Scheme design through the stages to a frozen design ready to tender

We take off your hands: tracking the design team appointments and what each stage must produce. Explaining moves in the cost plan. Testing savings until the design is frozen.

You get: each move in the cost plan explained against the appraisal. Savings tested. Late information chased. A draft of the employer's requirements. All of it for your development director.

Get a price for this

Or check first: Are we ready for AI?

The problem

Our schemes drift over budget stage by stage. Then we tender designs that are still changing.

How the steps join up

It starts when: you take on a design team for a scheme. That's once you've bought the land or got planning permission.

  1. Track each scheme's consultant appointments, stage fees and outputs against the development budget

  2. Compare an occupier's requirement schedule with the scheme's specification and the market standard before terms are agreed

  3. Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

    Your team checks and decides at this step.

  4. Explain cost plan movements between design stages

  5. Log value engineering options with their cost, planning and sales impact and record each decision

    Your team checks and decides at this step.

  6. Check design drawings against the building regulations guidance for the nation the site is in before submission

    Your team checks and decides at this step.

  7. Report late drawings and design information against the schedule

    Your team checks and decides at this step.

  8. Assess the knock-on effects of a design change on programme, cost, orders and other packages

  9. Keep the project document register current and catch out-of-date copies in use

  10. Draft employer's requirements from the company's standard specification and the scheme details

    Your team checks and decides at this step.

What you end up with: Consultant appointments and stage outputs are tracked, each stage's cost plan is explained against the appraisal, savings are tested when cost runs over, drawings are checked against the regulations, late information is chased, changes after freeze are assessed, and the employer's requirements go to tender from a frozen design.

Who signs it off: Your cost consultant signs the cost plans. Designers and building control judge if it all complies. Your development director signs off each stage. They sign the freeze too.

What it needs to work

  • An appraisal budget
  • Appointed consultants with stage outputs
  • A standard specification

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Scheme design through the stages to a frozen design ready to tender

Before, by hand

Set up the design

Cost each stage

Check and chase

Freeze and issue

01Track each scheme's consultant appointments, stage fees and outputs against the development budget

  • Log each appointment and fee
  • Match invoices to each stage
  • Roll fees into the appraisal
  • Flag gaps in work and warranties
  • Instruct each stage
  • Approve each invoice

02Compare an occupier's requirement schedule with the scheme's specification and the market standard before terms are agreed

  • List each occupier need
  • Match it to the spec
  • Flag gaps and upgrades
  • Add cost and time notes
  • Draft the reply schedule
  • Price and decide the offer

03Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • Map the scheme to NRM1 elements
  • Pick like rates from past jobs
  • Adjust for date and place
  • Draft the plan and assumptions
  • Check quantities and rates
  • Sign the cost plan

04Explain cost plan movements between design stages

  • Compare each cost plan version
  • Link each change to a cause
  • Check the totals balance
  • Draft the commentary
  • Check the reasons
  • Sign off the report

05Log value engineering options with their cost, planning and sales impact and record each decision

  • Record each VE option
  • Check it against consent and spec
  • Sum up the impact of each
  • Get planning advice on changes
  • Decide which options to take
  • Record each decision

06Check design drawings against the building regulations guidance for the nation the site is in before submission

  • Pull sizes, uses and routes
  • Run the rule checks
  • Read the Approved Documents
  • List issues with clause refs
  • Judge every issue

07Report late drawings and design information against the schedule

  • Match needed items to issued ones
  • Work out how late each is
  • Draft the late information report
  • Suggest notices
  • Confirm and decide on notices

08Assess the knock-on effects of a design change on programme, cost, orders and other packages

  • Trace what the change touches
  • Estimate the effect on the programme
  • List who is affected
  • Draft the summary
  • Value the change
  • Decide on the instruction

09Keep the project document register current and catch out-of-date copies in use

  • Read numbers and revisions
  • Update the register
  • Check site sets are current
  • Flag old copies in use
  • Withdraw superseded copies

