Review subcontractor RAMS against the site rules, construction phase plan and task hazards

We take off your hands: reading through each subbie's long RAMS. Checking they fit your site.

You get: a marked-up review with draft comments. A suggested status. Your site manager accepts it or rejects it.

Get a price for this

Or check first: Are we ready for AI?

The problem

I get sent fifty pages of RAMS. I've no time to read them properly.

How it works

  1. What comes in

    • RAMS document, construction phase plan, site rules, programme activity, permit requirements
  2. What AI does

    Reads the RAMS, compares with site context and checklists, and drafts comments and a status recommendation.

  3. What you get

    • RAMS review comments and recommended status
  4. Who signs it off

    Your site manager or SHEQ adviser accepts or rejects each RAMS. The suggested status is only a guide.

What it needs to work

  • Up-to-date construction phase plan and site rules

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Pre-construction information to safe start on site

Before, by hand

Plan the job safely

Sort the RAMS

Ready for site

01Check the pre-construction information for gaps before work starts

  • Sort the documents
  • Check them against the standard list
  • Draft queries for the gaps
  • Decide which gaps matter
  • Send the queries

02Draft the construction phase plan and keep it up to date

  • Draft each section from the sources
  • Flag what is missing
  • Check the F10 thresholds
  • Suggest updates at each phase
  • Approve and brief the plan

03Prepare task-specific RAMS for review

  • Pick the right templates
  • Fit them to the site and task
  • List permits and checks
  • Put it in the client's format
  • Review and sign the RAMS
  • Brief the crew

This step04Review subcontractor RAMS against the site rules, construction phase plan and task hazards

  • Read the RAMS
  • Check it against site rules and hazards
  • Draft comments
  • Suggest accept or send back
  • Accept or send it back

05Check the permit to dig is complete before anyone breaks ground

  • Check each part is filled and dated
  • Compare the dig area with records
  • Check operator training and kit
  • Alert the issuer to gaps
  • Scan and mark the services
  • Sign the permit

06Run site inductions tailored to each worker's trade and the current site risks

  • Draft content from site documents
  • Approve the content
  • Run it with a short quiz
  • Log completion and card details
  • Flag missing cards
  • Give the face to face briefing

07Prepare the morning pre-start briefing for each supervisor

  • Pick today's work and permits
  • Sum up hazards and controls
  • Lay out a sheet per area
  • Add local knowledge
  • Give the briefing in person
  • Record who attended

39tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the job safely

Sort the RAMS

Ready for site

01Check the pre-construction information for gaps before work starts

  • AI reads and drafts: Sort the documents
  • AI reads and drafts: Check them against the standard list
  • AI reads and drafts: Draft queries for the gaps
  • Your team decides: Decide which gaps matter
  • Your team decides: Send the queries

Passes on: the gaps in the PCI, found before work starts

02Draft the construction phase plan and keep it up to date

  • AI reads and drafts: Draft each section from the sources
  • AI reads and drafts: Flag what is missing
  • Automated: Check the F10 thresholds
  • AI reads and drafts: Suggest updates at each phase
  • Your team decides: Approve and brief the plan

Passes on: a draft construction phase plan to work from

03Prepare task-specific RAMS for review

  • AI reads and drafts: Pick the right templates
  • AI reads and drafts: Fit them to the site and task
  • AI reads and drafts: List permits and checks
  • Automated: Put it in the client's format
  • Your team decides: Review and sign the RAMS
  • Your team decides: Brief the crew

Passes on: RAMS for each task, from the job details and your templates

This step04Review subcontractor RAMS against the site rules, construction phase plan and task hazards

  • AI reads and drafts: Read the RAMS
  • AI reads and drafts: Check it against site rules and hazards
  • AI reads and drafts: Draft comments
  • AI reads and drafts: Suggest accept or send back
  • Your team decides: Accept or send it back

Passes on: subbie RAMS, checked for the site rules and the risks

05Check the permit to dig is complete before anyone breaks ground

  • Automated: Check each part is filled and dated
  • AI reads and drafts: Compare the dig area with records
  • Automated: Check operator training and kit
  • Automated: Alert the issuer to gaps
  • Your team decides: Scan and mark the services
  • Your team decides: Sign the permit

Passes on: a permit to dig checked against the service maps and scan

06Run site inductions tailored to each worker's trade and the current site risks

  • AI reads and drafts: Draft content from site documents
  • Your team decides: Approve the content
  • Automated: Run it with a short quiz
  • Automated: Log completion and card details
  • Automated: Flag missing cards
  • Your team decides: Give the face to face briefing

Passes on: inductions that fit each trade and the risks on site

07Prepare the morning pre-start briefing for each supervisor

  • AI reads and drafts: Pick today's work and permits
  • AI reads and drafts: Sum up hazards and controls
  • Automated: Lay out a sheet per area
  • Your team decides: Add local knowledge
  • Your team decides: Give the briefing in person
  • Automated: Record who attended

Ends with: a pre-start brief for each team on the day's work, permits and weather

10automated17by AI12decided by your team

Before, by hand

Plan the job safely

1Check the PCI
2Draft the phase plan

Sort the RAMS

3Draft the RAMS
4Review the RAMSThis step

Ready for site

5Check the dig permit
6Run the inductions
7Prep the briefing

39tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the job safely

1Check the PCI

AI reads and drafts: Sort the documents

AI reads and drafts: Check them against the standard list

AI reads and drafts: Draft queries for the gaps

Your team decides: Decide which gaps matter

Your team decides: Send the queries

Passes on: the gaps in the PCI, found before work starts

2Draft the phase plan

AI reads and drafts: Draft each section from the sources

AI reads and drafts: Flag what is missing

Automated: Check the F10 thresholds

AI reads and drafts: Suggest updates at each phase

Your team decides: Approve and brief the plan

Passes on: a draft construction phase plan to work from

Sort the RAMS

3Draft the RAMS

AI reads and drafts: Pick the right templates

AI reads and drafts: Fit them to the site and task

AI reads and drafts: List permits and checks

Automated: Put it in the client's format

Your team decides: Review and sign the RAMS

Your team decides: Brief the crew

Passes on: RAMS for each task, from the job details and your templates

4Review the RAMSThis step

AI reads and drafts: Read the RAMS

AI reads and drafts: Check it against site rules and hazards

AI reads and drafts: Draft comments

AI reads and drafts: Suggest accept or send back

Your team decides: Accept or send it back

Passes on: subbie RAMS, checked for the site rules and the risks

Ready for site

5Check the dig permit

Automated: Check each part is filled and dated

AI reads and drafts: Compare the dig area with records

Automated: Check operator training and kit

Automated: Alert the issuer to gaps

Your team decides: Scan and mark the services

Your team decides: Sign the permit

Passes on: a permit to dig checked against the service maps and scan

6Run the inductions

AI reads and drafts: Draft content from site documents

Your team decides: Approve the content

Automated: Run it with a short quiz

Automated: Log completion and card details

Automated: Flag missing cards

Your team decides: Give the face to face briefing

Passes on: inductions that fit each trade and the risks on site

7Prep the briefing

AI reads and drafts: Pick today's work and permits

AI reads and drafts: Sum up hazards and controls

Automated: Lay out a sheet per area

Your team decides: Add local knowledge

Your team decides: Give the briefing in person

Automated: Record who attended

Ends with: a pre-start brief for each team on the day's work, permits and weather

10automated

17by AI

12decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.