Set up the design
Cost each stage
Check and chase
Freeze and issue
01Track each scheme's consultant appointments, stage fees and outputs against the development budget
- Automated: Log each appointment and fee
- Automated: Match invoices to each stage
- Automated: Roll fees into the appraisal
- Automated: Flag gaps in work and warranties
- Your team decides: Instruct each stage
- Your team decides: Approve each invoice
Passes on: the team's fees and outputs by stage, set against the budget
02Compare an occupier's requirement schedule with the scheme's specification and the market standard before terms are agreed
- AI reads and drafts: List each occupier need
- AI reads and drafts: Match it to the spec
- AI reads and drafts: Flag gaps and upgrades
- Automated: Add cost and time notes
- AI reads and drafts: Draft the reply schedule
- Your team decides: Price and decide the offer
Passes on: what the occupier wants, next to your spec and the market norm
03Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks
- AI reads and drafts: Map the scheme to NRM1 elements
- AI reads and drafts: Pick like rates from past jobs
- Automated: Adjust for date and place
- AI reads and drafts: Draft the plan and assumptions
- Your team decides: Check quantities and rates
- Your team decides: Sign the cost plan
Passes on: a cost plan by element for this stage, from the drawings and past costs
04Explain cost plan movements between design stages
- Automated: Compare each cost plan version
- AI reads and drafts: Link each change to a cause
- Automated: Check the totals balance
- AI reads and drafts: Draft the commentary
- Your team decides: Check the reasons
- Your team decides: Sign off the report
Passes on: each move in the cost plan since the last stage, explained
05Log value engineering options with their cost, planning and sales impact and record each decision
- Automated: Record each VE option
- AI reads and drafts: Check it against consent and spec
- AI reads and drafts: Sum up the impact of each
- Your team decides: Get planning advice on changes
- Your team decides: Decide which options to take
- Automated: Record each decision
Passes on: VE options, with what each does to cost, planning and sales, and the call made
06Check design drawings against the building regulations guidance for the nation the site is in before submission
- AI reads and drafts: Pull sizes, uses and routes
- Automated: Run the rule checks
- AI reads and drafts: Read the Approved Documents
- AI reads and drafts: List issues with clause refs
- Your team decides: Judge every issue
Passes on: the drawings checked to the building regs for the nation the site is in
07Report late drawings and design information against the schedule
- AI reads and drafts: Match needed items to issued ones
- Automated: Work out how late each is
- AI reads and drafts: Draft the late information report
- AI reads and drafts: Suggest notices
- Your team decides: Confirm and decide on notices
Passes on: late drawings and design info, set against the date each was due
08Assess the knock-on effects of a design change on programme, cost, orders and other packages
- AI reads and drafts: Trace what the change touches
- AI reads and drafts: Estimate the effect on the programme
- AI reads and drafts: List who is affected
- AI reads and drafts: Draft the summary
- Your team decides: Value the change
- Your team decides: Decide on the instruction
Passes on: the effect of any change after freeze on cost, time and packages
09Keep the project document register current and catch out-of-date copies in use
- AI reads and drafts: Read numbers and revisions
- Automated: Update the register
- Automated: Check site sets are current
- Automated: Flag old copies in use
- Your team decides: Withdraw superseded copies
Passes on: the register kept current, so the tender uses the frozen set
10Draft employer's requirements from the company's standard specification and the scheme details
- Automated: Start from your standard spec
- AI reads and drafts: Add the scheme details
- AI reads and drafts: Flag conflicts and gaps
- Your team decides: Finalise the draft
- Your team decides: Have advisers check legal terms
- Your team decides: Approve the ERs
Ends with: the ERs, drafted from your own spec and the frozen design