Build a boundary dispute evidence pack from plans, deeds and old maps
We take off your hands: finding title plans, old deeds, historic maps and aerial photos and lining them up with your measured survey.
You get: an evidence pack with overlay drawings and a draft timeline of how the features on the ground changed, for your surveyor to analyse.
Get a price for thisOr check first: Are we ready for AI?
The problem
Half the fee on a boundary job goes on finding and lining up old maps and plans.
How it works
What comes in
- Title registers and plans, deeds, historic OS maps, aerial imagery, the practice's measured survey
What AI does
Collects sources, georeferences historic maps and imagery to the survey, builds overlays and a chronology of physical features, and drafts the evidence section of the report.
What you get
- Evidence pack, overlay drawings and draft evidence chronology
Who signs it off
Your surveyor weighs up the evidence and writes the opinion. Where the boundary lies is still a question for the court.
What it needs to work
- Licensed historic mapping and imagery
- Measured survey of the site
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Surveyors and cost consultants
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?