target

07Review contracts and terms against your standard positions and flag risks

  • AI reads and drafts: Read each clause
  • AI reads and drafts: Compare with your standard terms
  • AI reads and drafts: Rate the risk
  • AI reads and drafts: Draft the changes to ask for
  • Your team decides: Decide what to accept

Ends with: the contract next to your usual terms, so the board can decide

5automated23by AI12decided by your team

Before, by hand

Write and invite

1Draft the ERs
2Check the contractors

Compare the bids

3Compare the proposals
4Compare the tenders

Second stage and contract

5Check second stage price
6Track second stage costs
7Review the contract

40tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Write and invite

1Draft the ERs

Automated: Start from your standard spec

AI reads and drafts: Add the scheme details

AI reads and drafts: Flag conflicts and gaps

Your team decides: Finalise the draft

Your team decides: Have advisers check legal terms

Your team decides: Approve the ERs

Passes on: ERs drafted from your standard spec and the scheme, with a list of gaps

2Check the contractors

Automated: Pull Companies House and award data

AI reads and drafts: Sum up each contractor

AI reads and drafts: Flag warning signs

AI reads and drafts: Compare them side by side

Your team decides: Approve the tender list

Passes on: each company on the list checked: sound finances, room to take it on, and past jobs

Compare the bids

3Compare the proposals

AI reads and drafts: Pull spec items from each one

AI reads and drafts: Line them up side by side

AI reads and drafts: List each gap and how serious

AI reads and drafts: Draft clarification questions

Your team decides: Judge what you can accept

Your team decides: Agree the questions

Passes on: each proposal next to your ERs, with questions to ask

4Compare the tenders

AI reads and drafts: Read each tender return

AI reads and drafts: Pull out price and qualifications

AI reads and drafts: Level the bids

Automated: Run each through the appraisal

AI reads and drafts: List the risks

Your team decides: Choose the contractor

Passes on: tenders set next to the budget, with the margin effect and a risk list

Second stage and contract

5Check second stage price

AI reads and drafts: Map each package to the cost plan

AI reads and drafts: Check quotes and qualifications

AI reads and drafts: Explain each variance

AI reads and drafts: Draft the reply to the contractor

Your team decides: Pick points to challenge

Your team decides: Decide whether to proceed

Passes on: the second stage price set next to the cost plan and the open book

6Track second stage costs

Automated: Update the cost for each package

Automated: Compare with the target

AI reads and drafts: Give reasons for each variance

AI reads and drafts: Draft the monthly report

Your team decides: Agree package values

Your team decides: Agree the contract sum

Passes on: stage two package tenders, set next to the stage one target

7Review the contract

AI reads and drafts: Read each clause

AI reads and drafts: Compare with your standard terms

AI reads and drafts: Rate the risk

AI reads and drafts: Draft the changes to ask for

Your team decides: Decide what to accept

Ends with: the contract next to your usual terms, so the board can decide

5automated

23by AI

12decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Employer's requirements to design and build tender recommendation

Before, by hand

Write and issue

Compare and report

01Draft employer's requirements from the company's standard specification and the scheme details

  • Start from your standard spec
  • Add the scheme details
  • Flag conflicts and gaps
  • Finalise the draft
  • Have advisers check legal terms
  • Approve the ERs

02Assemble the employer's tender documents for a main contract

  • Fill templates from job data
  • Check the documents agree
  • List what is missing
  • Check the pack
  • Approve the contract choices

03Log bidders' tender queries and draft answers to issue equally to all bidders

  • Log each query with no names
  • Group the same questions
  • Draft answers from the documents
  • Approve every answer
  • Send each answer to all bidders
  • Approve any extra time

04Compare design and build proposals against the employer's requirements

  • Pull spec items from each one
  • Line them up side by side
  • List each gap and how serious
  • Draft clarification questions
  • Judge what you can accept
  • Agree the questions

05Analyse returned main contractor tenders and draft the tender report

  • Read prices from each tender
  • Check the sums
  • Compare line by line
  • Price the qualifications
  • Draft the report
  • Sign the recommendation

29tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Write and issue

Compare and report

01Draft employer's requirements from the company's standard specification and the scheme details

  • Automated: Start from your standard spec
  • AI reads and drafts: Add the scheme details
  • AI reads and drafts: Flag conflicts and gaps
  • Your team decides: Finalise the draft
  • Your team decides: Have advisers check legal terms
  • Your team decides: Approve the ERs

Passes on: draft ERs from the client's standard spec, with a change and gap list

02Assemble the employer's tender documents for a main contract

  • Automated: Fill templates from job data
  • AI reads and drafts: Check the documents agree
  • AI reads and drafts: List what is missing
  • Your team decides: Check the pack
  • Your team decides: Approve the contract choices

Passes on: the tender pack, with a list of where the papers don't agree

03Log bidders' tender queries and draft answers to issue equally to all bidders

  • Automated: Log each query with no names
  • AI reads and drafts: Group the same questions
  • AI reads and drafts: Draft answers from the documents
  • Your team decides: Approve every answer
  • Automated: Send each answer to all bidders
  • Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

04Compare design and build proposals against the employer's requirements

  • AI reads and drafts: Pull spec items from each one
  • AI reads and drafts: Line them up side by side
  • AI reads and drafts: List each gap and how serious
  • AI reads and drafts: Draft clarification questions
  • Your team decides: Judge what you can accept
  • Your team decides: Agree the questions

Passes on: each bid set against the ERs in a grid, with draft questions

05Analyse returned main contractor tenders and draft the tender report

  • AI reads and drafts: Read prices from each tender
  • Automated: Check the sums
  • AI reads and drafts: Compare line by line
  • AI reads and drafts: Price the qualifications
  • AI reads and drafts: Draft the report
  • Your team decides: Sign the recommendation

Ends with: a draft tender report that weighs design as well as price

5automated14by AI10decided by your team

Before, by hand

Write and issue

1Draft the ERs
2Build the tender pack
3Answer bidder queries

Compare and report

4Compare the proposals
5Draft the tender report

29tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Write and issue

1Draft the ERs

Automated: Start from your standard spec

AI reads and drafts: Add the scheme details

AI reads and drafts: Flag conflicts and gaps

Your team decides: Finalise the draft

Your team decides: Have advisers check legal terms

Your team decides: Approve the ERs

Passes on: draft ERs from the client's standard spec, with a change and gap list

2Build the tender pack

Automated: Fill templates from job data

AI reads and drafts: Check the documents agree

AI reads and drafts: List what is missing

Your team decides: Check the pack

Your team decides: Approve the contract choices

Passes on: the tender pack, with a list of where the papers don't agree

3Answer bidder queries

Automated: Log each query with no names

AI reads and drafts: Group the same questions

AI reads and drafts: Draft answers from the documents

Your team decides: Approve every answer

Automated: Send each answer to all bidders

Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

Compare and report

4Compare the proposals

AI reads and drafts: Pull spec items from each one

AI reads and drafts: Line them up side by side

AI reads and drafts: List each gap and how serious

AI reads and drafts: Draft clarification questions

Your team decides: Judge what you can accept

Your team decides: Agree the questions

Passes on: each bid set against the ERs in a grid, with draft questions

5Draft the tender report

AI reads and drafts: Read prices from each tender

Automated: Check the sums

AI reads and drafts: Compare line by line

AI reads and drafts: Price the qualifications

AI reads and drafts: Draft the report

Your team decides: Sign the recommendation

Ends with: a draft tender report that weighs design as well as price

5automated

14by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.