Check every scope item is covered by exactly one trade package
We take off your hands: checking the whole tender scope against every package and chosen quote for items nobody priced or two trades priced.
You get: a list of gaps and overlaps, such as fire stopping or builder's work, with a suggested allowance or deduction for your estimator to decide.
Get a price for thisOr check first: Are we ready for AI?
The problem
We always find something nobody priced, usually between two trades.
How it works
What comes in
- Tender scope and BoQ, package scopes, selected quotations with inclusions and exclusions
What AI does
Maps every scope item to the packages and quotes that include it, and lists uncovered and double-covered items.
What you get
- Interface gap and overlap list with suggested guessed figures or deductions
Who signs it off
Your estimator decides how to cover each gap and adjusts the price.
What it needs to work
- Structured package scopes and levelled quotes
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?