Built Logic

See what AI can do

Draft a schedule of dilapidations from the lease and inspection notes

We take off your hands: writing up every dilapidations item with its lease clause, breach, remedy and location after the inspection.

You get: a draft interim or terminal schedule with photo and clause references, for your surveyor to check before it is served.

Get a price for this

Or check first: Are we ready for AI?

The problem

Writing the dilaps schedule takes far longer than walking the building.

How it works

  1. What comes in

    • Lease and licences, inspection notes and photos, schedule of condition if any
  2. What AI does

    Maps observations to covenants, drafts breach and remedy for each item, and formats the schedule.

  3. What you get

    • Draft schedule of dilapidations with photo and clause references
  4. Who signs it off

    Your surveyor decides each breach and remedy and signs the schedule. Endorsement under the RICS standard stays with the surveyor.

What it needs to work

  • Lease documents and structured inspection capture

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Surveyors and cost consultants

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?