Built Logic

See what AI can do

Estimate embodied and whole life carbon from the cost plan or bill

We take off your hands: matching each cost plan or bill item to its carbon factor. Working out the carbon for each element at each stage.

You get: a carbon estimate by element, set out the RICS way. Options compared on cost and carbon. A draft report for a competent assessor to check and sign.

Get a price for this

Or check first: Are we ready for AI?

The problem

Clients ask for carbon as well as cost. We have to send it out to someone else.

How it works

  1. What comes in

    • Elemental cost plan or bill quantities, specification notes, carbon factor database
  2. What AI does

    Maps cost items to materials and carbon factors, calculates by life cycle module, records departures from the standard, and drafts the report and compliance certificate.

  3. What you get

    • Carbon estimate by element and module, cost and carbon comparison, draft report
  4. Who signs it off

    A competent assessor checks how each item is matched, and what's assumed. Then they sign the assessment. They sign the compliance certificate too.

What it needs to work

  • Structured cost plan data
  • Licensed carbon database such as BCIS Life Cycle Evaluator or One Click LCA

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors
  • Surveyors and cost consultants

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Early cost plan to tender report

Before, by hand

Plan the cost

Run the tender

Report and learn

01Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • Map the scheme to NRM1 elements
  • Pick like rates from past jobs
  • Adjust for date and place
  • Draft the plan and assumptions
  • Check quantities and rates
  • Sign the cost plan

This step02Estimate embodied and whole life carbon from the cost plan or bill

  • Map cost items to materials
  • Apply carbon factors
  • Total it by life cycle stage
  • Draft the report
  • Check the mappings
  • Sign the assessment

03Explain cost plan movements between design stages

  • Compare each cost plan version
  • Link each change to a cause
  • Check the totals balance
  • Draft the commentary
  • Check the reasons
  • Sign off the report

04Assemble the employer's tender documents for a main contract

  • Fill templates from job data
  • Check the documents agree
  • List what is missing
  • Check the pack
  • Approve the contract choices

05Log bidders' tender queries and draft answers to issue equally to all bidders

  • Log each query with no names
  • Group the same questions
  • Draft answers from the documents
  • Approve every answer
  • Send each answer to all bidders
  • Approve any extra time

06Analyse returned main contractor tenders and draft the tender report

  • Read prices from each tender
  • Check the sums
  • Compare line by line
  • Price the qualifications
  • Draft the report
  • Sign the recommendation

07Turn returned tender prices into a benchmark cost database

  • Read each priced tender
  • Map prices to elements
  • Adjust for date and place
  • Store them with job details
  • Check each entry
  • Pick which data to use

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the cost

Run the tender

Report and learn

01Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • AI reads and drafts: Map the scheme to NRM1 elements
  • AI reads and drafts: Pick like rates from past jobs
  • Automated: Adjust for date and place
  • AI reads and drafts: Draft the plan and assumptions
  • Your team decides: Check quantities and rates
  • Your team decides: Sign the cost plan

Passes on: an NRM1 cost plan from the drawings, brief and past costs

This step02Estimate embodied and whole life carbon from the cost plan or bill

  • AI reads and drafts: Map cost items to materials
  • Automated: Apply carbon factors
  • Automated: Total it by life cycle stage
  • AI reads and drafts: Draft the report
  • Your team decides: Check the mappings
  • Your team decides: Sign the assessment

Passes on: a carbon estimate from the same cost plan

03Explain cost plan movements between design stages

  • Automated: Compare each cost plan version
  • AI reads and drafts: Link each change to a cause
  • Automated: Check the totals balance
  • AI reads and drafts: Draft the commentary
  • Your team decides: Check the reasons
  • Your team decides: Sign off the report

Passes on: why the cost plan moved between stages

04Assemble the employer's tender documents for a main contract

  • Automated: Fill templates from job data
  • AI reads and drafts: Check the documents agree
  • AI reads and drafts: List what is missing
  • Your team decides: Check the pack
  • Your team decides: Approve the contract choices

Passes on: the client's tender pack for the main contract, ready to go out

05Log bidders' tender queries and draft answers to issue equally to all bidders

  • Automated: Log each query with no names
  • AI reads and drafts: Group the same questions
  • AI reads and drafts: Draft answers from the documents
  • Your team decides: Approve every answer
  • Automated: Send each answer to all bidders
  • Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

06Analyse returned main contractor tenders and draft the tender report

  • AI reads and drafts: Read prices from each tender
  • Automated: Check the sums
  • AI reads and drafts: Compare line by line
  • AI reads and drafts: Price the qualifications
  • AI reads and drafts: Draft the report
  • Your team decides: Sign the recommendation

Passes on: the tenders compared, and a draft report

07Turn returned tender prices into a benchmark cost database

  • AI reads and drafts: Read each priced tender
  • AI reads and drafts: Map prices to elements
  • Automated: Adjust for date and place
  • Automated: Store them with job details
  • Your team decides: Check each entry
  • Your team decides: Pick which data to use

Ends with: the tender prices added to your benchmark data for next time

11automated17by AI13decided by your team

Before, by hand

Plan the cost

1Draft the cost plan
2Estimate whole life carbonThis step
3Explain cost plan moves

Run the tender

4Build the tender pack
5Answer bidder queries

Report and learn

6Draft the tender report
7Build the cost database

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the cost

1Draft the cost plan

AI reads and drafts: Map the scheme to NRM1 elements

AI reads and drafts: Pick like rates from past jobs

Automated: Adjust for date and place

AI reads and drafts: Draft the plan and assumptions

Your team decides: Check quantities and rates

Your team decides: Sign the cost plan

Passes on: an NRM1 cost plan from the drawings, brief and past costs

2Estimate whole life carbonThis step

AI reads and drafts: Map cost items to materials

Automated: Apply carbon factors

Automated: Total it by life cycle stage

AI reads and drafts: Draft the report

Your team decides: Check the mappings

Your team decides: Sign the assessment

Passes on: a carbon estimate from the same cost plan

3Explain cost plan moves

Automated: Compare each cost plan version

AI reads and drafts: Link each change to a cause

Automated: Check the totals balance

AI reads and drafts: Draft the commentary

Your team decides: Check the reasons

Your team decides: Sign off the report

Passes on: why the cost plan moved between stages

Run the tender

4Build the tender pack

Automated: Fill templates from job data

AI reads and drafts: Check the documents agree

AI reads and drafts: List what is missing

Your team decides: Check the pack

Your team decides: Approve the contract choices

Passes on: the client's tender pack for the main contract, ready to go out

5Answer bidder queries

Automated: Log each query with no names

AI reads and drafts: Group the same questions

AI reads and drafts: Draft answers from the documents

Your team decides: Approve every answer

Automated: Send each answer to all bidders

Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

Report and learn

6Draft the tender report

AI reads and drafts: Read prices from each tender

Automated: Check the sums

AI reads and drafts: Compare line by line

AI reads and drafts: Price the qualifications

AI reads and drafts: Draft the report

Your team decides: Sign the recommendation

Passes on: the tenders compared, and a draft report

7Build the cost database

AI reads and drafts: Read each priced tender

AI reads and drafts: Map prices to elements

Automated: Adjust for date and place

Automated: Store them with job details

Your team decides: Check each entry

Your team decides: Pick which data to use

Ends with: the tender prices added to your benchmark data for next time

11automated

17by AI

13decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.