Built Logic

See what AI can do

Check every plot has its completion documents

We take off your hands: chasing all the papers each plot needs before it can complete. There are dozens.

You get: a complete plot pack and a list of what's missing. Draft chasers for your document controller to approve.

Get a price for this

Or check first: Are we ready for AI?

The problem

There are about thirty documents for each plot. Each week we complete, someone is out chasing a cert.

How it works

  1. What comes in

    • Certificates from subcontractors, warranty and building control records, energy certificates, choices sheets, inspection records
  2. What AI does

    Collects documents from inboxes and folders, matches them to plots, checks completeness and chases suppliers for approval.

  3. What you get

    • Complete plot pack, missing document list and supplier chasers
  4. Who signs it off

    Your document controller approves the chasers. They confirm the pack. No one certifies a thing on the system's say-so.

What it needs to work

  • A per-house-type document list
  • Documents arriving digitally

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Plot build progress to legal completion

Before, by hand

Track the plots

Pass the inspections

Get ready to complete

Completion day

01Track each plot's build stage and publish a weekly plot status

  • Confirm each stage
  • Log stage completions
  • Compare with the plan
  • Forecast plot finish dates
  • Send the weekly plot status
  • Act on late plots

02Sort site photos by plot and build stage and spot missing evidence

  • Match photos to plot and stage
  • File them by plot
  • Check each stage has photos
  • Confirm unsure matches
  • Take the missing photos

03Check each plot is ready for its warranty key-stage inspection

  • Check evidence against the checklist
  • Build the evidence pack
  • Flag the gaps
  • Fix the gaps

04Track warranty inspection items to close-out on every plot

  • Pull items from each report
  • Assign an owner
  • Track each to closure
  • Report trade trends
  • Check each fix
  • Confirm the close-out

05Check each plot's Part L photos are complete before details are covered

  • Read each photo and its data
  • File it by plot and detail
  • Alert on missing photos
  • Confirm each photo shows the detail
  • Pack the photos for the assessor
  • Sign off the as-built calculation

06Track design SAP, as-built SAP and EPC lodgement for every plot

  • Match energy proof to each plot
  • Find missing inputs
  • Chase the right person
  • Report plots at risk
  • Lodge the SAP and EPC
  • Resolve spec questions

07Track utility connections and meter details for each plot before completion

  • Read each connection letter
  • Pull out the meter details
  • Match them to each plot
  • Alert on missing items
  • Chase the providers

08Forecast monthly legal completions from build and sales progress

  • Pull build and sales status
  • Read solicitor and mortgage updates
  • Score each plot by month
  • Flag plots at risk
  • Agree the forecast

09Run each home's final quality check and issue the Schedule of Incomplete Work

  • Record the inspection
  • Draft the Schedule of Incomplete Work
  • Set dates for each item
  • Track each action
  • Sign off the check
  • Update the buyer

10Log pre-completion inspection findings and track the 30-day fix commitment

  • Read each inspection report
  • Log every item by plot
  • Flag breaches of warranty rules
  • Track fixes against 30 days
  • Decide who fixes what

This step11Check every plot has its completion documents

  • Pull documents from inboxes
  • Match them to plots
  • Check each pack is complete
  • Approve the chasers
  • Chase the suppliers
  • Confirm the pack

12Request development lender plot releases in time for each legal completion

  • Work out the release price
  • Draft the request
  • Approve each request
  • Track each release
  • Warn on any shortfall

13Coordinate completion day: keys, meter readings, home demonstration and first-week check-in

  • Book each step of the day
  • Send the buyer messages
  • Show the buyer round the home
  • Hand over the keys
  • Record meter readings and handover
  • Set the first week check-in

14Reconcile completion monies received against each plot's price, incentives and lender release

  • Read each statement
  • Match it to the sale and bank
  • Flag any gaps
  • Update the cash flow
  • Sort gaps with solicitors

76tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Track the plots

Pass the inspections

Get ready to complete

Completion day

01Track each plot's build stage and publish a weekly plot status

  • Your team decides: Confirm each stage
  • Automated: Log stage completions
  • Automated: Compare with the plan
  • AI reads and drafts: Forecast plot finish dates
  • Automated: Send the weekly plot status
  • Your team decides: Act on late plots