10Draft employer's requirements from the company's standard specification and the scheme details

  • Start from your standard spec
  • Add the scheme details
  • Flag conflicts and gaps
  • Finalise the draft
  • Have advisers check legal terms
  • Approve the ERs

57tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Set up the design

Cost each stage

Check and chase

Freeze and issue

01Track each scheme's consultant appointments, stage fees and outputs against the development budget

  • Automated: Log each appointment and fee
  • Automated: Match invoices to each stage
  • Automated: Roll fees into the appraisal
  • Automated: Flag gaps in work and warranties
  • Your team decides: Instruct each stage
  • Your team decides: Approve each invoice

Passes on: the team's fees and outputs by stage, set against the budget

02Compare an occupier's requirement schedule with the scheme's specification and the market standard before terms are agreed

  • AI reads and drafts: List each occupier need
  • AI reads and drafts: Match it to the spec
  • AI reads and drafts: Flag gaps and upgrades
  • Automated: Add cost and time notes
  • AI reads and drafts: Draft the reply schedule
  • Your team decides: Price and decide the offer

Passes on: what the occupier wants, next to your spec and the market norm

03Draft an elemental cost plan to NRM1 from early drawings, brief and benchmarks

  • AI reads and drafts: Map the scheme to NRM1 elements
  • AI reads and drafts: Pick like rates from past jobs
  • Automated: Adjust for date and place
  • AI reads and drafts: Draft the plan and assumptions
  • Your team decides: Check quantities and rates
  • Your team decides: Sign the cost plan

Passes on: a cost plan by element for this stage, from the drawings and past costs

04Explain cost plan movements between design stages

  • Automated: Compare each cost plan version
  • AI reads and drafts: Link each change to a cause
  • Automated: Check the totals balance
  • AI reads and drafts: Draft the commentary
  • Your team decides: Check the reasons
  • Your team decides: Sign off the report

Passes on: each move in the cost plan since the last stage, explained

05Log value engineering options with their cost, planning and sales impact and record each decision

  • Automated: Record each VE option
  • AI reads and drafts: Check it against consent and spec
  • AI reads and drafts: Sum up the impact of each
  • Your team decides: Get planning advice on changes
  • Your team decides: Decide which options to take
  • Automated: Record each decision

Passes on: VE options, with what each does to cost, planning and sales, and the call made

06Check design drawings against the building regulations guidance for the nation the site is in before submission

  • AI reads and drafts: Pull sizes, uses and routes
  • Automated: Run the rule checks
  • AI reads and drafts: Read the Approved Documents
  • AI reads and drafts: List issues with clause refs
  • Your team decides: Judge every issue

Passes on: the drawings checked to the building regs for the nation the site is in

07Report late drawings and design information against the schedule

  • AI reads and drafts: Match needed items to issued ones
  • Automated: Work out how late each is
  • AI reads and drafts: Draft the late information report
  • AI reads and drafts: Suggest notices
  • Your team decides: Confirm and decide on notices

Passes on: late drawings and design info, set against the date each was due

08Assess the knock-on effects of a design change on programme, cost, orders and other packages

  • AI reads and drafts: Trace what the change touches
  • AI reads and drafts: Estimate the effect on the programme
  • AI reads and drafts: List who is affected
  • AI reads and drafts: Draft the summary
  • Your team decides: Value the change
  • Your team decides: Decide on the instruction

Passes on: the effect of any change after freeze on cost, time and packages

09Keep the project document register current and catch out-of-date copies in use

  • AI reads and drafts: Read numbers and revisions
  • Automated: Update the register
  • Automated: Check site sets are current
  • Automated: Flag old copies in use
  • Your team decides: Withdraw superseded copies

Passes on: the register kept current, so the tender uses the frozen set

10Draft employer's requirements from the company's standard specification and the scheme details

