Price a maintenance tender from the client's asset list using SFG20

We take off your hands: matching each item on a huge asset list to its SFG20 schedule. Adding up the labour hours, the travel and the specialist costs.

You get: a draft price build-up and a labour plan by skill level. The assumptions that drive the price. Your estimator sets the rates, risk and margin.

Get a price for this

Or check first: Are we ready for AI?

The problem

We price maintenance tenders on gut feel. The asset lists are huge.

How it works

  1. What comes in

    • Tender asset list, scope and SLAs, SFG20 licence, labour rates, site locations, subcontractor prices
  2. What AI does

    Matches assets to schedules, totals hours by skill and site, models travel, and builds a price build-up with assumptions listed.

  3. What you get

    • Draft price build-up, labour and resource plan, assumptions and exclusions list
  4. Who signs it off

    Your estimator and director set the rates, risk and margin. Then they sign off the bid.

What it needs to work

  • SFG20 licence
  • Usable asset list
  • Company's rate data

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Maintenance contract tender from asset list to priced bid

Before, by hand

Read the tender

Plan and price

Write and send

01Summarise a tender pack before pricing starts

  • Read the whole tender pack
  • Pull out dates and weightings
  • Note the page for each fact
  • Fill the brief template
  • List gaps and clashes
  • Check the brief against the pack

02Sample-check a client's asset list on site before pricing maintenance

  • Pick the sample
  • Check assets on site
  • Compare findings with the list
  • Work out error rates
  • Draft the qualifications
  • Decide how to price the risk

03Build an SFG20 planned maintenance schedule from a client's asset list

  • Clean and group the asset list
  • Match each asset to SFG20
  • Build visits and labour hours
  • List assets with no match
  • Confirm matches and frequencies
  • Approve the plan

This step04Price a maintenance tender from the client's asset list using SFG20

  • Match assets to SFG20 schedules
  • Total hours and travel by site
  • Build the price with assumptions
  • Set rates, risk and margin
  • Sign off the bid

05Prepare TUPE employee information and due diligence when service contracts are won or lost

  • Collect the staff records
  • Check them against the legal list
  • Sum up cost and risk
  • Draft the consultation timeline
  • Run the consultation
  • Decide how to price the cost

06Show the margin on every maintenance contract, site by site

  • Pull hours, travel and parts costs
  • Split costs by contract and site
  • Work out each margin
  • Explain what drives each loss
  • Agree how costs are split
  • Make the pricing decisions

07Draft the qualifications and exclusions schedule for a tender

  • Pull gaps from pricing and queries
  • Match wording from the library
  • Check the tender rules allow them
  • Draft the list
  • Choose which ones go in
  • Approve the wording

08Put a specialist's quote into the main contractor's required format

  • Map the estimate to their format
  • Draft scope and qualifications
  • Check nothing is missing
  • Review the quote
  • Sign off the final price

09Follow up open quotes and record why orders were won or lost

  • Set a follow-up date for each
  • Draft each chaser
  • Approve and send each one
  • Read replies for win or loss
  • Confirm the reason
  • Sum up why work was lost

52tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Read the tender

Plan and price

Write and send

01Summarise a tender pack before pricing starts

  • AI reads and drafts: Read the whole tender pack
  • AI reads and drafts: Pull out dates and weightings
  • AI reads and drafts: Note the page for each fact
  • Automated: Fill the brief template
  • AI reads and drafts: List gaps and clashes
  • Your team decides: Check the brief against the pack

Passes on: a one-page brief on scope, sites, times, terms and the deadline

02Sample-check a client's asset list on site before pricing maintenance

  • Automated: Pick the sample
  • Your team decides: Check assets on site
  • AI reads and drafts: Compare findings with the list
  • Automated: Work out error rates
  • AI reads and drafts: Draft the qualifications
  • Your team decides: Decide how to price the risk

Passes on: how much you can trust the asset list, and draft terms to protect you

03Build an SFG20 planned maintenance schedule from a client's asset list

  • AI reads and drafts: Clean and group the asset list
  • AI reads and drafts: Match each asset to SFG20
  • Automated: Build visits and labour hours
  • Automated: List assets with no match
  • Your team decides: Confirm matches and frequencies
  • Your team decides: Approve the plan

Passes on: a draft SFG20 plan from the asset list, and any assets it can't match

This step04Price a maintenance tender from the client's asset list using SFG20

  • AI reads and drafts: Match assets to SFG20 schedules
  • Automated: Total hours and travel by site
  • Automated: Build the price with assumptions
  • Your team decides: Set rates, risk and margin
  • Your team decides: Sign off the bid

Passes on: a price from SFG20 task times, travel and your labour rates

05Prepare TUPE employee information and due diligence when service contracts are won or lost

  • Automated: Collect the staff records
  • AI reads and drafts: Check them against the legal list
  • AI reads and drafts: Sum up cost and risk
  • AI reads and drafts: Draft the consultation timeline
  • Your team decides: Run the consultation
  • Your team decides: Decide how to price the cost

