Draft a bill of materials from approved drawings
We take off your hands: re-keying parts lists from approved drawings into your ERP and matching each item to a stock code.
You get: a draft bill of materials in your ERP's import format, with unmatched items and unclear quantities listed for your design engineer to check.
Get a price for thisOr check first: Are we ready for AI?
The problem
Our engineers re-key every parts list by hand.
How it works
What comes in
- Approved drawings or CAD exports, item master and stock codes from the ERP, standard assemblies
What AI does
Extracts components and quantities, maps them to stock codes, groups them by assembly, and lists exceptions for review before loading to the ERP.
What you get
- A draft BOM in the ERP's import format and an exception list
Who signs it off
Your design engineer checks and releases the bill of materials, and a person approves the load into the ERP.
What it needs to work
- Consistent drawing conventions
- Access to the item master
- ERP import route
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
- Manufacturers and suppliers
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?