Built Logic

See what AI can do

Monthly high-rise fire safety checks to responsible person report

We take off your hands: planning the checks on lifts, sprinklers, doors, dampers and emergency lighting, reporting outages and quoting failures.

You get: one evidence pack for each building's responsible person, with outages reported and failures turned into priced remedial quotes.

Get a price for this

Or check first: Are we ready for AI?

The problem

Our high-rise clients need proof every month and the paperwork takes longer than the checks.

How the steps join up

It starts when: monthly checks fall due for a high-rise residential building you service under the Fire Safety (England) Regulations 2022.

  1. Plan large multi-site testing programmes around shutdowns, access windows and engineer capacity

    Your team checks and decides at this step.

  2. Run monthly firefighting lift and equipment checks for high-rise buildings

    Your team checks and decides at this step.

  3. Run fire door inspection programmes and record every access attempt

    Your team checks and decides at this step.

  4. Run annual fire damper drop-test programmes with priced remedials

  5. Check emergency lighting test records and turn failures into remedial work

    Your team checks and decides at this step.

  6. Keep high-rise floor plans and secure information box contents current

    Your team checks and decides at this step.

  7. Turn defects found on service visits into priced remedial quotes

    Your team checks and decides at this step.

  8. Produce each client's monthly service report

    Your team checks and decides at this step.

One more step, which a call confirms.

What you end up with: Every building's lifts, sprinklers, doors, dampers and emergency lighting are checked on time, outages are reported, failures become quoted remedials and the responsible person gets one evidence pack.

Who signs it off: Your competent engineers sign every test. The responsible person holds the legal duty and sends the notifications.

What it needs to work

  • A complete asset register by building
  • Access arrangements with the managing agent

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?