Passes on: the TUPE staff info reviewed, with cost and risk

06Show the margin on every maintenance contract, site by site

  • Automated: Pull hours, travel and parts costs
  • Automated: Split costs by contract and site
  • Automated: Work out each margin
  • AI reads and drafts: Explain what drives each loss
  • Your team decides: Agree how costs are split
  • Your team decides: Make the pricing decisions

Passes on: what the contract makes or loses today, site by site, to price against

07Draft the qualifications and exclusions schedule for a tender

  • AI reads and drafts: Pull gaps from pricing and queries
  • AI reads and drafts: Match wording from the library
  • AI reads and drafts: Check the tender rules allow them
  • AI reads and drafts: Draft the list
  • Your team decides: Choose which ones go in
  • Your team decides: Approve the wording

Passes on: the terms you price on, and what you leave out, such as assets not seen

08Put a specialist's quote into the main contractor's required format

  • Automated: Map the estimate to their format
  • AI reads and drafts: Draft scope and qualifications
  • AI reads and drafts: Check nothing is missing
  • Your team decides: Review the quote
  • Your team decides: Sign off the final price

Passes on: the tender set out in the format the client asks for

09Follow up open quotes and record why orders were won or lost

  • Automated: Set a follow-up date for each
  • AI reads and drafts: Draft each chaser
  • Your team decides: Approve and send each one
  • AI reads and drafts: Read replies for win or loss
  • Your team decides: Confirm the reason
  • AI reads and drafts: Sum up why work was lost

Ends with: the bid chased, and the result logged with the reasons

13automated22by AI17decided by your team

Before, by hand

Read the tender

1Sum up the tender
2Sample the asset list

Plan and price

3Build the PPM schedule
4Price the asset listThis step
5Prepare the TUPE pack
6Show margin by site

Write and send

7Draft the qualifications
8Format the quote
9Chase the quotes

52tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Read the tender

1Sum up the tender

AI reads and drafts: Read the whole tender pack

AI reads and drafts: Pull out dates and weightings

AI reads and drafts: Note the page for each fact

Automated: Fill the brief template

AI reads and drafts: List gaps and clashes

Your team decides: Check the brief against the pack

Passes on: a one-page brief on scope, sites, times, terms and the deadline

2Sample the asset list

Automated: Pick the sample

Your team decides: Check assets on site

AI reads and drafts: Compare findings with the list

Automated: Work out error rates

AI reads and drafts: Draft the qualifications

Your team decides: Decide how to price the risk

Passes on: how much you can trust the asset list, and draft terms to protect you

Plan and price

3Build the PPM schedule

AI reads and drafts: Clean and group the asset list

AI reads and drafts: Match each asset to SFG20

Automated: Build visits and labour hours

Automated: List assets with no match

Your team decides: Confirm matches and frequencies

Your team decides: Approve the plan

Passes on: a draft SFG20 plan from the asset list, and any assets it can't match

4Price the asset listThis step

AI reads and drafts: Match assets to SFG20 schedules

Automated: Total hours and travel by site

Automated: Build the price with assumptions

Your team decides: Set rates, risk and margin

Your team decides: Sign off the bid

Passes on: a price from SFG20 task times, travel and your labour rates

5Prepare the TUPE pack

Automated: Collect the staff records

AI reads and drafts: Check them against the legal list

AI reads and drafts: Sum up cost and risk

AI reads and drafts: Draft the consultation timeline

Your team decides: Run the consultation

Your team decides: Decide how to price the cost

Passes on: the TUPE staff info reviewed, with cost and risk

6Show margin by site

Automated: Pull hours, travel and parts costs

Automated: Split costs by contract and site

Automated: Work out each margin

AI reads and drafts: Explain what drives each loss

Your team decides: Agree how costs are split

Your team decides: Make the pricing decisions

Passes on: what the contract makes or loses today, site by site, to price against

Write and send

7Draft the qualifications

AI reads and drafts: Pull gaps from pricing and queries

AI reads and drafts: Match wording from the library

AI reads and drafts: Check the tender rules allow them

AI reads and drafts: Draft the list

Your team decides: Choose which ones go in

Your team decides: Approve the wording

Passes on: the terms you price on, and what you leave out, such as assets not seen

8Format the quote

Automated: Map the estimate to their format

AI reads and drafts: Draft scope and qualifications

AI reads and drafts: Check nothing is missing

Your team decides: Review the quote

Your team decides: Sign off the final price

Passes on: the tender set out in the format the client asks for

9Chase the quotes

Automated: Set a follow-up date for each

AI reads and drafts: Draft each chaser

Your team decides: Approve and send each one

AI reads and drafts: Read replies for win or loss

Your team decides: Confirm the reason

AI reads and drafts: Sum up why work was lost

Ends with: the bid chased, and the result logged with the reasons

13automated

22by AI

17decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.