  • Automated: Start from your standard spec
  • AI reads and drafts: Add the scheme details
  • AI reads and drafts: Flag conflicts and gaps
  • Your team decides: Finalise the draft
  • Your team decides: Have advisers check legal terms
  • Your team decides: Approve the ERs

Ends with: the ERs, drafted from your own spec and the frozen design

16automated24by AI17decided by your team

Before, by hand

Set up the design

1Track consultant fees
2Check occupier needs

Cost each stage

3Draft the cost plan
4Explain cost plan moves
5Log VE options

Check and chase

6Check drawings against regs
7Flag late drawings

Freeze and issue

8Check knock-on effects
9Keep the register current
10Draft the ERs

57tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Set up the design

1Track consultant fees

Automated: Log each appointment and fee

Automated: Match invoices to each stage

Automated: Roll fees into the appraisal

Automated: Flag gaps in work and warranties

Your team decides: Instruct each stage

Your team decides: Approve each invoice

Passes on: the team's fees and outputs by stage, set against the budget

2Check occupier needs

AI reads and drafts: List each occupier need

AI reads and drafts: Match it to the spec

AI reads and drafts: Flag gaps and upgrades

Automated: Add cost and time notes

AI reads and drafts: Draft the reply schedule

Your team decides: Price and decide the offer

Passes on: what the occupier wants, next to your spec and the market norm

Cost each stage

3Draft the cost plan

AI reads and drafts: Map the scheme to NRM1 elements

AI reads and drafts: Pick like rates from past jobs

Automated: Adjust for date and place

AI reads and drafts: Draft the plan and assumptions

Your team decides: Check quantities and rates

Your team decides: Sign the cost plan

Passes on: a cost plan by element for this stage, from the drawings and past costs

4Explain cost plan moves

Automated: Compare each cost plan version

AI reads and drafts: Link each change to a cause

Automated: Check the totals balance

AI reads and drafts: Draft the commentary

Your team decides: Check the reasons

Your team decides: Sign off the report

Passes on: each move in the cost plan since the last stage, explained

5Log VE options

Automated: Record each VE option

AI reads and drafts: Check it against consent and spec

AI reads and drafts: Sum up the impact of each

Your team decides: Get planning advice on changes

Your team decides: Decide which options to take

Automated: Record each decision

Passes on: VE options, with what each does to cost, planning and sales, and the call made

Check and chase

6Check drawings against regs

AI reads and drafts: Pull sizes, uses and routes

Automated: Run the rule checks

AI reads and drafts: Read the Approved Documents

AI reads and drafts: List issues with clause refs

Your team decides: Judge every issue

Passes on: the drawings checked to the building regs for the nation the site is in

7Flag late drawings

AI reads and drafts: Match needed items to issued ones

Automated: Work out how late each is

AI reads and drafts: Draft the late information report

AI reads and drafts: Suggest notices

Your team decides: Confirm and decide on notices

Passes on: late drawings and design info, set against the date each was due

Freeze and issue

8Check knock-on effects

AI reads and drafts: Trace what the change touches

AI reads and drafts: Estimate the effect on the programme

AI reads and drafts: List who is affected

AI reads and drafts: Draft the summary

Your team decides: Value the change

Your team decides: Decide on the instruction

Passes on: the effect of any change after freeze on cost, time and packages

9Keep the register current

AI reads and drafts: Read numbers and revisions

Automated: Update the register

Automated: Check site sets are current

Automated: Flag old copies in use

Your team decides: Withdraw superseded copies

Passes on: the register kept current, so the tender uses the frozen set

10Draft the ERs

Automated: Start from your standard spec

AI reads and drafts: Add the scheme details

AI reads and drafts: Flag conflicts and gaps

Your team decides: Finalise the draft

Your team decides: Have advisers check legal terms

Your team decides: Approve the ERs

Ends with: the ERs, drafted from your own spec and the frozen design

16automated

24by AI

17decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.