Passes on: a weekly status for every plot, from site updates

02Sort site photos by plot and build stage and spot missing evidence

  • AI reads and drafts: Match photos to plot and stage
  • Automated: File them by plot
  • Automated: Check each stage has photos
  • Your team decides: Confirm unsure matches
  • Your team decides: Take the missing photos

Passes on: photos sorted by plot and stage, with gaps flagged

03Check each plot is ready for its warranty key-stage inspection

  • AI reads and drafts: Check evidence against the checklist
  • Automated: Build the evidence pack
  • Automated: Flag the gaps
  • Your team decides: Fix the gaps

Passes on: if each plot is ready for its warranty key-stage visit

04Track warranty inspection items to close-out on every plot

  • AI reads and drafts: Pull items from each report
  • Automated: Assign an owner
  • Automated: Track each to closure
  • Automated: Report trade trends
  • Your team decides: Check each fix
  • Your team decides: Confirm the close-out

Passes on: each warranty item tracked until it is closed

05Check each plot's Part L photos are complete before details are covered

  • AI reads and drafts: Read each photo and its data
  • Automated: File it by plot and detail
  • Automated: Alert on missing photos
  • Your team decides: Confirm each photo shows the detail
  • Automated: Pack the photos for the assessor
  • Your team decides: Sign off the as-built calculation

Passes on: the Part L photos, checked as complete for the plot

06Track design SAP, as-built SAP and EPC lodgement for every plot

  • Automated: Match energy proof to each plot
  • Automated: Find missing inputs
  • Automated: Chase the right person
  • Automated: Report plots at risk
  • Your team decides: Lodge the SAP and EPC
  • Your team decides: Resolve spec questions

Passes on: the as-built SAP checked and the EPC lodged

07Track utility connections and meter details for each plot before completion

  • AI reads and drafts: Read each connection letter
  • AI reads and drafts: Pull out the meter details
  • AI reads and drafts: Match them to each plot
  • Automated: Alert on missing items
  • Your team decides: Chase the providers

Passes on: the utility hook-ups and meters for each plot

08Forecast monthly legal completions from build and sales progress

  • Automated: Pull build and sales status
  • AI reads and drafts: Read solicitor and mortgage updates
  • AI reads and drafts: Score each plot by month
  • AI reads and drafts: Flag plots at risk
  • Your team decides: Agree the forecast

Passes on: a forecast of the plots due to complete each month

09Run each home's final quality check and issue the Schedule of Incomplete Work

  • Automated: Record the inspection
  • AI reads and drafts: Draft the Schedule of Incomplete Work
  • Automated: Set dates for each item
  • Automated: Track each action
  • Your team decides: Sign off the check
  • Your team decides: Update the buyer

Passes on: a final check and a Schedule of Incomplete Work for the home

10Log pre-completion inspection findings and track the 30-day fix commitment

  • AI reads and drafts: Read each inspection report
  • Automated: Log every item by plot
  • AI reads and drafts: Flag breaches of warranty rules
  • Automated: Track fixes against 30 days
  • Your team decides: Decide who fixes what

Passes on: snags from the last inspection, each tracked to its 30-day fix

This step11Check every plot has its completion documents

  • Automated: Pull documents from inboxes
  • AI reads and drafts: Match them to plots
  • Automated: Check each pack is complete
  • Your team decides: Approve the chasers
  • Automated: Chase the suppliers
  • Your team decides: Confirm the pack

Passes on: a completion pack for the plot with no papers missing

12Request development lender plot releases in time for each legal completion

  • Automated: Work out the release price
  • AI reads and drafts: Draft the request
  • Your team decides: Approve each request
  • Automated: Track each release
  • Automated: Warn on any shortfall

Passes on: the lender's plot release, asked for in time

13Coordinate completion day: keys, meter readings, home demonstration and first-week check-in

  • Automated: Book each step of the day
  • Automated: Send the buyer messages
  • Your team decides: Show the buyer round the home
  • Your team decides: Hand over the keys
  • Automated: Record meter readings and handover
  • Automated: Set the first week check-in

Passes on: keys, meters, the home demo and a first-week call, all set

14Reconcile completion monies received against each plot's price, incentives and lender release

  • AI reads and drafts: Read each statement
  • Automated: Match it to the sale and bank
  • Automated: Flag any gaps
  • Automated: Update the cash flow
  • Your team decides: Sort gaps with solicitors

