Rail possessions, power connections and quality records
We take off your hands: planning possessions and handbacks, checking competence and fatigue rules, and tracking connection approvals and quality records.
You get: a checked plan and handback record for each possession, rosters inside competence and fatigue rules, and complete quality records, for your project managers.
Get a price for thisOr check first: Are we ready for AI?
The problem
One missed possession handback or one gap in the quality record costs us the job, the window or the next framework call-off.
What is in this package
- Track handover documents from the start of the job so nothing is chased at the end
- Review subcontractor RAMS against the site rules, construction phase plan and task hazards
- Find missing commissioning and test certificates before handover
- Assess the knock-on effects of a design change on programme, cost, orders and other packages
- Verify CSCS, CPCS, ECS and other skills cards through the official checks
- Keep the project document register current and catch out-of-date copies in use
- Report late drawings and design information against the schedule
- Summarise what changed between two drawing revisions
- Draft inspection and test plans from the specification and package scope
- Build the design responsibility matrix and flag gaps and overlaps
- Plan each rail possession or night closure and record the handback
- Raise NCRs from site, find the root causes and track them to close
- Infrastructure approval in principle to design and check certificatesWhole process
- Keep a live register of tickets, competent persons and scheme roles
15 more parts, which a call confirms.
We price a whole package as one build (our rule). A call confirms it.
What it needs to work
- Possession and access plans
- Competence records
- The network operator's or site licensee's requirements
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?