Ends with: the money for each plot, matched to its price and any incentives

37automated17by AI22decided by your team

Before, by hand

Track the plots

1Track plot progress
2Sort site photos

Pass the inspections

3Check stage readiness
4Close out inspection items
5Check Part L photos
6Track SAP and EPC

Get ready to complete

7Track plot utilities
8Forecast the completions
9Run the final check
10Log the inspection items
11Check plot packsThis step

Completion day

12Request plot releases
13Plan completion day
14Match completion monies

76tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Track the plots

1Track plot progress

Your team decides: Confirm each stage

Automated: Log stage completions

Automated: Compare with the plan

AI reads and drafts: Forecast plot finish dates

Automated: Send the weekly plot status

Your team decides: Act on late plots

Passes on: a weekly status for every plot, from site updates

2Sort site photos

AI reads and drafts: Match photos to plot and stage

Automated: File them by plot

Automated: Check each stage has photos

Your team decides: Confirm unsure matches

Your team decides: Take the missing photos

Passes on: photos sorted by plot and stage, with gaps flagged

Pass the inspections

3Check stage readiness

AI reads and drafts: Check evidence against the checklist

Automated: Build the evidence pack

Automated: Flag the gaps

Your team decides: Fix the gaps

Passes on: if each plot is ready for its warranty key-stage visit

4Close out inspection items

AI reads and drafts: Pull items from each report

Automated: Assign an owner

Automated: Track each to closure

Automated: Report trade trends

Your team decides: Check each fix

Your team decides: Confirm the close-out

Passes on: each warranty item tracked until it is closed

5Check Part L photos

AI reads and drafts: Read each photo and its data

Automated: File it by plot and detail

Automated: Alert on missing photos

Your team decides: Confirm each photo shows the detail

Automated: Pack the photos for the assessor

Your team decides: Sign off the as-built calculation

Passes on: the Part L photos, checked as complete for the plot

6Track SAP and EPC

Automated: Match energy proof to each plot

Automated: Find missing inputs

Automated: Chase the right person

Automated: Report plots at risk

Your team decides: Lodge the SAP and EPC

Your team decides: Resolve spec questions

Passes on: the as-built SAP checked and the EPC lodged

Get ready to complete

7Track plot utilities

AI reads and drafts: Read each connection letter

AI reads and drafts: Pull out the meter details

AI reads and drafts: Match them to each plot

Automated: Alert on missing items

Your team decides: Chase the providers

Passes on: the utility hook-ups and meters for each plot

8Forecast the completions

Automated: Pull build and sales status

AI reads and drafts: Read solicitor and mortgage updates

AI reads and drafts: Score each plot by month

AI reads and drafts: Flag plots at risk

Your team decides: Agree the forecast

Passes on: a forecast of the plots due to complete each month

9Run the final check

Automated: Record the inspection

AI reads and drafts: Draft the Schedule of Incomplete Work

Automated: Set dates for each item

Automated: Track each action

Your team decides: Sign off the check

Your team decides: Update the buyer

Passes on: a final check and a Schedule of Incomplete Work for the home

10Log the inspection items

AI reads and drafts: Read each inspection report

Automated: Log every item by plot

AI reads and drafts: Flag breaches of warranty rules

Automated: Track fixes against 30 days

Your team decides: Decide who fixes what

Passes on: snags from the last inspection, each tracked to its 30-day fix

11Check plot packsThis step

Automated: Pull documents from inboxes

AI reads and drafts: Match them to plots

Automated: Check each pack is complete

Your team decides: Approve the chasers

Automated: Chase the suppliers

Your team decides: Confirm the pack

Passes on: a completion pack for the plot with no papers missing

Completion day

12Request plot releases

Automated: Work out the release price

AI reads and drafts: Draft the request

Your team decides: Approve each request

Automated: Track each release

Automated: Warn on any shortfall

Passes on: the lender's plot release, asked for in time

13Plan completion day

Automated: Book each step of the day

Automated: Send the buyer messages

Your team decides: Show the buyer round the home

Your team decides: Hand over the keys

Automated: Record meter readings and handover

Automated: Set the first week check-in

Passes on: keys, meters, the home demo and a first-week call, all set

14Match completion monies

AI reads and drafts: Read each statement

Automated: Match it to the sale and bank

Automated: Flag any gaps

Automated: Update the cash flow

Your team decides: Sort gaps with solicitors

Ends with: the money for each plot, matched to its price and any incentives

37automated

17by AI

22decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.